Skip to the record
The only place to find full transcripts.

Original source · versioned page text

178 Jorss - Architectural Drawings 23_11_21

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                                                                                  rev  date   issued details
                                 client sign-off:   date:
                                                                                                                                                                   A 06.08.21 MC Detailed Design
                                                                                                                                                                                                                                                        Detailed Design



                Detailed Design
                Proposed New Residence for                                                            Drawing Schedule
                                                                                                        0 Title, Notes and Materials Schedule                              DD       3.3     Section C                                      A
                                                                                                                                                                           DD       3.4     Section D                                      A
                Nick and Katie Jorss at                                                                      DD
                                                                                                        1 Plans
                                                                                                                     0.0    Title Sheet                              A
                                                                                                                                                                         4 Window and Door Schedules
                                                                                                                                                                           DD       4.1     Door Schedule                                  A
                                                                                                             DD      1.1    Site Plan                                B
                                                                                                                                                                           DD       4.2     Door Schedule                                  A
                34 Plover Street Peregian Beach QLD                                                          DD
                                                                                                             DD
                                                                                                                     1.1a
                                                                                                                     1.2
                                                                                                                            Site Cover Diagrams
                                                                                                                            Basement Floor Plan
                                                                                                                                                                     #
                                                                                                                                                                     B
                                                                                                                                                                           DD
                                                                                                                                                                           DD
                                                                                                                                                                                    4.3
                                                                                                                                                                                    4.4
                                                                                                                                                                                            Window Schedule
                                                                                                                                                                                            Window Schedule
                                                                                                                                                                                                                                           A
                                                                                                                                                                                                                                           A
                                                                                                             DD      1.3    Ground Floor Plan                        A
                                                                                                                                                                           DD       4.5     Window Schedule                                A
                                                                                                             DD      1.4    First Floor Plan                         A
                Date: Tuesday, 23 November 2021                                                              DD
                                                                                                             DD
                                                                                                                     1.5
                                                                                                                     1.5a
                                                                                                                            Roof Plan
                                                                                                                            Height Limit Perspectives
                                                                                                                                                                     B
                                                                                                                                                                     #
                                                                                                                                                                         7 Perspectives
                                                                                                                                                                           DD       7.1     Perspectives - View From South West            B
                                                                                                             DD      1.6    Basement Electrical Plan                 B     DD       7.2     Perspectives - View from West                  B
                                                                                                             DD      1.7    Ground Floor Electrical Plan             A     DD       7.3     Perspectives - View from North West            B
                                                                                                             DD      1.8    First Floor Electrical Plan              A     DD       7.4     Perspectives - View from North                 B
                                                                                                        2 Elevations                                                       DD       7.5     Perspectives - View from North East            B
                                                                                                                                                                           DD       7.6     Perspectives - View from East                  B
                                                                                                             DD      2.1    North Elevation                          A
                                                                                                                                                                           DD       7.7     Perspectives - View of Courtyard               B
                                                                                                             DD      2.2    East Elevation                           A
                                                                                                                                                                           DD       7.8     Perspective - View of Living                   B
                                                                                                             DD      2.3    South Elevation                          A
                                                                                                                                                                           DD       7.9     Perspectives - View of Linkway                 B
                                                                                                             DD      2.4    West Elevation                           A
                                                                                                                                                                           DD       7.10    Perspectives - View from Upper Bed             B
                                                                                                        3 Sections                                                         DD       7.11    Perspectives - View From Rumpus Room           B
                                                                                                             DD      3.1    Section A                                A     DD       7.12    Perspectives - Birds Eye From North East       B
                                                                                                             DD      3.2    Section B                                B




                                                            a: shop 5, 212 david low way, peregian beach, qld 4573
                                                            p: (07) 5471 3033                                               New Residence                                                                                              Scale

                     sparks architects                      www.sparksarchitects.com
                                                                                                                            34 Plover Street Peregian Beach QLD            Nick and Katie Jorss                  178        MC         Title Sheet   DD 0.0
                                                            sparks architects pty. ltd. abn 89 124 611 721
                                                            qld architect's registration No. 3974                           project                                        client                                job no.    drawn      drawing       dwg no.
GSPublisherVersion 672.6.38.16
Log in to download the original file

178 Jorss - Architectural Drawings 23_11_21.pdf · 13.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.