Council archive · source document
09/0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published] · 142009.982
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
SECTION 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
HERITAGE
141A
Is apy part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
No-Gotoar.18 ([] Yes ‘
If yes, has an exemption certificate for the proposal’ been issued under the Queensland Heritage Act 1992?
(Yes DNo
If no, is the proposed work liturgical development under Queens/and Heritage Act 1992, section 78?
Yes CINo .
If no, is the work being carried out by the State?
Ol Yes oO No - (Complete Form 1, Part C1) This application requires assessment by the Environmental Protection Agency {EPA).
if EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.
1, Schr loble 2 Rem 18
IPA, schedule 8, part
He 3, than 2: IP Regu
1.18
Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of the
Queensland Heritage Act 1992, other than if place is on Cairns or Mackay airport fand?
[I No - Goto a1.2 OYes
If yes, does the following apply?
(i) development for public housing, as defined by the integrated Planning Act 1997 (IPA), chapter 5, Oo No [] Yes @
pari6
(ii) development carried out by the state on land designated for community infrastructure under the [-]No (Yes
IPA, chapter 2, part 6
(ii) development that is exempt from assessment against a planning scheme under the IPA, schedule []No [L] Yes
If no to all of (i) — (ii) above - (Complete Form 1, Part C2) This application requires assassment by the relevant local government as Concurrence
Agency,
IPA, schaduile 8, sit 1 lable § tem 2A. IP Rogutation, schedule 1, part &. table 5, em 2: Augart Aunete (Reviruclurina and Ossposays Act 2006, ¢ 54,
“REMOVING QUARRY MATERIAL; WILD-RIVERAREA-- ---- Fees ot oe - . de
1.2 | Does’the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoar3 (Yes
I yes, is an allocation notice required under the Water Act 2000?
No C1 Yes
if yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
~Rivers Act 2005? :
| No — (Complete Form 1, Part Kx) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not
the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.
{J Yes - Unless the application is consistant with any properly development plan eppiying {0 the land, the Assessment Manager must reluse to receive #.
(Complete Form 1, Part Kr). f NRW is nat the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005,
teeny fable 2. itany 47, a) Seti table 5 trai 2 (ws fata A ), section GACY
1} In this IBAS Assessment Checklist, the term proposal refers to he proposed use, work or lot reconfiguration the subject of the application.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.