Skip to the record
Accept no substitutions.

Council archive · source document

Operational Works Application OPW18-0335 · OPW18/0335

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

  
   

6.3) Additional aspects of development

( Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application

Bet Not required

 

Section 2 — Further development details
7) Does the proposed development application involve any of the following?

   

  

 

 

 

Material change of use (1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot (J Yes ~ complete division 2

Operational work & Yes — complete division 3

Building work _] Yes — complete DA Form 2 — Building work details

 

 

 

Division 1 ~ Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.

8.1) Desenbe. the proposed material change of use :
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor

 
    

proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)

 

 

 

 

 

 

(S122) BTel=rS tale fel fo)olels(—re) Fe Tn gol ie eso) existing buildings on the premises?
[1 Yes
[1 No

   

 

 

 

 

 

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.

9.1) What is the total number of existing lots making up the (ecco : : ;

9.2) What is the nature of the lot reconfiguration ?. (tick all applicable boxes}

     
 
   
    

 

 

 

(1 Subdivision (complete 10) ( Dividing land into parts by agreement (complete 11))
[1 Boundary realignment (complete 12)) {] Creating or changing an easement giving access to a lot
from aconstruction road (complete 13))

 

 

  
    
 

(Oech ;
10.1) For this development how many lots are being created and What's the intended Use of those (ots:
intended use of lots created Residential Commercial Industrial Other, please specify:

  
        
 
  

 

 

 

  
 

Number of lots created
10.2) Will the subdivision be staged?
(1 Yes — provide additional details below
[I No

How many stages will the works include?

What stage(s) will this development application
apply to?

 

 

 

 

 

 

 

Page 4
DA Ferm 1 — Development Application details
Version 1.1— 22 JUNE 2018

Used in these records

About this file

File size
9.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW18-0335.pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.