Council archive · source document
Operational Works Application OPW18-0335 · OPW18/0335
6.3) Additional aspects of development
( Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application
Bet Not required
Section 2 — Further development details
7) Does the proposed development application involve any of the following?
Material change of use (1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot (J Yes ~ complete division 2
Operational work & Yes — complete division 3
Building work _] Yes — complete DA Form 2 — Building work details
Division 1 ~ Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.
8.1) Desenbe. the proposed material change of use :
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)
(S122) BTel=rS tale fel fo)olels(—re) Fe Tn gol ie eso) existing buildings on the premises?
[1 Yes
[1 No
Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the (ecco : : ;
9.2) What is the nature of the lot reconfiguration ?. (tick all applicable boxes}
(1 Subdivision (complete 10) ( Dividing land into parts by agreement (complete 11))
[1 Boundary realignment (complete 12)) {] Creating or changing an easement giving access to a lot
from aconstruction road (complete 13))
(Oech ;
10.1) For this development how many lots are being created and What's the intended Use of those (ots:
intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
10.2) Will the subdivision be staged?
(1 Yes — provide additional details below
[I No
How many stages will the works include?
What stage(s) will this development application
apply to?
Page 4
DA Ferm 1 — Development Application details
Version 1.1— 22 JUNE 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW18-0335.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.