Council archive · source document
Minor Change Existing Approval - 51901 4863 08 (As Published) · 51901.4863.08
Page 8 of 24 Document Set ID: 24108101 Version: 5, Version Date: 09/09/2025 [OCR of page images] Document Set ID: 24108101 Version: 5, Version Date: 09/09/2025 Letter NcBlroy. 3 "od 14. 16. 17. 19% 20. 21. +5 te tet Tes state Te 2° ~ S2, Connection to Council's existing severage reticulation system. by a connection to the existing man-hole on the western boundary of the site and by a gravity main then ~ .to Council's future sewerage system in Hastings Street + at the Developer's . expense to the standards and: ' requirements of Council's Building Surveyor...” Pilling levels and floor levels of all buildings, other structures and car park srea levels shall be established to the requirements of the Ghire Enginenr. Such levels shall. be provided upon application to the Engineering Department. The minimum habitable floor level shall be RL 2m AD. Car parking may be RL 1.7m A.H.D. Pilling, other development works or the erection of any buildings or other structures shall be carried out so as net to cause any ponding of water on adjoining land or any blockage interference with natural watercourse or - in any other vay unduly affect adjoining property. Wo earthworka or filling enall Be carried out bn site until the issue of a Building Permit or as required by the Building Survoyor. . Stormwater, including that , from the roofed and paved areas to be piped to Council's existing drainage system at the developer's expense to the standards and requirements of Council's Building Surveyor. An identification survey of the subject site is to be carried out by a Licensed Surveyor and is to be submitted to. Council at the time of foundation inspection by Council's Building Surveyor or immediately thereafter. Such survey shall set out the boundaries of the site and the position of the buildings on the site. The applicant shall cause minimum disturbance to natural flora and shall only remove that vegetation which would impede building operations. Where practicable, revegetation of the site is to be carried out following completion of building activity. Landscaping snall be established and maintained in accordance with a landscaping plan approved by Council. Such plan shall be prepared in accordance with the provisions of the Noosa Design Manual. Page 8 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 51901 4863 08 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.