Log in to see the plans as drawn SPECIFICATION FOR LANDSCAPE WORKS element design TM
PLANT SCHEDULE element design TM
Contractor to confirm plant quantities prior to ordering SCOPE PERFORMANCE
GENERAL CONDITIONS ALL LANDSCAPE CONSTRUCTION WORK IS TO BE CARRIED OUT IN COMPLIANCE WITH RELEVENT COUNCIL APPROVALS AND TO
SHRUB SPECIES INDUSTRY BEST PRACTICE. ANY CHANGES FROM DESIGN DOCUMENTATION MUST BE APPROVED BY PROJECT LANDSCAPE ARCHITECT
PRIOR TO CONSTRUCTION ON SITE.
Code Botanical Name Common Name Size Quantity EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE UNDERTAKEN WHERE NECESSARY TO ENSURE NO DETRIMENTAL EFFECT
TO DOWNSTREAM WATERWAYS OR NEIGHBOURING SITES.
SITE PREPARATION / PRIOR TO COMMENCEMENT OF WORKS, EXISTING SITE CONDITION IS TO BE DOCUMENTED BY CONTRACTOR. ALL EXISTING AND
CAL vim Callistemon viminalis "Slim" Callistemon - 'CV01' 200 pot 27 EARTHWORKS
PROPOSED SERVICES ON SITE ARE TO BE LOCATED AND CLEARLY IDENTIFIED. ALL BUILDING RUBBISH AND DELETERIOUS MATERIALS
ARE TO BE REMOVED FROM SITE TO APPROVED WASTE LOCATION.
LANDSCAPE AREAS SHALL BE SCARIFIED TO A MIN. DEPTH OF 150mm TO PROMOTE GOOD GROWTH FOR TURF AND PLANTING.
SYZ aus Syzygium Australe "Pinnacle" Syzygium - 'AATS' 200 pot 25
MATERIALS / SERVICES ALL MATERIALS TO BE USED IN THE CONSTRUCTION OF THE DESIGNED LANDSCAPE ARE TO BE OF AND INDUSTRY STANDARD QUALITY
AND FROM A SUSTAINABLE SOURCE WHERE POSSIBLE. NO MATERIALS USED ON SITE SHALL BE TOXIC TO HUMANS, ANIMALS OR
PLANTS.
ALL SELECT ITEM MATERIALS ARE TO BE APPROVED BY CLIENT PRIOR TO CONSTRUCTION ON SITE.
PROVIDE SERVICE CONDUITS TO ALL GARDEN BEDS FOR IRRIGATION AND DRAINAGE PURPOSE. PROVIDE CONDUITS FOR LIGHTING
WHERE REQUIRED.
ENSURE ADEQUATE DRAINAGE TO PLANTING AREAS FOR SPECIFIC SITE SOIL CONDITIONS VIA THE USE OF SLOTTED AGRICULTURAL
DRAIN (SELECT TYPE FOR APPLICATION), OVERLAND FLOW PATHS WITHIN GARDENS (SELECT RIVER GRAVEL ON GEOFABRIC
MATERIAL) AND SURFACE STORMWATER PITS (LOCATED IN GENERALLY CONCEALED POSITIONS).
PROPOSED HARDSCAPE ITEMS ARE TO BE CONSTRUCTED TO AUSTRALIAN STANDARDS AND RELEVENT COUNCIL CODES BY A
HARDSCAPE SUITABLY LICENCED CONTRACTOR. WORKPLACE HEALTH AND SAFETY REGULATIONS MUST BE IMPLEMENTED DURING CONSTRUCTION
PHASE.
PLANT MANAGEMENT ALL PLANT SPECIES ARE DETAILED WITHIN THE PLANT SCHEDULE . NO SUBSTITUTIONS ALLOWED WITHOUT PRIOR ACCEPTANCE BY
COUNCIL AND PROJECT LANDSCAPE ARCHITECT.
THE CONTRACTOR SHALL OBTAIN ALL PLANTS AS SPECIFIED FROM AN ACCREDITED NURSERY OR OTHER APPROVED SOURCE. PLANTS
SHALL BE PRE-WATERED PRIOR TO ARRIVING ON SITE.
PLANTS SHALL BE HEALTHY, HARDY AND OF GOOD FORM. THE ROOT SYSTEM OF EACH PLANT SHOULD NOT BE ROOTBOUND AND BE
CONDUCIVE TO SUCCESSFUL TRANSPLANTATION. ALL PLANTS TO BE PEST AND DISEASE FREE WITH CONTAINERS FREE FROM WEEDS.
STREET TREE SPECIES ARE TO COMPLY WITH NATSPEC AND RELEVENT COUNCIL CONDITIONS.
STAKE TREES WITH A MIN. OF TWO 50x50 HWD STAKES AND HESSION STRAP OR SIMILAR AS NOT TO DAMAGE TREE. FIGURE '8' DETAIL
RECOMMENDED.
NO TYPE OF STAKE TO BE PLACED THROUGH ROOTBALL OF PLANT AT ANY TIME.
EACH PLANT TO HAVE ADDED WATER CRYSTALS TO PLANTING HOLE AND WATERED IN AFTER PLANTING AS REQUIRED.
PLANT STOCK MAY BE REJECTED IF NOT CONFORMING WITH ABOVE SPECIFICATIONS.
PLEASE NOTE THIS LANDSCAPE
PLAN DOES NOT TAKE INTO
ACCOUNT ANY UNFORESEEN
SOFTSCAPE SETOUT OF ALL SOFTSCAPE AREAS TO BE IN ACCORDANCE WITH APPROVED PLANS. PLANTING AREAS TO BE MOUNDED TO ACHIEVE SUBSURFACE ROCK FORMATIONS.
ADEQUATE DRAINAGE AND AESTHETIC PRESENTATION.
AS 4419-2003, SOILS FOR SOIL: A GOOD QUALITY FRIABLE, MODERATELY DRAINING, ORGANIC ENRICHED LANDSCAPING SOIL MIX SHALL BE IMPORTED FROM AN AMENDMENTS
issue date description
LANDSCAPING AND APPROVED SOURCE. THE SOIL SHOULD NOT CONTAIN ANY CLAY AND BE FREE FROM CONTAMINENTS SUCH AS WEEDS, STICKS AND A 28.05.21 ISSUE FOR OPW APPROVAL
ROCKS. IMPLEMENTATION WITHIN GARDEN AREAS TO A MIN. OF 300mm DEPTH.
GARDEN USE ORGANIC MULCH: HOOP PINE MULCH IN ITS VARIETY OF FORMS IS TO BE SUPPLIED AND INSTALLED TO A MIN. DEPTH OF 100mm. MULCH
IS TO BE FREE OF FOREIGN MATTER INCLUDING WEEDS, SOIL, STICKS AND ROCKS. AVOID PLACEMENT OF MULCH AGAINST STEM OR
AS 4454-2003, COMPOSTS, TRUNK OF PLANTS. GRADE MULCH TO BE SELF RETAINED WITHIN GARDEN EDGING.
SOIL CONDITIONERS AND GRAVEL MULCH: SELECTED WASHED RIVER MULCH GRADED IN SIZE AND COLOUR. USE IN AREAS AS SPECIFIED ON PLANS. TO BE USED
MULCHES TO SEPERATE ORGANIC MULCH FROM THE WALLS OF BUILDINGS, ADJACENT PATHS AND TOO FACILITATE DRAINAGE WITHIN GARDEN
BEDS. MIN. DEPTH TO BE TWICE THE DIAMETER OF THE LARGEST PEBBLE.
TURF SHALL CONSIST OF A DENSE, WELL ROOTED, VIGOROUS GRASS GROWTH WITH MIN. 25mm OF TOPSOIL. TURF IS TO BE
TURF DELIVERED TO SITE WITHIN 24 HOURS OF BEING CUT. TURF SHOULD BE FREE FROM DELETERIOUS MATERIAL INCLUDING WEEDS,
(GREEN COUCH) SEEDS OR ROOTS INCLUDING NUT GRASS AND OXALIS. TURF SHALL BE SUPPLIED IN UNIFORM SIZE IN UNBROKEN CONDITION.
MOISTURE LEVEL OF TURF TO REMAIN CONSISTANT DURING LAYING. TURF TO BE LAID ALONG CONTOUR AND PINNED IF GREATER
THAN 1:4 SLOPE.
PREPARE SUBGRADE TO A LEVEL BASE WITH AN APPROVED TOPSOIL AND SPREAD UNDER TURF FERTILIZER AT RECCOMMENDED
RATE. TURF TO FINISH LEVEL WITH PATHS, EDGES AND KERBS AFTER ROLLING AND SETTLEMENT.
element design
landscape architecture
IRRIGATION TO BE INSTALLED BY A SUITABLY QUALIFIED CONTRACTOR AND BE INSTALLED IN ACCORDANCE WITH ALL COUNCIL WATER
IRRIGATION REGULATIONS.
MASTER PLANNING SUBDIVISIONS
COMMERCIAL DEVELOPMENTS RESORTS
PARKLANDS REVEGETATION MULTI-UNITS
(to be confirmed) THE MOST WATER EFFICIENT METHOD OF IRRIGATION IS TO BE USED, CONNECTED TO TANK SUPPLY WHERE POSSIBLE.
151 Brisbane Rd. Mooloolaba
CONDUITS TO BE LAID TO ALL GARDEN AREAS TO PROVIDE A REGULATED COVERAGE. FLUSH AND PRESSURE TEST PRIOR TO Phone 07 5444 6155
PO Box 1546, Buderim QLD 4556
COMMISSIONING. [email protected]
PROVIDE AS CONSTRUCTED DRAWINGS CLEARLY SHOWING LOCATION OF ALL IRRIGATION COMPONENTRY.
THE CONTRACTOR SHALL BE RESONSIBLE FOR THE CARE AND MAINTENANCE OF ALL LANDSCAPE WORKS FOR A PERIOD OF 13 WEEKS PROPOSED 2 LOT
LANDSCAPE AFTER COMPLETION.
PROJECT
SUBDIVISION AT
ESTABLISHMENT PERIOD MAINTENANCE IS TO INCLUDE MOWING OF TURF, REMOVAL AND SPRAYING OF WEEDS, PRUNING AND TRIMMING OF SHRUBS WHERE
9 BUTLER STREET
REQUIRED, REPLACEMENT OF DEAD OR DISEASED PLANT STOCK AND CORRECT WORKING OF IRRIGATION SYSTEM.
TEWANTIN
WATER IS TO BE PROVIDED TO ALL SOFT LANDSCAPING AT A REQUIRED RATE DURING THE ESTABLISHMENT PERIOD TO ENSURE
HEALTHY AND VIGOROUS GROWTH. CLIENT
KIERAN COURTNEY
DWG
TITLE LANDSCAPE PLAN
OPERATIONAL WORKS
issue
A
ED 20219 OPW - 02
north
-
APPROVED PLANS
OPW21/0160
Date MAY 2021
Scale 1:150 @ A3
DIAL BEFORE
NOOSA COUNCIL YOU DIG
Design
Sheet
JS
02 OF 03
Drawn JS
11 AUGUST 2021 WWW. 1100.com.au C COPYRIGHT 2010 ELEMENT DESIGN QLD PTY LTD
Copyright in the whole and every part of this document belongs to
-
ELEMENT DESIGN QLD PTY LTD and may not be used, sold,
LANDSCAPE PLAN - OPERATIONAL WORKS / SHEET 02
transferred, copied or reproduced in whole or in part in any manner or
form or in or on any media to any person without the prior written
consent of ELEMENT DESIGN QLD PTY LTD.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.