Council archive · source document
09/0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published] · 142009.982
INTEGRATED PLANNING ACT 1997 Part P. Version 2.1, 3 March 2008 Certification 3 4. Has a Registered Professional Engineer of Queensland (RPEQ) or interstate equivalent certified that the works comply with the design and safety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and Management Regulation 20037 & No (1 Yes - Provide details below ‘Mandatory information 5 . J i 5. Confirm the following mandatory information accompanies this application. Confirmation of lodgemeitt< Method of odgement Plans and written documentation. (i) TT locaton and dimensions of the proposed Wal workin reaton wo The os abng Te proposed | work and the tidal land on which the work is proposed to be located S<] Confirmed | over the counter (ji) Allother structures on the waterfront and within 20 metres of the proposed works [X] Confirmed over the counter (iii) The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and Oo Confirmed Mean High Water Springs (MHWS) (iv) The slope angles of the beds and banks of the tidal area [X] Confirmed over the counter (v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003, schedule 4A (e.g. physical appearance, lighting, |X] Confirmed —_| over the counter signage. earthworks, public access, infrastructure, structural components, engineering design standards) (vi) The finished levels of the proposed works [] Confirmed —_| over the counter (1 Confirmed (vii) Details of the largest vessel, if any, to be moored at the structure EX] Not applicable (vi) Evidence that the proposed work will nt prejudice the access rights of adjoining property [7] Confirmed owners (XJ Not applicable OFFICE USE ONLY Date Received Reference Numbers [sid EPA cost code | 433061 Advice for completing Part P General advice le — Part A must also be completed for all IDAS development applications. l» — The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. >» When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) use the process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transfer (EFT) payment notification to the application, e For further Information about completing this form go to: . IDAS Guide 24 (Prescribed tidal work) ° Eooaccess website . EPA Guidelines and procedural quides 01 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur. a4 A Registered Professiona! Engineer of Queensland (RPEQ), or the interstate equivatent, may certify that the proposed work complies with the design and safety provisions of the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003, schedule 4A. The provision of the certification may reduce the applicable fee for assessment of the work by the local goverment.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.