 APPROVED PLAN
    51989.294.02
  NOOSA COUNCIL
14 SEPTEMBER 2022


[OCR of page images]
 
  

THE RETREAT - SITE PLAN

 

 

ORIGINAL ILLUSTRATION: CRA

 

 

 

 

 

APPROVED PLAN
51989.294.02

NOOSA COUNCIL

14 SEPTEMBER 2022

 

 

 

 

 

 

 

 

 

ay
Rev | Date Description BLA C K _ _ Gontactinformation: Project: Drawing Title: Project No. Drawn By Drawing No.
A 19/02/2021 | PRELIMINARY LAYOUTS FOR REVIEW PO Box 781 Tewantin O 4565
B 13/07/2021 | PRELIMINARY FOR REVIEW Architect Registration # 5386 QLD THE RETREAT SITE PLAN 2021 36 PT SK_3.01
C__ [01/03/2022] PRELIMINARY FOR REVIEW W O O Di _sPh:0416037 424 .
D 22/06/2022| FOR PLANNING APPROVAL [email protected] 390 David Low Way, Peregian Beach QLD Scale Date Project Stage Revision
od architecture & design _wwwoblackwoodarchitecturecomau 4573 1:1 @A3 22/06/2022 Concept Design  D

 

 

 

 
Full text of the other 22 pages

Page 2

        -
 APPROVED PLAN
    51989.294.02
  NOOSA COUNCIL
14 SEPTEMBER 2022


[OCR of page images]
THE RETREAT - PROPOSED BASEMENT PLAN

 

= NEW CONSTRUCTION
WORKS

 

 

 

LINE OF FLOOR OVER

 

EXISTING BLOCK WALL

   
 

[KLINE OF BEARER OVER

LINE OF DECK OVER

EXISTING POSTS
PROPOSED LOUVRE WINDOW

PROPOSED SHELVING
OUTLINE OF BUILDING ABOVE

PROPOSED TIMBER FRAME WALLS -
CLADDING TO MATCH EXISTING BATTENS

PROPOSED BLOCK RETAINING WALL
PROPOSED LOUVRE WINDOW

EXISTING POSTS

PROPOSED CONCRETE SLAB

SOLID CORE DOOR - TIMBER BATTEN
CLADDING TO MATCH SURROUNDING

 

APPROVED PLAN
51989.294.02
NOOSA COUNCIL
14 SEPTEMBER 2022

 

EXISTING BLOCK WALL

 

 

 

 

—<_____ PAVERS TO ACCESS EXISTING PATH

 

 

 

 

 

 

Rev | Date Description B L A Cc K Contact information: Project: Drawing Title: Project No. Drawn By Drawing No.

A 19/02/2021 | PRELIMINARY LAYOUTS FOR REVIEW PO Box 781 Tewantin O 4565

B__| 13/07/2021] PRELIMINARY FOR REVIEW Architect Registration # 5386 QLD THE RETREAT PROPOSED BASEMENT 202136 PT SK-4.3

C__]01/03/2022| PRELIMINARY FOR REVIEW W O O Ds Phio416037 424 PLAN

D__| 22/06/2022| FOR PLANNING APPROVAL [email protected] 390 David Low Way, Peregian Beach QLD Scale Date Project Stage Revision
architecture & design _wwwolackwoodarchitecturecomau 4573 1:50 @ A3 22/06/2022 Concept Design  D

 

 

 

 

Page 3

        -
 APPROVED PLAN
    51989.294.02
  NOOSA COUNCIL
14 SEPTEMBER 2022


[OCR of page images]
THE RETREAT - PROPOSED GROUND FLOOR

 

 

 

 

 

 

 

= NEW CONSTRUCTION

WORKS (02 (04

 

 

 

 

 

 

 

 

 

 

  
    

  

 
   
   
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8,100 3,200 L
100°)p 3,900 100 Ly) 3,900 100) 4
A 7171 7
Aw AW AW ) 2
M | | |
ENTRY pp DP 5
co N
COLP — y
o |
oOo
S|2 8
N BATHROOM S
TILE
~~
S| Oo
oO}
Se OO 5 ~
~S z o
oa
RZ
on) [oJ | fot)
Or |e BEDROOM 2 VV
+ TILE
2
Oo
8 S|
Sls QS} yz
= x x 3 (or
RK 52 c
IN
(03
MASTER
oO TILE o
oO So
Oo On
oj TB - |S
APPROVED PLAN
S| S 51989.294.02
RS nw NOOSA COUNCIL
DP DP 14 SEPTEMBER 2022
AW 1 AW!
100 Lp 2,900 100), 1,000 1)100 3,800 100 py 3,200 b
771 771 717} 7171 7
ZA
402
5
Rev | Date Description B L A Cc K Contact information: Project: Drawing Title: Project No. Drawn By Drawing No.
A_|19/02/2021| PRELIMINARY LAYOUTS FOR REVIEW PO Box 781 Tewantin Q 4565
B | 13/07/2021] PRELIMINARY FOR REVIEW designs, 7 Architect Regietaron #5386 QLD THE RETREAT PROPOSED GROUND 202136 PT SK_4.4
C__]01/03/2022| PRELIMINARY FOR REVIEW theo! ove the proven of W O O Ds Phio416037 424 FLOOR
D__| 22/06/2022| FOR PLANNING APPROVAL Blackwood ang must no be used, [email protected] 390 David Low Way, Peregian Beach QLD Scale Date Project Stage Revision
turtton authority of slackood architecture & design _wwwolackwoodarchitecturecomau 4573 1:50, 1:200 @ A3 22/06/2022 Concept Design  D

 

 

 

Page 4

        -
 APPROVED PLAN
    51989.294.02
  NOOSA COUNCIL
14 SEPTEMBER 2022


[OCR of page images]
THE RETREAT - PROPOSED LEVEL 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LeSy NEW EXTERNAL BLIND - VENTAL OR SIMILAR (OPERABLE/RETRACTABLE)
= NEW CONSTRUCTION =
WORKS 90 x 45mm ALUMINIUM FRAME TO SUPPORT BLINDS
LINE OF ROOF OVER
Ro BS
1
1
I
I
' NEW TOP HUNG WINDOW TO MATCH EXISTING
ENGINEER TO SPECIFY NEW LINTEL
bo E22
I
I
DINING
DASHED LINE INDICATIVE OPTION 2:
PULL OUT DRAWER PTY EXISTING BALUSTRADE
I
PO
NEW OXXO SLIDING DOOR
(oN BS
I N 4
EXTENQ KITCHENWBENCH |
I SD 4
Lal | A
con | Gor)
vo | CS
“~ /” \ |
7 |
N NEW /
\ / |
(03, | INTEGRATED | ——~NEW BOOKSHELF
USA FRIDGE / LIVING COST OPTION TO REPLACE WITH NEW
| TO MATCH EXISTING
\ |
I
I
I
EXISTING BEARER
1
1
:
I EXTERNAL 5 NEW TOP HUNG WINDOW TO MATCH EXISTING
'} access fy ENGINEER TO SPECIFY NEW LINTEL
x 1
oO
|
oO]
£
oo APPROVED PLAN
wr 02 51989.294.02
70 1,930 70 4.02. “et
MOVE DOWNPIPE — NEW WINDOW a5 NOOSA COUNCIL
14 SEPTEMBER 2022
DOOR ON SELF CLOSING MECHANISM NEW POWDER ROOM — NEW EXTERNAL BLIND - VENTAL OR SIMILAR (OPERABLE/RETRACTABLE)
Rev | Date Description BLA C K _ _ Gontactinformation: Project: Drawing Title: Project No. Drawn By Drawing No.
A 19/02/2021 | PRELIMINARY LAYOUTS FOR REVIEW. PO Box 781 Tewantin Q 4565
eee ag hoe eee eer ep THE RETREAT PROPOSED LEVEL 1 202136 PT SK_4.5
C__ [01/03/2022] PRELIMINARY FOR REVIEW thereof are the property of W O O Di _sPh:0416037 424
D__| 22/06/2022| FOR PLANNING APPROVAL Blackwood ang musta! be used [email protected] 390 David Low Way, Peregian Beach QLD Scale Date Project Stage Revision
turtton authority of slackood architecture & design _wwwolackwoodarchitecturecomau 4573 1:50 @ A3 22/06/2022 Concept Design  D

 

 

 

Page 5

        -
 APPROVED PLAN
    51989.294.02
  NOOSA COUNCIL
14 SEPTEMBER 2022


[OCR of page images]
 

THE RETREAT - PROPOSED NORTH ELEVATION APPROVED PLAN

51989.294.02
NOOSA COUNCIL
= NEW CONSTRUCTION 14 SEPTEMBER 2022
WORKS

 

 

 

 

 

 

 

NEW ALUMINIUM FRAME TO
SUPPORT BLINDS

  
 
 
  
  
  
 
 
  
 
 
 
 
 
 
  
    
 
 
     

NEW EXTERNAL BLIND -
VENTAL OR SIMILAR
(OPERABLE/RETRACTABLE)

GUTTER

———— TIMBER BATTEN SCREEN

ENTRY TO POWDER ROOM

EXISTING BALUSTRADE

EXPOSED BEARER
WATERPROOF CEILING

TREATMENT TO U/S DECK. REVIEW
WITH BUILDER - RESEARCH
REQUIRED

ROOF OVER ENTRY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EXISTING BALUSTRADE

EXPOSED BEARER
INDICATIVE GROUND LINE

NEW TIMBER FRAMED WALLS -

CLADDING TO MATCH EXISTING PROPOSED STORAGE

 

 

 

 

 

 

 

 

 

Rev | Date Description BLA C K _ _ Gontactinformation: Project: Drawing Title: Project No. Drawn By Drawing No.

A __ [19/02/2021 | PRELIMINARY LAYOUTS FOR REVIEW PO Box 781 Tewantin Q 4565

B 1 13/07/2021| PRELIMINARY FOR REVIEW snr : Architect Reg eration #5386 OLD THE RETREAT PROPOSED NORTH 202136 PT SK_5.5

C__ [01/03/2022] PRELIMINARY FOR REVIEW thereof are the property of W O O Ds Ph:0416 037.424 ELEVATION

D | 22/06/2022| FOR PLANNING APPROVAL Stechod ane ms be are [email protected] 390 David Low Way, Peregian Beach QLD Scale Date Project Stage Revision
writen authority ofSlackwood. architecture & design wwwoblackwoodarchitecture.comau 4573 1:50 @ A3 22/06/2022 Concept Design  D

 

Page 6

        -
 APPROVED PLAN
    51989.294.02
  NOOSA COUNCIL
14 SEPTEMBER 2022


[OCR of page images]
THE RETREAT - PROPOSED EAST ELEVATION (PRICE OPTION FOR A NEW DOOR

= NEW CONSTRUCTION
WORKS | | . . APPROVED PLAN
o || x x lo 51989.294.02
NOOSA COUNCIL
14 SEPTEMBER 2022

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NEW OXXO SLIDING DOOR

 

  
 
 
 
 
 
  
  
 
 
 
  
  
  
  
 
 
  
 

GUTTER
NEW WINDOW

DP.
NEW POWDER ROOM DP
NEW EXTERNAL BLIND - VENTAL OR

"SIMILAR (OPERABLE/RETRACTABLE)
— NEW WINDOW

EXISTING BALUSTRADE

NEW EXTERNAL BLIND - VENTAL OR
SIMILAR (OPERABLE/RETRACTABLE)
NEW WINDOW

NEW ALUMINIUM FRAME TO SUPPORT EXPOSED BEARER
BENE NEW ALUMINIUM FRAME TO SUPPORT

~~ BLINDS

 

 

 

EXISTING AWNING OVER WINDOW
EXISTING BALUSTRADE

 

 

 

 

 

 

 

 

 

 

 

EXPOSED BEARER

PROPOSED
STORAGE

{

 
   

PROPOSED LOUVRE WINDOW.

PROPOSED DOUBLE HUNG WINDOW

  
  

PROPOSED TIMBER FRAMED WALLS

- CLADDING TO MATCH EXISTING INDICATIVE GROUND LINE

 

 

 

 

 

 

 

 

 

Rev | Date Description BLA C K _ _ Gontactinformation: Project: Drawing Title: Project No. Drawn By Drawing No.

A 19/02/2021 | PRELIMINARY LAYOUTS FOR REVIEW PO Box 781 Tewantin O 4565

3 113/07/2027] PRELIMINARY FOR REVIEW ‘ : . Architect Registration # 5386 QLD THE RETREAT PROPOSED EAST 202136 PT SK_5.6

C__[01/03/2022| PRELIMINARY FOR REVIEW arco te ose W O O D _ Ph:0416037 424 ELEVATION

D__| 22/06/2022| FOR PLANNING APPROVAL vss or copied. thou the [email protected] 390 David Low Way, Peregian Beach QLD Scale Date Project Stage Revision
writen authority ofSlackwood. architecture & design wwwoblackwoodarchitecture.comau 4573 1:50, 1:76.58 @ A3 22/06/2022 Concept Design  D

 

Page 7

        -
 APPROVED PLAN
    51989.294.02
  NOOSA COUNCIL
14 SEPTEMBER 2022


[OCR of page images]
 

THE RETREAT - PROPOSED SOUTH ELEVATION 1989.24.02»

NOOSA COUNCIL
14 SEPTEMBER 2022

 

 

= NEW CONSTRUCTION

 

 

 

 

WORKS

 

 
 
  
 
 
  
 
 
 
 
  
  
  
     
  
  
  

NEW EXTERNAL BLIND - VENTAL OR
SIMILAR (OPERABLE/RETRACTABLE)

 

GUTTER

 

 

 

 

POWDER ROOM CLADDING
TO MATCH EXISTING LEVEL 1
CLADDING

 

 

 

 

 

 

 

EXISTING BALUSTRADE

NEW ALUMINIUM FRAME TO.

SUPPORT BLINDS
EXPOSED BEARER

 

EXISTING AWNING
OVER WINDOWS

 

WATERPROOF CEILING TREATMENT
TO U/S DECK. REVIEW WITH BUILDER -
RESEARCH REQUIRED

 

EXISTING DECK

 

 

 

 

 

 

 

 

 

 

WATERPROOF CEILING TREATMENT
TO U/S DECK

UNM
_ PROPOSED
STORAGE

 
    
 
   
 
 
 
 
   
 

EXPOSED BEARER

NEW TIMBER FRAMMED WALLS -
CLADDING TO MATCH EXISTING

SOLID CORE DOOR -
CLADDING TO MATCH EXISTING

INDICATIVE GROUND LINE

 

 

 

 

 

 

 

 

 

Rev | Date Description BLA C K _ _ Gontactinformation: Project: Drawing Title: Project No. Drawn By Drawing No.

A__ [19/02/2021] PRELIMINARY LAYOUTS FOR REVIEW PO Box 781 Tewantin Q 4565

517370772007 PRELIMINARY FOR REVIEW sows RO Box 781 Tewanrin 04865 THE RETREAT PROPOSED SOUTH 202136 PT SK_5.7

C__[01/03/2022| PRELIMINARY FOR REVIEW arco te ose W O O D _ Ph:0416037 424 ELEVATION

D | 22/06/2022| FOR PLANNING APPROVAL Stechod ane ms be are [email protected] 390 David Low Way, Peregian Beach QLD Scale Date Project Stage Revision
writen authority ofSlackwood. architecture & design wwwoblackwoodarchitecture.comau 4573 1:50 @ A3 22/06/2022 Concept Design  D

 

Page 8

        -
 APPROVED PLAN
    51989.294.02
  NOOSA COUNCIL
14 SEPTEMBER 2022


[OCR of page images]
 

THE RETREAT - PROPOSED WEST ELEVATION

 

 

APPROVED PLAN
51989.294.02
NOOSA COUNCIL
14 SEPTEMBER 2022

 

= NEW CONSTRUCTION
WORKS

 

 

 

GUTTER

     
    

NEW EXTERNAL BLIND - VENTAL OR SIMILAR

(OPERABLE/RETRACTABLE) NEW POWDER ROOM - WC & BASIN

TIMBER BATTEN SCREEN
NEW ALUMINIUM FRAME TO SUPPORT BLINDS
ENTRY ROOF

EXISTING AWNING OVER WINDOWS EXISTING AWNING OVER WINDOWS

INDICATIVE GROUND LINE

 

 

 

 

 

 

 

 

 

Rev | Date Description B L A Cc K Contact information: Project: Drawing Title: Project No. Drawn By

A _[19/02/2021| PRELIMINARY LAYOUTS FOR REVIEW PO Box 781 Tewantin Q 4565

B__ | 13/07/2021] PRELIMINARY FOR REVIEW a , a Architect Registration # 5386 QLD THE RETREAT PROPOSED WEST 202136 PT

C__ [01/03/2022] PRELIMINARY FOR REVIEW thereof are the property of W O O Ds Ph:0416 037.424 ELEVATION

D__| 22/06/2022| FOR PLANNING APPROVAL eee oes neue wed. [email protected] 390 David Low Way, Peregian Beach QLD Scale Date Project Stage
writen authority ofSlackwood. architecture & design wwwoblackwoodarchitecture.comau 4573 1:50 @ A3 22/06/2022 Concept Design

Drawing No.

SK_5.8

Revision
D

 

 

Page 9

                                                                                                   04                    B
                                                                                                  3.01                 DA3.06

                                       A                                                      B                                 C
                                                                                                                                                                                           -

                                                                  4,050                                                4,050                                                     APPROVED PLAN
                                                                                                                                                                                   51989.294.03
                                                                                                                                                                                 NOOSA COUNCIL
                                                                                                                                                                                   15 MAY 2026




                1                                                                                                                                                                              1
                    4,050




                                                                                                                                                                         REMOVE POSTS AND
                                                                                                                                                                         PROVIDE TEMPORARY
                                                                                                                                                       P                 SUPPORT DURING
      A                                                                                                                                                                  CONSTRUCTION
                                                                                                                                                                                                   A




                2                                                                                                                                                                              2

      03
    DA3.04
                                                                                                                                                                         EXISTING BEARER


                                                                                                                                                       P

                                                                                                                                                                                                     01
                    4,050




                                                                                                                                                                                                   DA3.02




                3                                                                                                                                                                              3
                                           DP




                                                                                                                                                                                  LEGEND

                                                                                                                         B                                                        = EXISTING
                                                                                                                       DA3.06
                                             C
                                           DA3.13
                                                                                                                                                                                  = TO BE DEMOLISHED
                                                                                                    02
                                       A                                                      B   DA3.03                        C

                                           Unit 3, The Retreat                                             Demo Basement Plan

                                                                                                                                                                                                   DA1.08
                                           For Karyn Brinkley                                              Scale                    Project No.   Date        Revision
                                           Unit 3, 390 David Low Way, Peregian Beach Q 4573                1:50 @ A3                202618        2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 10

                                                                                                                                             04                   B
                                                                                                                                            3.01                DA3.06
                                                                                                                                                                                                                                           -
                                                                   A                                                                 B                                       C                                                    APPROVED PLAN
                                                                                                                                                                                                                                    51989.294.03
                                                                                                    4,050                                                       4,050                                                             NOOSA COUNCIL
                                REMOVE ALL FITINGS +
                                PLUMBING FIXTURES,                                                                                                                                                                                  15 MAY 2026
                                FLOOR AND WALL TILES,
                                REMOVE DIVIDING WALL                                                    REMOVE TILES.
                                BETWEEN TOILET + BATH.
                                PREPARE SUBSTRATE
                                FOR NEW WATERPROOF
                                MEMBRANE + TILES.         ENTRY
                1                                                                                                                                                                                                                          1




                                                           UP
                                                                                              BATH/ SHR                         WC


                                                                                       BATHROOM
                                                                                        F:   Tiles
                                                          TIMBER
                                                                                        A: 8.3 m2
                                                           DECK
                    4,050




                                                         LANDING

                                                                                                                                                                                                              DECKING BOARDS, JOISTS AND
                                                                                                                                                                                                              BEARERS TO BE CHECK AND
                                                                                           HALLWAY                                                         BEDROOM 2                                          REPLACED IF REQUIRED
                                                                                            F: TILE                                                         F:    TILE
      A                                                                                                                                                                                                                                        A
                                                                                            A: 6.7 m2                                                       A: 16.4 m2


                                                                              LAUNDRY                                                                                             TIMBER DECK
                                                                       DUCT




                                                                                                        TUB
                                                                               F: Tiles                         LINEN
                                                                                                                                                                                   F: TIMBER
                                                                               A: 2.5 m2                                                                        AC
                2                                                                                                                                                                  A: 13.7 m2                                              2
                                                                                                                                                                AC

      03
    DA3.04



                                                                                                                            SHW                            BEDROOM 1
                                                                                           BEDROOM 3                                                        F:    TILE
                                                                                            F:    TILE                                                      A: 16.1 m2                                                                           01
                    4,050




                                                                                            A: 12.0 m2                                                                                                                                         DA3.02
                                                                                                                                         ENSUITE
                                                                                                                                          F: TILE
                                                                                                                                          A: 3.3 m2




                                                                                                                                WC


                3                                                                                                                                                                                                                          3


                                                                                                                 REMOVE ALL
                                                                                                                    FINISHED
                                                                                                               FIXTURES AND
                                                                                                                  FITTINGS IN
                                                                                                                ENSUITE AND                                                                                                   LEGEND
                                                                                                               REPLACE WITH
                                                                                                                         NEW                                      B                                                           = EXISTING
                                                                                                                                                                DA3.06
                                                                         C
                                                                       DA3.13
                                                                                                                                                                                                                              = TO BE DEMOLISHED
                                                                                                                                             02
                                                                   A                                                                 B     DA3.03                            C

                                                                         Unit 3, The Retreat                                                        Demo Ground Floor Plan

                                                                                                                                                                                                                                               DA1.09
                                                                         For Karyn Brinkley                                                         Scale                        Project No.    Date        Revision
                                                                         Unit 3, 390 David Low Way, Peregian Beach Q 4573                           1:50 @ A3                    202618         2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 11

                                                                                                                           04                   B
                                                                                                                          3.01                DA3.06                                                                -

                                                             A                                                      B                                  C                                                  APPROVED PLAN
                                                                                                                                                                                                            51989.294.03
                                                                                        4,050                                                 4,050                                                       NOOSA COUNCIL
                                                                                                                                                                                                            15 MAY 2026




                1                                                                                                                                                                                               1

                                                                   DW




                                                                                               STONE
                                                                                               BENCH
                                                                                                                        DINING
                                                                    S                                                    F: TIMBER
                    4,050




                                                     30° PITCH                                                           A: 16.4 m2
                                                                                                                                                                                                DECKING BOARDS, JOISTS AND
                                                                                                                                                                                                BEARERS TO BE CHECK AND
                                                                                                                                                                                                REPLACED IF REQUIRED
                                                                   CT
      A                                                                          KITCHEN                                                                                                                                A
                                                                                  F: TIMBER
                                                                                  A: 17.0 m2
                                                                                                                                                           TIMBER DECKING
                                                                                                                             POST                           F:    TIMBER
                                                                           PTY       OVEN        RF
                2                                                                                                                                           A:     17.0 m2                                      2

      03
    DA3.04




                                                                          ENTRY                                          LIVING
                                                                           F: TIMBER                                      F: TIMBER                                                                                       01
                                                                           A: 15.8 m2
                    4,050




                                                                                                                          A: 16.4 m2                                                                                    DA3.02
                                                                  ENTRY




                3                                                                                                                                                                                               3
                             REMOVE TIMBER BATTENS




                                                                                                                                                                                                   LEGEND

                                                                                                                                                B                                                  = EXISTING
                                                                                                                                              DA3.06
                                                                   C
                                                                 DA3.13
                                                                                                                                                                                                   = TO BE DEMOLISHED
                                                                                                                           02
                                                             A                                                      B    DA3.03                        C

                                                                 Unit 3, The Retreat                                              Demo Level 01 Plan

                                                                                                                                                                                                                    DA1.10
                                                                 For Karyn Brinkley                                               Scale                    Project No.   Date        Revision
                                                                 Unit 3, 390 David Low Way, Peregian Beach Q 4573                 1:50 @ A3                202618        2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 12

                                                                                                   04                    B
                                                                                                                                                                                                                    -
                                                                                                  3.01                 DA3.12
                                                                                                                                                                                                          APPROVED PLAN
                                       A                                                      B                                     C                                                                       51989.294.03
                                                                                                                                                                                                          NOOSA COUNCIL
                                                                  4,050                                                4,050                                                                                15 MAY 2026




                                                                                                                                                                                                    LINE OF FLOOR OVER


                1                                                                                                                                                                                               1
                                                                                                                                                                                                    EXISTING BLOCK WALL

                                                                                                                                                                                                    SOLAR BATTERY BY OTHERS




                                                                                                                                        FALL                                                        BROOM FINISH CONCRETE SLAB
                                                                                                                                        SLAB 1:100
                                                                                                                                                             ND.03
                    4,050




                                                                                                                                                                                                    NEW POST CONCEALED
                                                                                                                                                                                                    75x12mm COVER BATTENS WITH 25mm
                                                                                                                                                                                                    GAP TO MATCH EXISTING
      A                                                                                                                                                                                                                 A




                                                                                                                                                                                 NW.04
                                                                                                                                                                                                    EXTERNAL CLADDING 6mm FC PAINTED
                                                                                                                                             SHED                                                   (COLOUR TO MATCH EXISTING LOWER
                                                                                                                                              F: CONC TROWEL                                        LEVEL WALLS)
                                                                                                                                              A:        13.1 m2
                2                                                                                                                                                                                               2
                                                                                                                                                                                                    90x45mm STUD FRAME
      03
    DA3.04




                                                                                                                                                                                 NW.05
                                                                                                                                             CONCRETE SLAB TO ENGINEERS                             INSIDE FACE OF WALL CLAD LINED
                                                                                                                                                  SPECIFICATIONS                                    WITH 10MM PAINTED AND SQUARE SET
                                                                                                                                                                                                    PLASTERBOARD WALLS TO BE
                                                                                                                                                                                                    THERMALLY INSULATED

                                                                                                                                                                                                                          01
                    4,050




                                                                                                                                                                                                                        DA3.02


                                                                                                                                                                                                    NEW POST CONCEALED




                3                                                                                                                                                                                               3




                                             C
                                           DA3.13
                                                                                                                         B
                                                                                                    02
                                       A                                                      B   DA3.03
                                                                                                                       DA3.12       C

                                           Unit 3, The Retreat                                             Proposed Basement Plan

                                                                                                                                                                                                                    DA2.01
                                           For Karyn Brinkley                                              Scale                                     Project No.     Date                Revision
                                           Unit 3, 390 David Low Way, Peregian Beach Q 4573                1:50 @ A3                                 202618          2/03/2026           A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 13

                                                                                                                          04                    B
                                                                                                                         3.01                 DA3.12                                                            -
                                                                                                                                                                                                         APPROVED PLAN
                                                 A                                                                B                                            C
                                                                                                                                                                                                           51989.294.03
                                                                                  4,050                                                       4,050                                                      NOOSA COUNCIL
                                                                                                                                                                                                           15 MAY 2026
                                                                                                                  BATH SPOUT (FREE
                                                                                            GRATED DRAIN          STANDING)

                                                                                            WALL MIXER
                                                                                                                      TOWEL RAILS
                                        ENTRY
                1                                                                                                                                                                                           1




                                         UP
                                                             WC
                                                                                               FALL
                                                                     NEW                                   BATH
                                                            VB       BATHROOM
                                                                      F:   Tiles            SHW
                                        TIMBER
                                                                      A: 8.3 m2
                                         DECK
                    4,050




                                       LANDING

                                                                                       NEW DOOR (HINGED)
                                                                         HALLWAY                                                         BEDROOM 2
                                                                                            NICHE IN WALL                                 F:    TILE
                                                                          F: TILE
      A                                                                                     FOR SHAMPOO                                                                                                         A
                                                                          A: 6.7 m2
                                                                                            ETC
                                                                                                                                          A: 16.4 m2


                                                            LAUNDRY                                                                                                 TIMBER DECK
                                                     DUCT




                                                                                      TUB
                                                             F: Tiles                         LINEN
                                                                                                                                                                     F: TIMBER
                                                             A: 2.5 m2                                                                        AC
                2                                                                                                                                                    A: 13.7 m2                             2
                                                                                                                                              AC

      03
    DA3.04



                                                                                                            SHW                          BEDROOM 1
                                                                         BEDROOM 3                                                        F:    TILE
                                                                          F:    TILE                                                      A: 16.1 m2                                                              01
                    4,050




                                                                          A: 12.0 m2                                  NEW                                                                                       DA3.02
                                                                                                                      ENSUITE
                                                                                                                       F: TILE
                                                                                                                       A: 3.3 m2
                                                                                                      VB



                                                                                                            WC


                3                                                                                                                                                                                           3




                                                       C
                                                     DA3.13
                                                                                                                                                B
                                                                                                                           02
                                                 A                                                                B      DA3.03
                                                                                                                                              DA3.12           C

                                                       Unit 3, The Retreat                                                        Proposed Ground Floor Plan

                                                                                                                                                                                                                DA2.02
                                                       For Karyn Brinkley                                                         Scale                            Project No.    Date        Revision
                                                       Unit 3, 390 David Low Way, Peregian Beach Q 4573                           1:50 @ A3                        202618         2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 14

                                                                                                                                       04                   B
                                                                                                                                      3.01                DA3.12
                                                                                                                                                                                                                      -
                                                                         A                                                      B                                     C                                        APPROVED PLAN
                                                                                                                                                                                                                 51989.294.03
                                                                                                     4,050                                                4,050                                                NOOSA COUNCIL
                                                                                                                                                                                                                 15 MAY 2026




                1                                                                                                                                                                                                 1

                                                                               DW
                                                                               DW



                                                                                                            STONE
                                                                                 S                          BENCH
                                                                                                                                    DINING
                                                                                                                                     F: TIMBER
                    4,050




                                                               30° PITCH                                                             A: 16.4 m2


                                                                               CT
      A                                                                                       KITCHEN                                                                                                                     A
                                                                                               F: TIMBER
                            TWIN WALL                                                          A: 17.0 m2
                            POLYCARBONATE                                     PTY                                                                                         TIMBER DECKING
                            (CLEAR)                                                                                                                                        F:    TIMBER
                                                                                        PTY       OVEN       RF
                2                                                                                                                                                          A:     17.0 m2                         2

      03
    DA3.04




                            NEW ENCLOSURE
                                                                                       ENTRY                                         LIVING
                            REVIEW, ALLOW LIGHT,
                            POLYCARB OPTIONS                                            F: TIMBER                                     F: TIMBER                                                                             01
                                                                                        A: 15.8 m2
                    4,050




                                                                                                                                      A: 16.4 m2                                                                          DA3.02




                            NEW 2.1 x 0.9 DOUBLE
                            HUNG WINDOW
                                                                              ENTRY




                             720mm LEAF SOLID CORE              EXTERNAL
                             DOOR ON SELF CLOSING                ACCESS
                                        MECHANISM
                3                                                                                                                                                                                                 3
                                          NEW WINDOW             ND.02
                                                                                                 POWDER ROOM
                                                       NW.03




                                                                                      WC          F:   TILED
                                                                             VB                   A:   2.1 m2
                                           DOOR STOP
                                                                                              DP HAND BASIN TO BE
                                                                                                 INSULATED WITH
                                       MOVE DOWNPIPE                                             OVERFLOW

                                NEW POWDER ROOM
                                                                               C
                                                                             DA3.13
                                                                                                                                                            B
                                                                                                                                       02
                                                                         A                                                      B    DA3.03
                                                                                                                                                          DA3.12      C

                                                                             Unit 3, The Retreat                                              Proposed Level 1 Plan

                                                                                                                                                                                                                      DA2.03
                                                                             For Karyn Brinkley                                               Scale                       Project No.   Date        Revision
                                                                             Unit 3, 390 David Low Way, Peregian Beach Q 4573                 1:50 @ A3                   202618        2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 15

                                                                                                          04                    B
                                                                                                         3.01                 DA3.12                                                   -
                                              A                                                      B                                 C                                        APPROVED PLAN
                                                                                                                                                                                  51989.294.03
                                                                                                                                                                                NOOSA COUNCIL
                                                                                                                                                                                  15 MAY 2026




                1                                                                                                                                                                  1




      A                                                                                                                                                                                    A




                2                                                                                                                                                                  2

      03
    DA3.04




                                                                                                                                                                                             01
                                                                                                                                                                                           DA3.02




                3                                                                                                                                                                  3



                                       NEW WALLS BELOW DASHED




                                          RELOCATE DP

                                                    C
                                                  DA3.13
                                                                                                                                B
                                                                                                           02
                                              A                                                      B   DA3.03
                                                                                                                              DA3.12   C

                                                  Unit 3, The Retreat                                             Proposed Roof Plan

                                                                                                                                                                                       DA2.04
                                                  For Karyn Brinkley                                              Scale                    Project No.   Date        Revision
                                                  Unit 3, 390 David Low Way, Peregian Beach Q 4573                1:50 @ A3                202618        2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 16

                                                                                                                                                                       -
                                                                                                                                                                APPROVED PLAN
                                                                                                                                                                  51989.294.03
                                                                                                                                                                NOOSA COUNCIL
                                                                                                                                                                  15 MAY 2026




                                                                                                                                                           ENTRY TO POWDER
                                                                                                                                                           ROOM BEYOND




       BONDOR ROOF OR SIMILAR TO
      PROTECT WATER EGRESS INTO
          STOREROOM UNDER DECK

                                                                                                                                                          INDICATIVE GROUND LINE




                                         PROPOSED STORAGE
        NEW TIMBER FRAMED WALLS -
       CLADDING TO MATCH EXISTING




                                       Unit 3, The Retreat                                North Elevation Proposed

                                                                                                                                                                      DA3.07
                                       For Karyn Brinkley                                 Scale                      Project No.   Date        Revision
                                       Unit 3, 390 David Low Way, Peregian Beach Q 4573   1:50 @ A3                  202618        2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 17

                                                                                                                                                                                                       -
                                                                                                                                                                                                 APPROVED PLAN
                                                                                                                                                                                                   51989.294.03
                                                                                                                                                                                                 NOOSA COUNCIL
                                                                                                                                                                                                   15 MAY 2026




                                       NEW DOWNPIPE   C1
                                       TO FOLLOW
                                       ANGLED STRUT



                                       89CHS STRUT




                                                                                                                 PROPOSED
                                                                                                                  STORAGE

                                                                                                                                                                PROPOSED TIMBER FRAMED WALLS -
                                                                                                                                                                CLADDING TO MATCH EXISTING
                                                                                                         NW.05              NW.04                               BATTENS




                                                      Unit 3, The Retreat                                             East Elevation Proposed

                                                                                                                                                                                                      DA3.08
                                                      For Karyn Brinkley                                              Scale                     Project No.   Date         Revision
                                                      Unit 3, 390 David Low Way, Peregian Beach Q 4573                1:50 @ A3                 202618        2/03/2026    A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 18

                                                                                                                                                                                                      -
                                                                                                                                                                                           APPROVED PLAN
                                                                                                                                                                                             51989.294.03
                                                                                                                                                                                           NOOSA COUNCIL
                                                                                                                                                                                             15 MAY 2026




                  POWDER ROOM CLADDING TO
              MATCH EXISTING LEVEL 1 CLADDING



                                                C1
                                 NEW DOWNPIPE




                                                                                                                                                                             NEW BONDOR ROOF PANEL UNDER DECK FOR
              STRUT CONNECTED TO BLOCKWORK                                                                                                                                   WATERPROOFING BELOW


                                                                                                                                                                             NEW TIMBER FRAMMED WALLS -
                                                                                                                                                                             CLADDING TO MATCH EXISTING




                                                                                                                                   PROPOSED
                                                                                                                                    STORAGE



                                                                                                                                                                             INDICATIVE GROUND LINE




                                                     Unit 3, The Retreat                                South Elevation Proposed

                                                                                                                                                                                                      DA3.09
                                                     For Karyn Brinkley                                 Scale                           Project No.   Date        Revision
                                                     Unit 3, 390 David Low Way, Peregian Beach Q 4573   1:50 @ A3                       202618        2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 19

                                                                                                                                                                                -
                                                                                                                                                                          APPROVED PLAN
                                                                                                                                                                            51989.294.03
                                                                                                                                                                          NOOSA COUNCIL
                                                                                                                                                                            15 MAY 2026




                                                                                                                             NEW POLYCARBONATE
                                                                                                                             RAIN SCREEN BEHIND
                                                                                                                             TIMBER SCREEN


                                                                                                                             NEW DOUBLE HUNG
                                                                                                                             WINDOW BEHIND
                                                                                                                             SCREEN

                                                                                                                    900mm




                                                                                                                                                  NEW WINDOW
                                                                                                                            NW.03



                                                                                                                              C1




                                                                                                                                                  STRUT




                                                     ENTRY




                                       Unit 3, The Retreat                                West Elevation Proposed

                                                                                                                                                                                 DA3.10
                                       For Karyn Brinkley                                 Scale                                     Project No.   Date         Revision
                                       Unit 3, 390 David Low Way, Peregian Beach Q 4573   1:50 @ A3                                 202618        2/03/2026    A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 20

                                                                                                                                                                                                -
                                                                                                                                                                                          APPROVED PLAN
                                                                                                                                                                                            51989.294.03
                                                                                                        C                          B                                                      NOOSA COUNCIL
                                                                                                                                                                                            15 MAY 2026




                                                                                                                                                                           A




                                                                                                            EXISTING LIVING            KITCHEN




                                                                                                                                       LAUNDRY
                                                                                                            EXISTING BED 2


                                NEW BONDOR ROOF
                               PANELS UNDER DECK
EL

                                        NEW BEARER


                             POST LOCATED IN WALL


                                                                      STORE ROOM
                                                           2200




                               NEW RETATING WALL
                                    TO ENGINEERS
                                         DETAILS


                                          NEW SLAB


EVEL 1




                                                     Unit 3, The Retreat                                      Section A Proposed

                                                                                                                                                                                                    DA3.11
                                                     For Karyn Brinkley                                       Scale                              Project No.   Date            Revision
                                                     Unit 3, 390 David Low Way, Peregian Beach Q 4573         1:50 @ A3                          202618        2/03/2026       A

 Document Set ID: 24636511
 Version: 1, Version Date: 26/03/2026

Page 21

                                                                                                                                                                                      -
                                                                                                                                                                                APPROVED PLAN
                                                                                                                                                                                  51989.294.03
                                                                                                                                                                                NOOSA COUNCIL
                                                                                                                                                                                  15 MAY 2026
                                           1                                              2                                 3




                                                                                                                                                                                   2 ROOF
                                                                                                                                                                                    +15.20




                                                                                                                                              2,396
                                                      DINING                                                       LIVING



                                                                                                                                                                                 1 LEVEL 1
                                                                                                                                                                                    +12.60




                                                                                                                                              200
                                                               BATHROOM 2                                 BEDROOM 1




                                                                                                                                              2,400
                                                                                                                                                                          0 GROUND LEVEL
                                                                                                                                                                                   +10.00




                                                                                                                                              170
                                                                                                                                              INDICATIVE GROUND LINE




                                                                                                                                                                       -1 BASEMENT LEVEL 1
                                                                                                                                                                                     +7.00



                                       Unit 3, The Retreat                                    Section B Proposed

                                                                                                                                                                                     DA3.12
                                       For Karyn Brinkley                                     Scale                             Project No.   Date        Revision
                                       Unit 3, 390 David Low Way, Peregian Beach Q 4573       1:50 @ A3                         202618        2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 22

                                                                                                                                                                                                         -
                                                                                                                                                                                                   APPROVED PLAN
                                                                                                                                                                                                     51989.294.03
                                                                                                                                                                                                   NOOSA COUNCIL
                                                                                                                                                                                                     15 MAY 2026

                                                                          3                                                                               3




                                       EXISTING ROOF SHEET                                                                EXISTING ROOF SHEET

                                                    GUTTER        FL                                                                   GUTTER
                                                             GU
                                                  FLASHING                                                                           FLASHING

                                                                  ROOF BEAM                                                            NEW DP
                                                                                                                                                  NW.03
                                                                                                                                    STUD WALL
                                                                                                                                      VB + TILE


                                                                                                                                 NEW PRD ROOM
                                                                                                                                      POP-OUT



                                                                                                                                           FB1
                                                                                          joist

                                                                                                                                             J1



                                                                                                                                            BS




                                                                                  joist




                                       C    Section C Existing                                                              C       Section C Proposed
                                       -    Scale 1:50                                                                       -      Scale 1:50




                                                                       Unit 3, The Retreat                                            Section C

                                                                                                                                                                                                         DA3.13
                                                                       For Karyn Brinkley                                             Scale                   Project No.   Date        Revision
                                                                       Unit 3, 390 David Low Way, Peregian Beach Q 4573               1:50 @ A3               202618        2/03/2026   A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Page 23

                                                                                                                                                                                                            -
                                                                                                                                                                                                      APPROVED PLAN
                                                                                                                                                                                                        51989.294.03
                                                                                                                                                                                                      NOOSA COUNCIL
                                                                                                                                                                                                        15 MAY 2026




                                                            DP



                                                           Wall Tile                                                                                                   500
                                                           600 x 1200 white


                                                         Toilet Suite
                                                         P.04

                                                                                                                               Wall Tile
                                                         Toilet Roll Holder
                                                                                                                       600 x 1200 white
                                                         P.05
                                               900
                                                                                                                                    Tapware
                                                                                                                                       P.06
                                  1,975




                                                                                                                                                 1,230
                                          01




                                                           Hand Basin                                                            Hand Basin
                                                           P.03                                                                        P.03
                              ND.02




                                                         Floor Tile




                                                                                                                                                                                     900
                                                         600 x 1200 white                                                         Toilet Suite
                                                                                                                                         P.04
                                                         Wall Tile
                                                         600 x 1200 white
                                                                                                                                   Floor Tile
                                                                                                                            600 x 1200 white
                                               NW.03




                                      Powder Room Plan                                                                01 Powder Room Elevation
                                                                                                                                Scale 1:20
                                      Scale 1:20




                                                                 Unit 3, The Retreat                                Powder Room Joinery Plan

                                                                                                                                                                                                          DA6.01
                                                                 For Karyn Brinkley                                 Scale                                Project No.     Date              Revision
                                                                 Unit 3, 390 David Low Way, Peregian Beach Q 4573   1:20 @ A3                            202618          2/03/2026         A

Document Set ID: 24636511
Version: 1, Version Date: 26/03/2026

Used in these records

About this file

File size
12.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Compiled Approved Plans 51989.294.03.pdf · 12.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.