Original source · versioned page text
Reference Documents - RAL22/0034
FPE Ref: 6176-221031-1.0
Performance outcomes Acceptable outcomes Response
Safety of people and property
PO1 AO1.1 AO1.1
Development maintains the safety of people and property Development which will materially increase the number of people living or
Complies. The proposed development is not located
from the adverse impacts of bushfire. congregating on premises, including reconfiguring a lot, is not located within a
with a medium or high bushfire hazard area.
medium or high bushfire hazard area.
AO1.2 AO1.2
Development maximises setbacks from hazardous vegetation to achieve an
Complies. The proposed development is located at
acceptable risk.
a distance of acceptable risk.
Editor’s Note — PSP8 Natural Hazards provides guidance for assessing
bushfire hazard risk and preparing a bushfire hazard management plan.
Impacts on Ecologically Important Areas
PO2 PO2
Bushfire mitigation measures do not adversely impact on: No acceptable outcome provided
Complies. The proposed development is partially
located within existing cleared areas, with the
1. biodiversity values, connectivity and
surrounding vegetation predominantly comprised of
ecosystem functioning; and
2. the long term physical integrity of invasive camphor laurel along the waterways with no
waterways, wetland and areas of
ground storey or ladder fuels beneath.
native vegetation.
20 December 2022 Bushfire Hazard Assessment
Document Set ID: 22990715
22224494 38 Barina Court, Pomona, QLD 4568
Version: 1, Version Date: 24/04/2024
22/12/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.