09/0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published] · 142009.982
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfist. Version 22
SECTION 4 . section 4 must be completed when the application seeks approval to cary out operational work,
(PLANNING SCHEME - ‘ _ |
44 Is the proposed operational work assessable under any State planning regulatory provisions?
(No (J Yes
If no, is the proposed operational work assessable under the planning scheme?
(No - Goto 042 (7) Yes - complete Form 1, Part E and answer Q4.1.1 - 4.1.7 below
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD raver)
‘AREA . .
42 Is any of the proposed operational work associated with reconfiguring a fot and the reconfiguration is also assessable?
[KX] No -Gotwoas3 {_] Yes
IPA schedule 8, part t (ab'e 4, tem 2 IP Reguiation, schedule 1, part 2, table 5 tens hie)
Wild Rivers code (Note: the core does not curently contam applicable provisions for residential industrial or commercial development inside a designatcd urban
area}
[KOALA CONSERVATION (taside SEQ urban footprint) |
43A Is any part of the premises in an interim koala habitat protection area?
[KI No -Gotoas3e (] Yes
IP Regulation, schedule ¢ title 2, ten 34A
VEGEFATION CLEARING; KOALA CONSERVATION: WILD RIVER AREA ~ ° |
4.38 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[BX No -Gotoass ([] Yes
IPA, schedule 8 part 1, table 4, lems 1A-1G; IP Regulation, schedule 2 table 7, tem $ (vegetation clearing); 1P Regulation, schodule 2 table 2, dem 34 (koala
conservation), IP Requiation, schedule 1. part 3, table 4. item (vegetation clearing/wald aver area): Vegetation Management Act 1999, section 22A (vegetation
clearingiwild river area); Wid Rivers Act 2005. sections JF and 43A
‘TAKING OR INTERFERING WITH WATER; WILD RIVER AREA |
. a
44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?
DR] No -Go1oass {T] Yes - Answer (a) and (0) below
IPA, schedule 8, part 1. table 4, dems 3(a): IP Regulation, schedule 2, (able 2, item 8:1P Regui:tion schedule t, patt 3. table 4, doms 3 and 3A, Water Act 2000, section 968A (wiki river
area): Wild Rivers Act 2005, section 434; relovant wiki aver declaration; ‘Wild Rivers Code
45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water {other than using a walter truck to pump water)?
ER No Gotoas6 [] Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). ff NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schedule & part 1, table 4, tern 3(b), IP Regulation, schedule 2, fable 2 item 8, 1 Requlation, schedule 7, part 3, table 4, tem 3
Wild Rivers code {Nole: the code does not currently contain applicable provisions for taking of mlesfecng with aitesian water)
46 \s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
(No -Gotoaa7 ([] Yes - Answer (a) and (b) below
IPA scnodiie 8 pat) fable 4 om Stchid WP Regulanion schcdule 2 able 7 stom § oP Reguiaion schedule | part 3 lanle 4 dom 3 Vater Act 2000, section 966A fuald aver ae),
Wild Rivers Act 2005. sevnon 434 relevant wid fiver declaration vatd Rivers Code
47 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water}?
[XJ No -Gotoare [_] Yes
IPA, schedite 8 part} table 4 item 3ferfi IP Requtation, scnedute 2 table 7 tem & IP Regulauon, scheduie 1 part 3 taille 4. kent 3
Water Act 2000. sechon S864 fwild nver arca¥Note no current Wild Rever declaranon identifies takiin or interfonna sith subartesian water as assessable’
Wict River cove (Note the come aos vot cunenty conan applicable prowsions for sub artesian water
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
6] No -Gotoaa9 [[] Yes - Answer bath (a) and (b) below
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.