Minor Change Existing Approval - 51901 4863 08 (As Published) · 51901.4863.08
Change to approval – 22 September 2005 for the Balcony
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plan of development. The approved plan is titled and numbered Extract of
Approved Plan No. WD3/14 and dated July 2005 and as may be amended by these
conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The balcony shall not be enclosed with shutters, glass panelling or the like, thus remaining
as an open structure.
Land Development
Park Contributions
4. A Park contribution of $58 towards the acquisition of additional parkland or the improvement
of existing parkland and facilities in the locality shall be paid to the Council prior to the
Commencement of Use in accordance with Council’s Planning Scheme Policy PSP24 Park
Requirements. This amount will be subject to variations in the Consumer Price Index, All
Groups Brisbane from June 2005 until the date of payment.
Pathway Contributions
5. A pathway contribution of $24 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council
prior to the Commencement of Use. This amount will be subject to variations in the Consumer
Price Index, All Groups Brisbane from June 2005 until the date of payment.
Headworks Contributions
6. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates under the current policies is outlined below. These amounts
will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
June 2005 until the date of payment.
Water Supply $920
Sewerage $873
TOTAL $1,793
All headworks contributions must be paid prior to the Commencement of Use.
Further Permits Required
7. Prior to the commencement of development, the following Development Permit must be
obtained:-
7.1. Development Permit for Building Works.
Change to approval - 17 August 2015 for Tenancy 18
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Page 2 of 24
Document Set ID: 24108101
Version: 5, Version Date: 09/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 51901 4863 08 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.