Council archive · source document
Minor Change Existing Approval - 51901 4863 08 (As Published) · 51901.4863.08
Page 17 of 24
Document Set ID: 24108101
Version: 5, Version Date: 09/09/2025
[OCR of page images]
aT
. Pathway-Contributions]|
"5. —» A-pathway-contribution- of $24-towards-external- major pathways.-in- accordance-
with-Planning-Scheme-Policy-PSP41-Coasta!l-Major Pathway: Contributions, -shall-
be-paid-to-the-Council-prior-to-the- Commencement: of: Use.- This: amount-will- be-
subject-to-varistions-in-the-Consumer-Price-Index, -All-Groups Brisbane from-June-
2005-until-the-dste-of payment.J
. Hesdwocks-Contributions]
"6. + Contributions: shall- be- paid: to- Council: in- accordance: with- Planning- Scheme-
Policies- PSP28- and- PSP30- on- Water Supply- Headworks; Contributions- and-
Sewersge- Headworks; Contributions: respectively- and- at-the- rates applicable: at-
the-time-of-payment.--An-estimate-only-of the contribution -retes-under-the-current-
policies-is- outlined: below.-- These: smounts- will- adjusted; in-line-with- changes-to-
the-Consumer-Price- Index, -All-Groups-Brisbane-from-June-2005-until-the-date-of-
payment],
=“WaterSupplye $9202
="Seweragen $8732
"TOTAL $1,7930 ®
. All- beadwarks-contributions-must-be-psid-prior to-the- Commencement of Use {|
« Further-Permits-Required]]|
"7. —» Prior-to-the- commencement: of- development, the-following- Development: Permit
must-be obtained
. 7.1. Development Permit for-Building-Works.J]
* THE-FOLLOWING-ADVICE S-ARE-FOR-INFORMATION-PURPOSES-ONLY-AND-DO-NOT-
FORM-CONDITIONS-OF-APPROVAL§
"4. —» Approval: of this-development: spplication- will-trigger- an- Infrastructure: Charge-in-
sccordsnce-with-the-Coastsl-Major Rosd-Network-Infrastructure-Charges-Plan-for-
the-amount-of $3,812-and-is-subject to-variations in the- Consumer Price-Index,-Alll-
Groups: Brisbane: from- June- 2005: until: the- date: of- payment.--An- Infrastructure-
Charge: Notice: will- be: issued: in- accordance: with- Chapter 5- of- the- Integrated-
Plianning-Act-1997.9)
"2. —» Payment-vis-credit-card-transaction-will-not-be-an-acceptable-method-of payment-
for- development: contributions- conditioned: in- this: permit: or- for: infrastructure-
charge-notices issued-separstely J
"3. The-plans forthe proposed -building-work-have-not-been-assessed for-compliance-
with-the-requirements-of-the-Building- Code-of-Austrslis-as-they-relate-to-people-
with- disabilities.- Your- attention: is- drawn: to- the- matter: that: either- or- both: the-
Disability- Discrimination- Act- 1992-(Commonwesith)- and: the: Anti-Discrimination-
Act-1991(Queensiand)-msay-impsct-on the proposed ‘building -work.]|
= Award-Winner-—Australian-Clean-Beach-~ a
Challenge-2004-Litter-Prevention?
Page 17 of 24
Document Set ID: 24108101
Version: 5, Version Date: 09/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 51901 4863 08 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.