INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 22

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA (continued)

 

Ifo, is any ERA an extraction ERA intended to be located outside waters?

oO No — Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by
an allocation notice, the Assassment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires
assessment by the Administering Authority for the purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act
20085. if the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.

(J Yes

Ifyes, does the ERA meet the following? A

{i) the activity is located inside a flood management area and a borrow pit of not (No!L Yes
more than 10,000m°for -

¢ — specified works under the Wild Rivers Act 2005; or
+ _ residential complexes, as defined under the Environmental Protection Act 1994

(ii) the activity is located outside a flood management area . (No [] Yes

 

 

 

 

 

 

 

If yes to either (i) or (ii) above - Uniess the application is consistent with any property development plan applying to the land, and
the application is accompanied by en allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1,
Part G). This application requires assessment by the Administering Authority for the purposes of both the Environmental
Protection Act 1994 and, subject to the declaration for the relevant wild river area, the Wild Rivers Act 2005, If the Administering
Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

If no to both (i) and (ii) above - An appiication for the ERA wil! be taken to be no! properly made and the Assessment menager must
refuse to receive it.

IPA schedule 8, part |. tabla 2, dem 1; IPA, schedule 2, part 1. taiie 5, dems 3 and ¢: 1P Regulation. scheuite 2, iabie 2. hams { and 23, Environunedtai Protection Act 1996, szelan 7RAA twild
ver area}, Wid Kivers Aci 2008. section 424; relevant wild over daclaratony Wid Rivers Code,

 

WITHIN THE LIMITS OF A PORT

 

14 Ilsa

Yy part of the premises within the limits of a port under the Transport infrastructure Act 1994?
No. Gotoa.5 *{] Yes

If yes, is that part of the premises below high waler mark?
No
~ (Yes - ifanswers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA; schéduile
8 - Answer (a) to (c) below. This application requires assessment by the Port Authority for the land., if you answer no to (a), (b) and
(c) below, the Port Authority for the Port has jurisdiction as Advice Agency.

(a) [s any part of the proposal within 200m of a shipping channel or an entry and exit shipping corridor for the Port?

> >

 

 

 

 

No LJ YeS — The Port Authority for the Port has jurisdiction as Concurrence Agency.
(b) Is any part of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage or spoil grounds?
C1No (11 Yes - The Port Authority or the Port has jurisdiction as Concurrence Agency.
(c) Is any part of the proposal within 1,000m-of a planned port facility identified ina land use plan?
(No (1 Yes - The Pon Authority for the Port has jurisdiction as Concurrence Agency.
# Regulation, schindiiie 2 tabla 2, dems 1 and 16.
DECLARED FISH HABITAT AREA
1,5 | Oogs any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

No - Goto 01.6

Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8,
this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the Assessment
Manager for the application, the agency has jurisdiction as Advice Agency.

26.

 

JF Regulation, sclexide 2, fata 2. th

 

 

Page 4

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published].pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.