Council archive · source document
09/0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published] · 142009.982
INTEGRATED PLANNING ACT 1997
Part P. Version 2.1. 3 March 2008
Name of RPEQ of equivatent * | John Norden and Associates
RPEQ No. or equivalent
Contact matling address: ~ _|Office 16 Tewantin Plaza, Moorindil St, Tewantin Q 4565
(Contact telephone number ~ 154497137
Contact facsimile number eo 154497172
Reference riumber of all plans fo which this is cortcaton ees
Mandatory information «
5. Confirm the following mandatory information accompanies this application.
Plaris and written documentation Pa 1 Soe an
(i) The location and Givonelore fe popoaed Wal wick Risdon hes abuting the proposed |
work and the tidal and on which the work is proposed to be located [x] Confirmed | over the counter
(ji) All other structures on the waterfront and within 20 metres of the proposed works [X] Confirmed over the counter
(il) __ The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and
Mean High Water Springs (MHWS) (Confirmed —_| over the counter
(iv) The slope angies of the beds and banks of the tidal area (1 Confirmed
(v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the
Coastal Protection and Management Regulation 2003, schedule 4A (e.g. physical appearance, lighting, Confirmed over the counter
signage, earthworks, public access, infastructure, structural components, engineering design standards)
(vl) The finished levets of the proposed works [EX] Confirmed over the counter
(C1 Confirmed
(vii) — Oetalls of the largest vessel, if any, to be moored at the structure
[EX] Net applicable
(vi) Evidence that the proposed work will not prejudice the access rights of adjoining property CL Confirmed
owners DX] Not applicable
OFFICE USE ONLY
Date Received Reference Numbers LC ti‘“‘CSCSCSY EPA cost code | 433061
Advice for completing Part P
L
L
L
General advice
Part A must also be completed for all IDAS development applications.
1 The applicant is responsible for answering all questions fufly and correctly, untess following a response there is a statement to go directly to another
question.
nh When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) use the process from the information sheet Electronically
paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transfer (EFT) payment notification to the application.
1. For further information about completing this form go to:
IDAS Guide 24 {Prescribed tidal work}
Eooaccess wepsite
Qi
A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.
Qa
A Registered Professional Engineer of Queensland (RPEQ), or the interstate equivatent, may certify that the proposed work complies with the
design and safety provisions of the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003, schedule
4A. The provision of the certification may reduce the applicable fee for assessment of the work by the jocal goverment.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.