RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
RACV Noosa Resort
– Proposed Eco
Resort Extension
94-142 Noosa Drive,
Noosa Heads QLD 4567
Site Based Stormwater
Management Plan
Aspect Architects
July, 2022
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 80 pages
Page 2
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Document Verification
Job Title RACV Noosa Resort – Proposed Eco Resort Extension
Job Number 22366
Document Title Site Based Stormwater Management Plan
Document Control
Revision
Date Document Author Reviewer
No.
04.06.2019 Site Based Stormwater Management Plan 00 B Plunkett M Van Itallie
11.09.2019 Site Based Stormwater Management Plan 01 J Hewitt M Van Itallie
15.06.2022 Site Based Stormwater Management Plan 02 T Mathew M Van Itallie
04.07.2022 Site Based Stormwater Management Plan 03 T Mathew M Van Itallie
Approval for Issue
Name Signature Date
Theres Mathew 04.07.2022
Michael Van Itallie (RPEQ 13469) 04.07.2022
© Document copyright of ADG Engineers (Aust) Pty Ltd
This document is and shall remain in the property of ADG. The document may only be used for the purpose
for which it was commissioned and in accordance with the Terms of Engagement for the commission.
Unauthorised use of this document in any form whatsoever is prohibited.
To the extent permitted by law, ADG expressly disclaims and excludes liability for any loss, damage, cost or
expenses suffered by any third party relating to or resulting from the use of, or reliance on, any information
contained in this report. ADG does not admit that any action, liability or claim exist or be available to any third
party.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 2
Page 3
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Contents
EXECUTIVE SUMMARY 5
1 INTRODUCTION 6
1.1 Background 6
1.2 Background Information 6
1.3 Property Detail 6
2 EXISTING SITE 7
2.1 Existing Site Features 7
3 FLOODING 8
3.1 Flooding Considerations 8
4 STORMWATER INFRASTRUCTURE 9
4.1 Existing Infrastructure 9
4.2 Lawful Point of Discharge (LPD) 10
4.2.1 Existing LPD 10
4.2.2 Proposed LPD 10
4.3 External Catchment 10
5 STORMWATER QUANTITY ASSESSMENT 10
5.1 Proposed Development and Associated Issues 10
6 STORMWATER QUALITY ASSESSMENT 11
6.1 Treatment Objectives 11
6.2 Site Analysis and Design Strategy 12
6.2.1 Pre-Development Phase 12
6.2.2 Bulk Earthworks Phase 12
6.2.3 Construction Phase 13
6.2.4 Maintenance 13
6.3 Operational Phase Treatment 13
6.4 Stormwater Quality Improvement Devices (SQIDs) 13
6.4.1 First Flush Device 14
6.4.2 Bioretention Basin 14
6.5 Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank 14
6.5.1 Internal Demand 14
6.6 MUSIC Model 15
6.7 On-site Treatment Lifecycle Costs 15
6.8 Water Quality Monitoring 16
6.9 Maintenance 16
7 CONCLUSION 17
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 3
Page 4
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Figures
Figure 1 - Site Location (as accessed from Noosa Interactive Maps 20.04.22) 7
Figure 2 - Site Layout (as accessed from Nearmaps 20.04.2022) 8
Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017) 9
Figure 4 - Treatment train 15
Figure 5 - Results for the treatment train 15
Tables
Table 1 - Property Detail 6
Table 2 - South East Queensland (SEQ) Targets 11
Appendices
Appendix A Site Survey
Appendix B Architectural Drawings
Appendix C ADG Preliminary Plans
Appendix D Landscape Concept
Appendix E NSC Code Responses
Appendix F NSC Erosion Hazard Assessment
Appendix G Noosa Shire Council (Interactive Mapping)
Appendix H MUSIC Modelling Information
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 4
Page 5
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
EXECUTIVE SUMMARY
ADG Engineers (Aust.) Pty Ltd has been engaged by Aspect Architects to prepare a Site Based
Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) as
additional information in support of a Development Application for a Material Change of Use for a
proposed Eco Resort Extension to the current RACV Noosa Resort located at 94-142 Noosa Drive,
Noosa Heads QLD 4567.
The proposed development as shown in Aspect Architects plans is for eight (8) double storey eco
resort style units, raised boardwalk footpath links and associated carparking. The proposed
application to Council also includes works involving converting an existing pond internal to the RACV
Noosa Resort site into a new pool. ADG make note that this existing pond does not form part of an
existing site-based stormwater treatment train nor provides further stormwater detention
management. The pool works is to form part of separate application submitted to Council for building
approval.
The report comprises of stormwater quantity and quality assessments. The quantity assessment is
undertaken to confirm a ‘non-worsening’ of peak flow discharges from the site and the quality
assessment is undertaken to determine the required stormwater treatment measures to be
implemented on site.
The stormwater quantity objective was to demonstrate that there are no impacts from storm events
up to and including the Q100 storm event. The purpose is to ensure that the existing infrastructure
and/or downstream properties are not adversely affected. Due to negligible increase in peak flows
downstream of the subject site, it is considered unnecessary to include provision for stormwater
quantity management as the proposed site runoff is immediately discharged to Weyba Creek. This
is beneficial during any storm event, as the short time of concentration will allow the runoff from the
site to be quickly dissipated from the area before the onset of the peak Weyba Creek flow and
corresponding tidal effects (stacked hyetograph effect).
Currently no quality stormwater management measures are in place for the Eco Village subject site.
Stormwater treatment measures are to be implemented on site in accordance with Industry Best
Practice, WSUD Engineering Guidelines and, Council’s Land Development Guidelines to provide
stormwater treatment for this site. ADG recommends the use of the following devices to meet the
water quality objectives identified within the SPP 2017 and Council’s WSUD Planning Scheme
Policies:
Combined 40kL Rainwater Tank (Reuse)
30m2 surface area Bioretention Basin
First flush device/s to divert initial flows (first 12mm of rainfall or hose-down) to vegetated areas
All relevant standards and guidelines are addressed in this Stormwater Management Plan including
criteria from the Noosa Shire Council Planning Scheme Policies, Queensland Urban Drainage
Manual (QUDM) 2016, State Planning Policy (SPP) 2017 Plumbing and Drainage Code AS3500.3
and Australian Rainfall and Runoff Guideline (ARR).
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 5
Page 6
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
1 INTRODUCTION
1.1 Background
ADG Engineers (Aust.) Pty Ltd was engaged by Aspect Architects to carry out a Site Based
Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) and
any required referral agencies for a proposed Eco Resort Extension to the current RACV Noosa
Resort located at 94-142 Noosa Drive, Noosa Heads QLD 4567.
The purpose of this Civil Engineering Report is to provide advice on the proposed development about
stormwater drainage, stormwater quality and quantity measures, and flooding. The required
infrastructure will be subject to the conditions attached to the Development Approval to be provided
by Noosa Shire Council and any nominated referral agencies.
1.2 Background Information
This report was compiled using information from the following sources:
‘Dial Before You Dig’ (DBYD) As-Constructed information;
NSC infrastructure mapping (Refer to Appendix F);
NSC flood mapping (Refer to Appendix F);
Detailed survey plan prepared by Skyline Surveyors (Refer to Appendix A);
Architectural drawings by Aspect Architects (Refer to Appendix B); and
Google Maps Aerial Imagery.
1.3 Property Detail
The details of the property for the proposed development can be seen in Table 1 below.
Table 1- Property Detail
Title Lot 203 on SP267424, Lot 0 on SP203415 and Lot 3 on SP126203
Street Address 94 - 142 Noosa Drive, Noosa Heads QLD 4567
Total Site Area 63,839 m2
Developable Site Area 5,457 m2 (Lot 3 on SP126203)
The location of the proposed development is demonstrated in Figure 1.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 6
Page 7
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
N
Subject Site
Development Site Area
Figure 1 - Site Location (as accessed from Noosa Interactive Maps 20.04.22)
2 EXISTING SITE
2.1 Existing Site Features
The subject site is currently occupied by the RACV Noosa Resort.
The site is bound by:
Noosa Drive to the east
Sanctuary Drive (internal road within RACV Noosa Resort) east of the development site area
Weyba Creek Bushland Reserve North, west of the development
Existing college buildings and ancillary structures internal to the site boundary to the east
and south; and
Existing college sporting ovals and Cooroy Creek internally to the west and south-west.
The site generally slopes from the east to the west at a grade of approximately 6%. The existing site features
can be seen in Figure 2.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 7
Page 8
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Location of existing
pond converted to
new pool.
Submitted as part
of separate building
approval
Subject Site
application to
Council
Development
Site Area
Figure 2 - Site Layout (as accessed from Nearmaps 20.04.2022)
The existing contours, surface levels and the location of the existing buildings are identified on the survey plan
drawing as attached in Appendix A of this report.
3 FLOODING
3.1 Flooding Considerations
Review of Councils interactive flood hazard overlay mapping has identified the subject site is located
within an area subject to flooding as can be seen in Figure 3. Any habitable buildings are to ensure
freeboard flood immunity is to set reflective of the nominated Council defined flood level.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 8
Page 9
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Developable
Site Area
Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017)
Furthermore, review of Noosa Shire Council’s 2019 Draft Planning Scheme Policy Coastal Hazards mapping
indicates the subject site is located within an area subject to Sea Level Rise HAT inundation and Stormtide
inundation 1% AEP events. Refer to Appendix F for Council flood mapping plots regarding extents of the
above-mentioned inundation events.
4 STORMWATER INFRASTRUCTURE
4.1 Existing Infrastructure
A Noosa Shire Council DBYD search and detailed survey identified the following stormwater
infrastructure within the vicinity of the subject site:
Existing 1050mm stormwater pipe and associated gully pit traversing the southern portion of 94
Noosa Drive (Lot 203 on SP267424) and the existing Sanctuary Drive Road via kerb and channel
adapters to the north-east of the proposed extension;
Existing Council stormwater infrastructure consisting of 375-525mm stormwater pipes and gully
pits external to 142 Noosa Drive (Lot 3 on SP126203) within the south-eastern roundabout.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 9
Page 10
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Refer to Appendix A for the detailed survey for further information regarding the existing stormwater
infrastructure.
Note: A diversion swale exists within existing RACV Noosa Resort along the development sites
northern boundary internal to the resort development property. ADG refer reader to previous site
reporting documents for details.
4.2 Lawful Point of Discharge (LPD)
4.2.1 Existing LPD
Based on information gathered via survey and contour data, aerial imagery and site investigation it
has been determined that the subject site discharges stormwater flows via a combination of pipework
and overland flow west towards Weyba Creek.
4.2.2 Proposed LPD
It is proposed to maintain the existing ultimate lawful point of discharge being Weyba Creek to the
west.
Refer to Appendix C for the Preliminary Layout Plans prepared by this office.
4.3 External Catchment
No significant upstream catchment directly acts on the developable site area, other than the carpark
extends beyond the boundary line. The area within Sanctuary Drive discharges to the existing council
infrastructure with the road via kerb and channel adapters, remain unchanged.
Refer to Appendix A for the detailed survey for further information regarding the existing site
features.
5 STORMWATER QUANTITY ASSESSMENT
The aim of the stormwater quantity assessment is to ensure that the development shall impose no
adverse effects on downstream properties or receiving water bodies and that the conveyance of
flows will be in a safe manner with minimal risk of human endangerment as well as the following
objectives:
Address the need for stormwater quantity control measures.
Ensure there is no actional impacts from the subject site for events up to and including the 1% AEP
event.
Ensure proposed quantity control measures detain and convey flows in accordance with QUDM
(2017) minimum freeboard recommendations.
5.1 Proposed Development and Associated Issues
In this development, the developable site area leads to negligible increase in peak flows downstream
of the subject site and immediately discharges to Weyba Creek, hence it is considered unnecessary
to include provision for stormwater quantity management. This is beneficial during any storm event,
as the short time of concentration will allow the runoff from the site to be quickly dissipated from the
area before the onset of the peak Weyba Creek flow and corresponding tidal effects.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 10
Page 11
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
6 STORMWATER QUALITY ASSESSMENT
6.1 Treatment Objectives
This assessment identifies issues relating to stormwater quality runoff and assesses possible
methods of treatment if required. The aim of this section of the report is to determine practical
approaches to achieving improvements in the quality of the stormwater run-off from the site that can
be readily implemented.
The SPP 2017 proposes criteria which apply to ‘high-risk’ development for stormwater. The criteria
include one or more of the following:
A Material Change of Use (MCU) for an urban purpose which involves greater than 2,500m2 of
land that:
will result in an impervious area greater than 25% of the net developable area; or
will result in six (6) or more dwellings
A Reconfiguration of a Lot (ROL) for urban purposes that involves a land area greater than
2,500m2 and will result in six (6) or more lots; or
Operational works for urban purposes that involve disturbing more than 2,500m2 of land.
The proposal includes an MCU for a land area of 2,500m 2 that will result in impervious area greater
than 25% of the developable area. Hence, the development is classed as ‘high risk’ for water quality
and the SPP 2017 applies.
The SPP 2017 suggests the development aims to:
Avoid or otherwise minimises adverse impacts on the environmental values of receiving waters,
arising from:
altered stormwater quality or flows, and
wastewater (other than contaminated stormwater and sewage), and
the creation or expansion of non-tidal artificial waterways, and
Demonstrate compliance with the SPP code - Water quality (Appendix 3).
Appendix 2 (Table B) of SPP 2017 suggests ‘Post Construction Phase – Stormwater Management
Design Objectives’ as:
Table 2 - South East Queensland (SEQ) Targets
Total Suspended Solids Total Phosphorus Total Nitrogen Gross Pollutants
(TSS) (TP) (TN) >5mm
80% Removal 60% Removal 45% Removal 90% Removal
The objective is to provide the following:
Nitrogen and Phosphorous removal
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 11
Page 12
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Gross Pollutant and Suspended Solids Removal
All of the site’s impervious areas discharge to suitable treatment device/s
Treatment device selection criteria are to be in accordance with Industry Best Practice and,
WSUD Engineering Guidelines
Provide engineering diagrams of the stormwater quality treatment of the proposed development
6.2 Site Analysis and Design Strategy
6.2.1 Pre-Development Phase
An Erosion Hazard Assessment has been carried out for the proposed development – refer to
Appendix E for a copy of the completed Noosa Shire Council form. As a result of this assessment,
it was determined that the overall site is a ‘low’ risk.
Prior to construction commencing, the following erosion and sediment control measures will need to
be installed around the subject site to minimise disturbance and ensure the quality of runoff
discharging from the site is of an acceptable standard:
Sediment barriers to be installed on all entrances to downstream stormwater infrastructure (i.e.
gully pits);
Designation of transport routes through the site to minimise vegetation disturbance;
Maximise retention of existing vegetation to reduce soil disturbance and provide filter strip
treatment for runoff;
Install construction entry and exit shakedown areas;
Sediment fences are to be installed on the downstream boundaries of the subject site; and
Install dust control measures as required.
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
Further to the above considerations, it is the developments intent to limit ground disturbing activities
to a minimum. Other than the final carparking area, all structures and footpaths are proposed to be
suspended over the natural surface.
6.2.2 Bulk Earthworks Phase
During the bulk earthworks phase, the following erosion and sediment control measure will need to
be installed in addition to the aforementioned measures (Pre-Development Phase) to ensure there
is minimal disturbance to downstream receiving water bodies:
Construction chutes to control runoff over earthworks batters;
Construction of temporary bunds at the top of all earthworks batters to ensure runoff is directed
away from exposed batters;
Sediment basins to be constructed at low points within each stage of the proposed development;
Sediment fences to be installed on the downstream side of any stockpiles; and
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 12
Page 13
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Stabilisation of all batters upon reaching the finished earthworks levels.
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
6.2.3 Construction Phase
During the construction phase of the development, there is a risk of sedimentation transport due to
disturbed land. The following erosion and sediment control measure will need to be installed in
addition to the aforementioned measures (Pre-Development and Bulk Earthworks Phases) to ensure
there is minimal disturbance and the quality of runoff is maintained to an acceptable standard:
Construction of temporary diversion drains to divert water to sediment basins;
Construction of temporary diversion drains to divert water to protect bioretention and treatment
devices as required;
Sediment barriers to be installed on all entrances to newly constructed stormwater infrastructure
(i.e. gully pits);
Sediment fences to be installed on the downstream side of any stockpiles and batters; and
Re-vegetation of all disturbed areas within two (2) weeks of completion.
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
6.2.4 Maintenance
All erosion and sediment control devices are to be maintained through the entire phase of the
development leading up to the operational phase. Erosion and sediment control devices will need to
be monitored closely throughout the entire project to ensure they are operating correctly and
efficiently. No erosion and sediment control devices are to be removed unless otherwise authorized
by a suitably qualified engineer or the site superintendent.
6.3 Operational Phase Treatment
Once directed to be commissioned by the superintendent and engineers, the Stormwater Quality
Improvement Devices (SQIDs) will provide the required level of stormwater quality treatment to runoff
from the site prior to discharging into Council’s stormwater drainage infrastructure. It is expected that
sediment laden runoff and the erosion potential at the subject site during the operational phase will
be minimal. This is due to impervious developed areas in the form of roofs, driveways and carparking.
It is understood that the footprint of these impervious areas has been reduced as much as
practicable. The proposed landscaped areas will be maintained in a manner that will minimise
erosion.
Existing grassed and proposed landscaped areas will be maintained in a manner that will minimise
erosion, some of which would be subject to erosion of topsoil from garden beds, erosion of soil from
behind retaining walls, etc.
6.4 Stormwater Quality Improvement Devices (SQIDs)
A stormwater treatment train has been established to treat the runoff from the proposed development
that includes the developable works area only (impervious carparking and units). The remaining
catchment consists of heavily vegetated landscaping that has been excluded from the treatment
train. The proposed treatment train will enable a higher level of pollutant removal efficiency by using
stormwater quality improvement devices (SQIDs). Maintenance of the SQIDs will be the
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 13
Page 14
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
responsibility of the owners of the development. The maintenance should be carried out in
accordance with the Council and Noosa RACV Resort recommendations.
6.4.1 First Flush Device
First flush device/s to divert initial flows (first 12mm of rainfall or hose-down) to the vegetated
area.
The initial runoff from the site’s roof area will be directed to the non-disturbed vegetated areas via a
first flush device/s. This will ensure that accumulated loose material collected in the initial roof runoff
during a rainfall event is collected and diverted to landscape/garden areas before flows enter the
rainwater and tank. A first flush device has a set limit on its capacity to convey flows. Once the initial
runoff from a rainfall event meets this capacity of the first flush device, the remainder of flows for the
event are diverted to the Lawful Point of Discharge.
6.4.2 Bioretention Basin
A minimum 30m2 surface area bioretention basin.
Bioretention basins remove contaminants and sedimentation from stormwater runoff via infiltration
through layers of soil media. The basin is made of a 400mm filter media layer and a 100mm transition
layer located above in-situ soil. The basin is to be vegetated, as per the landscape architect’s
recommendations. These plants provide additional treatment and will prevent clogging of the basin.
Runoff within the bioretention area gradually infiltrates the soil layers, and freely discharge subsoil to
an outfall to Weyba Creek. This will be confirmed in the detailed design stage.
6.5 Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank
To satisfy Council’s code performance outcomes by reducing the need for mains water, the roof area
is to be connected to a rainwater tank with a minimum capacity of 5,000L in accordance with
Department of Housing and Public Works MP4.2 – Rainwater Tanks and Other Supplementary Water
Supply Systems. This equates to a total rainwater tank volume of 40 kL. Each rainwater tank is to be
plumbed to be available for outdoor cleaning, washing machines and toilet flushing in accordance
with Council’s WSUD Planning Scheme Policies.
6.5.1 Internal Demand
To calculate expected internal demand, the following assumptions were made:
Toilet requires 25 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
Guidelines 2010;
Laundry requires 21 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
Guidelines 2010;
Peak occupancy of two (2) people per dwelling for the proposed 16x 2-bedroom units for the
holiday accommodation in accordance with Table 4.3 of the MUSIC Modelling Guidelines 2010.
Based on these assumptions the required volume for the internal demand component of the
rainwater tank is calculated as;
25 L/day (per person) + 21 L/day (per person) x 2 people per dwelling (peak) = 92 L/day
Daily demand (representing indoor use) = 92 L/d / 16 units = 1,472 L / day = 1.472 kL / day
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 14
Page 15
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
6.6 MUSIC Model
The sites stormwater run-off for the development was modelled using MUSIC (version 6.3.0) and the
water quality objectives for South East Queensland specified in the SPP 2017 of 80% TSS reduction,
60% TP reduction, 45% TN reduction, and 90% Gross Pollutants reduction.
Figure 4 - Treatment train
The results of the above MUSIC model are presented in Figure 5.
Figure 5 - Results for the treatment train
The above results meet the percent reduction water quality objectives identified by Noosa Shire
Council standards and the SPP 2017.
Details of the MUSIC model are attached within Appendix G for further information.
Refer to Appendix C for the Preliminary Layout Plans prepared by this office.
6.7 On-site Treatment Lifecycle Costs
A lifecycle cost analysis is not a part of the scope of this report. All the recommended water quality
treatment infrastructure lies within the development site and it shall be maintained and serviced by
the owners of the development at no cost to Council.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 15
Page 16
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
6.8 Water Quality Monitoring
No water quality monitoring is proposed for this development at this stage due to the nature of the
development and the expected pollutant levels.
6.9 Maintenance
Maintenance of the SQIDs will be the responsibility of the owners of the development. The
maintenance should be carried out in accordance with the manufacturer’s recommendations.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 16
Page 17
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
7 CONCLUSION
In preparing this report, we have achieved all requirements for Site Based Stormwater Management
Plans as described in the State Planning Policy (2017), Noosa Shire Council Planning Scheme
Policies, Queensland Urban Drainage Manual (QUDM) 2016, Plumbing and Drainage Code
AS3500.3 and Australian Rainfall and Runoff Guideline (ARR).
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 17
Page 18
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
Appendix A
Site Survey
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 19
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 20
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 21
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 22
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 23
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 24
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 25
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 26
Page 27
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
Appendix B
Architectural Drawings
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 28
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 20/06/22 CONSULTANTS REVIEW ZT
10m WIDE
FIRE BUFFER
MANAGED ZONE
STORE
UNIT 1 20 CARPARKS
100
00
LINE
NG
LDI
BUI
UNIT 8
UNIT 2
UNIT 7
UNIT 6
UNIT 3
UNIT 5
TOOWOOMBA | BRISBANE | MAROOCHYDORE
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
UNIT 4 BOAQ 4487
BUILDING DESIGNERS
ASSOCIATION
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
C:\Users\z.thorp\Documents\Revit User Files\AP210910-S01_REVISED_z.thorp.rvt
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
PROJECT
RACV NOOSA RESORT - ECO
RESORT
FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
@
PROJECT ADDRESS
DRAWING TITLE
20/06/2022 2:38:22 PM
SITE PLAN
N DATE SCALE @ A1 DRAWN CHECKED
20/06/22 1 : 250 AS TB
DRAWING No. ISSUE
1:250
0 2 4 6 8 10 20 21-0910_ 10-01 A
Page 29
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 16/05/22 SITE SECTIONS ISSUE ZT
B 27/05/22 CONSULTANTS REVIEW ZT
C 20/06/22 CONSULTANTS REVIEW ZT
10m WIDE
FIRE BUFFER
MANAGED ZONE
8m HEIGHT LIMIT
UNIT 8
2500
2500
UNIT 1 LV 1 WALKWAY
LV 1 CARPARK
3000
RL 3.200
RL 3.200
2900
GROUND
GROUND
EXISTING GROUND LINE
NEW STONE RETAINING WALL
SITE SECTION A
1
1 : 200
4000 6000
BOUNDARY
BOUNDARY
FIRE BUFFER SETBACK
BUILDING SETBACK
8m HEIGHT LIMIT
UNIT 6
2500
LV 1
UNIT 2 CARPARK
(BEYOND) WALKWAY
3000
WALKWAY
GROUND
NEW STONE RETAINING WALL
SITE SECTION B
2
1 : 200
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
6000
ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
BOUNDARY
FIRE BUFFER SETBACK
BUILDING DESIGNERS
ASSOCIATION
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
8m HEIGHT LIMIT RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
C:\Users\z.thorp\Documents\Revit User Files\AP210910-S01_REVISED_z.thorp.rvt
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
2500
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
UNIT 2 UNIT 1 NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
LV 1 PERMISSION OF ASPECT .
CARPARK PROJECT
RACV NOOSA RESORT - ECO
RL 3.200
3000
GROUND RESORT
FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
CONCEPT DESIGN
@
PROJECT ADDRESS
DRAWING TITLE
SITE SECTION C
21/06/2022 12:00:00 PM
3 SITE SECTIONS
1 : 200 DATE SCALE @ A1 DRAWN CHECKED
20/06/22 1 : 200 AS TB
DRAWING No. ISSUE
1:200
0 2 4 6 8 10 20m 21-0910_ A50-01 C
Page 30
C:\Users\z.thorp\Documents\Revit User Files\AP210910-S01_REVISED_z.thorp.rvt 21/06/2022 12:02:12 PM 2500 3000 und Floor, a CABIN SECTION 01 —* 4:100 Boardwalk 2500 3000 (Cc) \o) 4600 DINING oy CABIN SECTION 02 “/ 4:100 Roof 2500 | DINING BED 1 TH — a l __—_ Level 1 3000 , DINING 1 BED 1 a 3) DUPLEX CABIN SECTION 01 —* 4:100 Ground Floor- A M4 R 3) ww Level 1 Ground Floor (3) Cee 3) ee © ! 2560 ! 1800 2405, | ] b | 3000 A DUPLEX CABIN SECTION 02 4: 100 = oa So oO oO = i) wo aN oa = Oo Level 1 Ground Floor IMPORTANT: ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH THE GENERAL NOTES SHEET AMENDMENT SCHEDULE ISS. DATE DESCRIPTION BY A 27/05/22 CONSULTANTS REVIEW B 20/06/22 CONSULTANTS REVIEW NN INASPECT TOOWOOMBA | BRISBANE | MOOLOOLABA www.aspectapm.net ABN 96 071 786 948 ACN 071 786 948 BOAQ 4487 BUILDING DESIGNERS "ASSOCIATION a 0 GENERAL NOTES THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL. RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS. SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS. CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN PERMISSION OF ASPECT . PROJECT RACV NOOSA RESORT - ECO RESORT CONCEPT DESIGN FOR ROYAL AUTOMOBILE CLUB OF VICTORIA @ PROJECT ADDRESS DRAWING TITLE TYPICAL CABIN SECTIONS DATE SCALE @A1 DRAWN CHECKED 20/06/22 1: 100 AS TB DRAWING No. ISSUE 21-0910_ A50-02 B
Page 31
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 20/06/22 CONSULTANTS REVIEW ZT
VIEW 01
UNIT 3
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
BUILDING DESIGNERS
ASSOCIATION
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
C:\Users\z.thorp\Documents\Revit User Files\AP210910-S01_REVISED_z.thorp.rvt
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
PROJECT
RACV NOOSA RESORT - ECO
VIEW 02 RESORT
UNIT 3 FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
CONCEPT DESIGN
@
PROJECT ADDRESS
DRAWING TITLE
20/06/2022 4:06:25 PM
PERSPECTIVES
DATE SCALE @ A1 DRAWN CHECKED
20/06/22 AS TB
DRAWING No. ISSUE
21-0910_ A90-01 A
Page 32
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 20/06/22 CONSULTANTS REVIEW ZT
VIEW 01
UNITS 7 & 8
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
BUILDING DESIGNERS
ASSOCIATION
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
C:\Users\z.thorp\Documents\Revit User Files\AP210910-S01_REVISED_z.thorp.rvt
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
PROJECT
RACV NOOSA RESORT - ECO
VIEW 02 RESORT
UNITS 6 (LEFT), 4 (FAR BACK) & 3 (RIGHT) FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
CONCEPT DESIGN
@
PROJECT ADDRESS
DRAWING TITLE
20/06/2022 4:06:37 PM
PERSEPCTIVES
DATE SCALE @ A1 DRAWN CHECKED
20/06/22 AS TB
DRAWING No. ISSUE
21-0910_ A90-02 A
Page 33
(3) wv, (eo) (8) (D) 22800 ®) Ns (o) NU? 3400 4600 3400 3400 4600 3400 LS 12560 3600 DECK 01 a |) BED4 \ 4600 1 i Sem || LOUNGE —_* AA ( DINING =" KITCHEN — DECK 02 = = DECK 02 a a [__| LOUNGE DINING 7 BED 2 BED 2 N ENTRY | 3 |sKITCHEN EA te 2560 1800 ~ ENSUITE O @ | UNIT 5&6 CONCEPT DESIGN ISSUE IMPORTANT: ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH THE GENERAL NOTES ON SHEET: A.00 No| Date | Amendment A 21/01/22 CONCEPT B 25/03/22 REVISION C 27/05/22 CONSULTANTS REVIEW D 20/06/22 CLIENT REVIEW GENERAL NOTES THIS PLAN RELEVANT DRAWINGS, AMENDMENTS SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT ANDIOR RELEVANT LOCAL AUTHORITY. THESE HAS BEEN PREPARED IN ACCORDANCE WITH ALL BUILDING CODES AND STANDARDS. NO BUILDING, ‘ARE SUPPLIED ON THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS’ LIABILITY IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS. ‘CONTRACT ORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK OR PRODUCING SHOP. DRAWINGS, THESE DRAWINGS ARE PROTECTED BY THE LAWS. OF COPYRIGHT AND MAY NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN PERMISSION OF ASPECT ALL DRAINAGE TO BE IN ACCORDANCE WITH LOCAL COUNCIL REQUIREMENTS AND APPROVED PLANS. ASPECT DESIGN STUDIOS IS NOT RESPONSIBLE FOR THE STRUCTURAL DESIGN OF THIS ga Ss BUILDING DESIGNERS ea "ASSOCIATION ASPECT TOOWOOMBA BRISBANE P. (07) 46 329 962 www.aspectapm.net A.B.N 96071786948 BOAQ 4487 RACV ECO CABIN RESORT NOOSA RACV Designer ~ | Sheet Name DUPLEX - FLOOR PLAN 01 Drawn by ~ | Sheet Number Gheckedby Checker A21-01 Client Signature / / Plot Date 20/06/22 Project Number 210910 | Scale 1:100 A3
Page 34
(pn) (By (c) (Dd) (E) (F) (6)
Ce (8) i) O (Ee) FD) \S)
| 22800 | |
T T T T T
3400 ; 4600 3400 3400 4600 3400
a fff
b
WY =
8
8 | | LOUNGE |_| 2
8 DECK 01 an a
| }—__F —— ; J bl
> DECK 02 —L —
(> \ :
Se ; 1 ed y = FA 7 = - a I | |
| BED 1 \ [| DINING jj LOUNGE r
. . i DECK 01
‘ef te! 7 BED 2 :
So =|
g| & DECK 02
R _
= ODO ENTRY FAA
|_| r-—4 (| DINING |}
(3\— = = ] INTCHEN | _ a - = = =)
Ye \ ee / |
° tre ENSUITE L/L _ |
gs —
n ye | | ENTRY
t | —— AL a
~ mi —-h | a 7 KITCHEN
= [
\4 J ~ ~ — = — ria — YT — _
2 ; Kt 4++UP a es
8 | ITT] ENSUITE =
= | H QO y
~ @ | —
( 5 } a + a a + a a a SS —————— = = =
WY
\
XY 8
a
—| rir ded &
| | ENSUITE |
| | co |
U N IT 7 & 8 \ \ \ ee \ \ >
IMPORTANT: ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH THE GENERAL NOTES ON SHEET: A.00
No| Date | Amendment GENERAL NOTES RACV Designer - | Sheet Name DUPLEX - FLOOR PLAN
| ESgrtiaserrermescoprgg ns | a cs
A 2101/22 CONCEPT AMENDMENTS SHALL BE MADE WITHOUT mebROVAL | SAGERERPONSILE SOR SE SiRCN TUR DESC OE ES TOOWOOMBA Drawn by ~ | Sheet Number
FROM ASPECT AND/OR RELEVANT LOCAL AUTHORITY. THESE | BUILDING. BRISBANE a A21 01
B 25/03/22, REVISION EVENT OF ERROR, ASPECTS UAB SLUMTEDOMY TO | P. (07) 46 329 962 Checked by Checker .
C 27/05/22 CONSULTANTS REVIEW ‘THE COST OF AMENDING THESE DRAWINGS. ga www.aspectapm.net | ECO CABIN RESORT
D 20/06/22 CLIENT REVIEW re ; eS niSer feasts Client Signature /_/__| PlotDate 20/06/22
DRAWINGS THESE DRAWINGS ARE PROTECTED BY THE LAWS i, Boag 4487 | NOOSA RACV /
WITHOUT THE WRITTEN PERMISSIONOF ASPECT. ae ee Project Number 210910 mscae 1:100 A3
Page 35
UNITS 2-4 |
UNIT 1 MIRROR REVERSE
| 11400 y
L 3400 4600 L 3400
2505
(4)\—- + = ee -
r
8 | dl
8 DECK
1
LOUNGE SOFA BED
— |
@-- +, -
] AA
s [| DINING J]
5
= 2°
3
t+
(a
SZ
S N
g
-
(4\)—-—+- - —
(ej-L BL _
2
AREAS
UNIT GFA
DECK
97m?
9m2
CONCEPT DESIGN ISSUE
IMPORTANT: ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH THE GENERAL NOTES ON SHEET: A.00
No |
Amendment
moon>
Date
21/01/22
28/01/22
25/03/22
27/05/22
20/06/22
CONCEPT
CONCPET V2
REVISION
CONSULTANTS REVIEW
CLIENT REVIEW
GENERAL NOTES
‘THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO
AMENDMENTS SHALL BE MADE WITHOUT THE APPROVAL
FROM ASPECT ANDIOR RELEVANT LOCAL AUTHORITY. THESE
DRAWINGS ARE SUPPLIED ON THE CONDITION THAT, IN THE
EVENT OF ERROR, ASPECTS’ LIABILITY IS LIMITED ONLY TO
THE COST OF AMENDING THESE DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE.
BEFORE COMMENCING ANY WORK OR PRODUCING SHOP.
DRAWINGS, THESE DRAWINGS ARE PROTECTED BY THE LAWS
OF COPYRIGHT AND MAY NOT BE COPIED OR REPRODUCED
WITHOUT THE WRITTEN PERMISSION OF ASPECT
ALL DRAINAGE TO BE IN ACCORDANCE WITH LOCAL COUNCIL
REQUIREMENTS AND APPROVED PLANS. ASPECT DESIGN STUDIOS
IS NOT RESPONSIBLE FOR THE STRUCTURAL DESIGN OF THIS
BUILDING,
A)
z BUILDING DESIGNERS. éa
"ASSOCIATION
ASPECT
TOOWOOMBA
BRISBANE
P. (07) 46 329 962
www.aspectapm.net
A.B.N 96071786948
BOAQ 4487
RACV Designer ~ | Sheet Name SINGLE UNIT - FLOOR PLAN LAYOUT
Drawn by ~ | Sheet Number
Checked by Checker A2 1 -01
ECO CABIN RESORT Client Signature Plot Date
NOOSA RACV / / 20/06/22
Project Number 21-0910 | Scale 1:100 A3
Page 36
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
Appendix C
ADG Preliminary Plans
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 37
01
01
CIVIL
TM
22366
SK01
15.06.22
03.06.19
T 1300 657 402
All intellectual property rights (including, without limitation, all
copyright and design rights) subsisting in the drawings and related
Level 3, 2 Emporium Place,
information belongs to ADG Engineers (Aust) Pty Ltd ("ADG").
Sunshine Coast Office
TM
MVI
Drawings or information are provided for general information
F +613 5444 0536
purposes only and may not contain the full details required for
E [email protected] W www.adgce.com
Maroochydore, Queensland 4558, Australia
PO Box 5014, Maroochydore BC, QLD 4558
construction. ADG makes no warranties, either express or implied,
ISSUED FOR INFORMATION
ISSUED FOR INFORMATION
of merchantability and fitness of the drawings or data for any
CATCHMENT PLAN
particular purpose.
PRE DEVELOPMENT
ASPECT ARCHITECTS
BRISBANE / SYDNEY MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
ADG accepts no responsibility or liability for any loss or damage
MVI
NTS
caused to the recipient or any third party through use of the
drawings or related information in any way.
NOT FOR CONSTRUCTION
PRELIMINARY
TM
BP
PRELIMINARY
02
RACV NOOSA ECO RESORT
94-142 NOOSA DR, NOOSA
(at A1)
MVI
MVI
Legend
Site Grade Direction
Stormwater Catchment B'dy
A
A
CATCHMENT ID
AREA
0.5262 ha
Catchment Table
0.0085
IMPERVIOUS AREA
Page 38
IMPORTANT:
PRELIMINARY ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
PROVIDE 11.5m2 BIORETENTION BASIN NOT FOR CONSTRUCTION
AMENDMENT SCHEDULE
(MEASURED AT THE SURFACE OF EXTENDED
ISS DATE DESCRIPTION BY
DETENTION DEPTH). A 27/05/22 CONSULTANTS REVIEW ZT
- FILTER MEDIA DEPTH 0.4m
- EXTENDED DETENTION DEPTH 0.3m
copyright and design rights) subsisting in the drawings and related
construction. ADG makes no warranties, either express or implied,
- NON LINED AND NO UNDERDRAIN PRESENT
ADG accepts no responsibility or liability for any loss or damage
purposes only and may not contain the full details required for
All intellectual property rights (including, without limitation, all
- CONSTRUCT TRANSITION LAYER ON EXISTING
information belongs to ADG Engineers (Aust) Pty Ltd ("ADG").
of merchantability and fitness of the drawings or data for any
Drawings or information are provided for general information
caused to the recipient or any third party through use of the
IN-SITU SOIL FOR EXFILTRATION
20 CARPARKS
drawings or related information in any way.
STORE
RL 3.200
52 0
0
RL 3.200 15 0
0
UNIT 1
LEGEND
particular purpose.
63
Stormwater Catchment Boundary
00
Site Grade Direction
RL 4.000
UNIT 8
RL 3.200
CATCHMENT ID AREA IMPERVIOUS AREA PROPOSED PAD RL 3.400
RL 3.200
63
RL 4.000
00
A 0.5261 ha 0.162 UNIT 2
12
00
RL 4.000
52
UNIT 7
00
A
RL 4.000
4600
1500
RL 4.600
UNIT 6
3800
PROPOSED PAD RL 4.000
RL 4.000
PROVIDE 8x 5kL RAINWATER RL 4.600
TANKS AS SHOWN. TANKS TO UNIT 3
UNIT 5
BE PLUMBED FOR INTERNAL
RL 4.600
USE. TO BE CONFIRMED
DURING DETAILED DESIGN.
02 15.06.22 Issued For Information TM MVI
01 03.06.19 Issued For Information BP MVI
RL 4.600 TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
UNIT 4
BOAQ 4487
BUILDING DESIGNERS
ASSOCIATION
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
Aspect Architects
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
C:\Users\z.thorp\Documents\Revit User Files\AP210910-S01_REVISED_z.thorp.rvt
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
RACV NOOSA ECO RESORT
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
94-142 RACV
NOOSA DR, NOOSA
PERMISSION OF ASPECT .
PROJECT
NOOSA RESORT - ECO
RESORT
POST DEVELOPMENT
ROYAL AUTOMOBILE CLUB OF
FOR
94-142 VICTORIA
NOOSA DR, NOOSA
CONCEPT DESIGN
@
PROJECT ADDRESS
CIVIL DRAWING TITLE PRELIMINARY
TM DM MVI
27/05/2022 10:27:05 AM
SITE PLAN - CONTOURS
22366
N TM
DATE
NTS
DRAWN (at A1)
CHECKED SCALE @ A1
27/05/22 1 : 250 AS TB
SK02
DRAWING No. ISSUE
1:250
21-0910_ A10-10 02A
0 2 4 6 8 10 20
Page 39
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
Appendix D
Landscape Concept
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 40
LANDSCAPE CONCEPT PACKAGEE
RACV NOOSA RESORT
94/142 NOOSA DRIVE, NOOSA
JUNE 2022
INDEX
LC00 - COVER SHEET
LC01 - LANDSCAPE CONCEPT PLAN
LC02 - LANDSCAPE SECTIONS
LC03 - SOFTSCAPE PLANTING PALETTE
Page 41
E
ADJASCENT BUSHLAND
ARY DRIV
AND SEDGELAND AREAS TO
THE NORTH
LOCATION OF PROPOSED
RAIN GARDEN TO TREAT
STORMWATER RUNOFF
SANCTU
SMALL EUCALYPT SPECIES
TO BE PLANTED AROUND
CARPARK FOR SHAD,
SCREENING AND HABITAT EXISTING VEGETATION TO BE RETAINED TO
CARPARK ENTRY
A
STORE AREA TO INCLUDING TIMBER
C SCREEN AND VINE TRELLIS
UNIT 1
A
UNIT 8
UNIT 2
B A
E
UNIT 7
B D
WEYBA CREEK DR
S A
O
NO
UNIT 6 B
GROUNDCOVERS AND LOW GROWING
SHRUBS TO OUTSIDE OF DEVELOPMENT
AND TOP OF NEW RETAINING WALL
APPROX EXTENT OF MANGROVE UNIT 3
SHRUBLAND TO WEYBA CREEK B
UNIT 5
ELEVATED BOARDWALK TO LIMIT IMPACTS TO EXISTING TREE
ROOTS AND VACILITATE BARRIER FREE MOVEMENT BETWEEN
AREAS OF RETAINED VEGETATION
UNIT 4
APPROX. LOCATION OF LOW RETAINING WALL TO OUTSIDE OF
PROPOSED BUILDING PAD
B
EXISTING MATURE TREES TO BE RETAINED IN
ACCORDANCE WITH ARBORIST RECOMMENDATIONS
LE
SL
IE
D
R
RD
BA
EY
W
LANDSCAPE INTENT STATEMENT LEGEND
The landscape design aims to preserve the maximum amount of native vegetation existing within the site, this includes hollow bearing trees, koala New carpark area. Pavement finish in accordance
food trees and remnant habitat. The existing vegetation community present within the site is highly degraded and will be improved through the A
removal of environmental weed species including exotic vines which currently dominate the understory and existing canopy. Rehabilitation works will
with enginners details
focus on weed removal in addition to supplementary plantings of endemic understory species and strategic planting of habitat trees. Existing bushland areas to include supplementary
B endemic plantings of trees and understorey species
As an eco development the design will focus on preserving the natural setting, improving views to natural landscape elements and in turn
establishing a greater connection between the natural environment of Noosa and resort visitors. Bushfire management zone to include species with
C low flamability characteristics
Environmentally beneficial aspects of the design include:
• Use of elevated boardwalk system to reduce impacts to existing vegetation impacts; Elevated boardwalk constructed from composite
• Barrier free design to cater for fauna movement though the site into areas adjoing Weyba Creek; D decking material
• Use of sustainable materials including boardwalk decking;
• Boardwalk to incorporate services to reduce trenching impacts to vegetation; Existing amenity plantings to be retained at site entry
• Potential use of permeable pavement finishes to carpark areas to reduce runoff and impacts to existing vegetation; E
• Rehabilitation of existing vegetation areas including weed removals;
• Revegetation plantings including endemic species;
• Non slab on ground construction therefore limiting impacts to existing vegetation; and Fauna Movement - Existing fauna movement
• Units situated in areas where the least significant vegetation exist. corridors to be retained and enhanced
through the planting of NJKH’S. Buildings,
carpark and access pathways to incorporate
barrier free design
LANDSCAPE CONCEPT PLAN
PROJECT: PLAN: REV: NORTH:
212953 LC01 A
PROPOSED ECO RESORT AT 94/142 NOOSA DR, NOOSA SCALE: 1:250 @ A1
DATE: 06 JUNE 2022
FOR RACV FILE: 212953.indd
Page 42
BUSHFIRE MANAGEMENT ZONE
UNIT 8
UNIT 1
SECTION A - 1:100@A1
UNIT 6
UNIT 3
SECTION B - 1:100@A1
LANDSCAPE CONCEPT PLAN
PROJECT: PLAN: REV: NORTH:
212953 LC02 A
PROPOSED ECO RESORT AT 94/142 NOOSA DR, NOOSA HEADS
SCALE: 1:250 @ A1
FOR RACV DATE:
FILE:
06 JUNE 2022
212953.indd
Page 43
CHARACTER IMAGRY PROPOSED LANDSCAPE PLANTING PALETTE
COMMON NAME SCENTIFIC NAME
TREES AND PALMS
Bangalow Palm Archontophoenix cunninghamiana
Screwpine Pandanas tectorius (Entry Feature Planting)
Weeping Lilly Pilly Waterhousea floribunda
Broad Leaved Paperbark Melaleuca quinquenervia
Cabbage Tree Livistona decora
Swamp Bloodwood Eucalyptus robusta
Blush Satinash Acmena hemilampra
Tulipwood Harpullia pendula
Frazer Island Apple Acronychia imperforata
SHRUBS AND ACCENTS
Bullocks Heart Macaranga tanarius
Copper Tops Austromyrtus ‘Copper Tops’
Rocky Rambler Callistemon ‘Rocky Rambler’
Anzac White Callistemon ‘White Anzac’
Pink Euodia Melicope elleryana
Native Ginger Alpinia caerulea
Honey Myrtle Melaleuca thymifolia
GROUNDCOVERS / GRASSES
Temple Grass Zoysia tenuifolia
Blue Flax Lily Dianella caerulea
Spiney Headed Mat Rush Lomandra hystrix
TREES SHRUBS AND ACCENTS Sarsaparilla vine Hardenbergia violacea
Basket Grass Oplismenus aemulus
Saw Sedge Gahnia clarkei
Swamp Water Fern Blechnum indicum
Gristle Fern Blechnum cartilagineum
Scrambling Lily Geitonoplesium cymosum
Blady Grass Imperata cylindrica
Bracken Fern Pteridium esculentum
Elaeocarpus reticulatus Banksia robur Glochideon ferdinandii Melicope elleryana Archontopheonix cunninghamiana
GROUNDCOVERS / UNDERSTORY
Zoysia tenuifolia Dianella caerulea Hardenbergia violacea Oplismenus aemulus Gahnia clarkei Blechnum cartilagineum Aspenium australasicum Lomandra hystrix Geitonoplesium cymosum
LANDSCAPE CONCEPT PLAN
PROJECT: PLAN: REV:
212953 LC03 A
PROPOSED ECO RESORT AT 94/142 NOOSA DR, NOOSA HEADS
SCALE: NTS
FOR RACV DATE:
FILE:
06 JUNE 2022
212953.indd
Page 44
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
Appendix E
NSC Code Responses
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 45
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Stormwater drainage design AO1
PO1 A stormwater management plan is prepared consistent Development will comply. Refer to
The development and its stormwater management system is with PSP6 Engineering Design Standards - Roads, Stormwater Management Plan, in
planned and designed having regard to: drainage and earthworks. specific stormwater quality and
1. the natural features of the site;
quantity section prepared by this
2. the need to avoid impacts and potential risks
office.
to ecologically important areas;
3. the likely effectiveness of erosion and sediment
control and stormwater drainage measures during
rainfall events during and post construction; and
4. the need to protect environmental values and water
quality of receiving waters both during and post
construction.
PO2 AO2.1 To be complied with at detailed
Stormwater drainage infrastructure is planned, designed and Stormwater drainage planning, design and construction design / construction stages in
constructed to: is in accordance with PSP6 Engineering Design conjunction with the Stormwater
Standards - Roads, drainage and earthworks and the Management Plan, prepared by
1. incorporate allowance for increased flood risk latest version of the Queensland Urban Drainage Design
and tidal inundation through pipework as a this office.
Manual.
result of climate change and sea level rise; AO2.2 Rainwater captured in Bioretention
2. ensure the development is adequately drained; The stormwater drainage system connects to a lawful Basin will gradually infiltrate to soil
and point of discharge in accordance with PSP6 Engineering
3. ensure stormwater is managed and lawfully
layers and freely discharges
Design Standards - Roads, drainage and earthworks. subsoil to an outfall to Weyba
discharged without altering stormwater
drainage characteristics external to the site. Creek
AO2.3 Development will comply, refer to
Stormwater flows discharging from the development are Stormwater Management Plan, in
demonstrated to be consistent with pre-development specific stormwater quantity
characteristics. section prepared by this office.
Page 1 of 12
June 2021
Page 46
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO2.4 Development will comply, refer to
Development provides for the management of Stormwater Management Plan
stormwater to incorporate appropriate allowance for prepared by this office.
climate change impacts (including rainfall intensity and
sea level rise), in accordance in accordance with PSP6
Engineering Design Standards – Roads, Drainage and
Earthworks.
PO3 AO3.1 N/A. No stormwater from the site is
Stormwater drainage infrastructure conveys run-off in a Stormwater drainage infrastructure meets the desired directed towards roads.
manner that allows roads to deliver desired standards of standards of service for roads functionality set out in PSP6
service appropriate to the local conditions and local Engineering Design Standards - Roads, Drainage and
stormwater drainage characteristics. Earthworks.
PO4 AO4.1 N/A. Rainwater captured in
Stormwater infrastructure is compatible with existing The location, design and construction of stormwater Bioretention Basin will gradually
infrastructure, allows for easy access for the ongoing drainage structures is in accordance with PSP6 Engineering infiltrate to soil layers and freely
maintenance by Council, is cost effective across its design Design Standards - Roads, drainage and earthworks. discharges subsoil to an outfall to
life.
Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
Page 2 of 12
June 2021
Page 47
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO4.2 N/A. Rainwater captured in
Where infrastructure is located on private land an easement Bioretention Basin will gradually
is dedicated over the infrastructure in accordance with PSP6 infiltrate to soil layers and freely
Engineering Design Standards - Roads, drainage and discharges subsoil to an outfall to
earthworks. Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
AO4.3 N/A. Rainwater captured in
Any alterations or repairs to infrastructure as a result of Bioretention Basin will gradually
the development are made at no cost to Council. infiltrate to soil layers and freely
discharges subsoil to an outfall to
Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
AO4.4 Development will comply.
Development avoids stormwater inflow and infiltration to
the sewer infrastructure network.
AO4.5 N/A. Rainwater captured in
Stormwater infrastructure is designed to minimize Bioretention Basin will gradually
maintenance costs and the requirement for specialized infiltrate to soil layers and freely
equipment for maintenance techniques. discharges subsoil to an outfall to
Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
Page 3 of 12
June 2021
Page 48
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO5 AO5.1 N/A
Stormwater drainage infrastructure is aligned to avoid Stormwater drainage infrastructure avoids crossing
crossing waterways, wetlands, drainage lines and waterways, wetlands drainage lines and ecologically
ecological important areas, or where it is demonstrated this
is unavoidable, disturbed areas are reinstated and
important areas or follows the edge of existing disturbed
revegetated upon completion of works. areas.
AO5.2 N/A
Stormwater drainage infrastructure is co-located with
other infrastructure within a combined utility corridor
where appropriate.
AO5.3 N/A
Temporary vehicular crossings of waterways must be
designed and constructed to be consistent with the
current International Erosion Control Association Best
Practice Book Series.
Stormwater quality and protection of receiving waters AO6.1 Development will comply as
PO6 Stormwater runoff discharging into High Ecological Value Noosa Shire Council interactive
Development is located, designed, constructed and operated waters as a result of development causes no increase in mapping indicates the site is in an
to protect and enhance environmental values and water
gross pollutants, total suspended solids, total phosphorous environmentally significant area.
quality of waterways, wetlands, lakes, ground waters and
drainage systems. or total nitrogen compared to a pre-development scenario. Refer to Stormwater Management
Plan, in specific stormwater
AND quality section prepared by this
Editor’s note: Environmental values of waters and water office.
AO6.2
quality objectives are prescribed in Schedule 1 of the
Environmental Protection (Water) Policy 2009 and are
All stormwater runoff is treated to achieve maximum
identified on the State Planning Policy Interactive Mapping removal of nutrients, gross pollutants and suspended Development will comply, Refer to
System. solids as determined by cost to efficiency ratios. (e.g. Stormwater Management Plan, in
Page 4 of 12
June 2021
Page 49
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
bioretention basins must be sized to achieve at least 80% specific stormwater quality section
reduction in total suspended solids, 60% reduction in total prepared by this office.
phosphorous, 45% reduction in total nitrogen and 90%
reduction in gross pollutants >5mm).
OR
AO6.3
To be complied with at detailed
Developments achieve a minimum 3 drop rating consistent
design / construction stages.
with the Water by Design Living Waterways Scoring Guide
(Healthy Land and Water).
PO7 AO7.1 Development will comply, Refer to
Water quality treatment systems use natural processes and Water quality treatment systems are designed to be
materials, whenever possible, and are integrated into Stormwater Management Plan, in
integrated into the landscape consistent with the technical
development to enhance biodiversity and landscape benefits . specific stormwater quality section
design guideline published by Healthy Land and Water
Water by Design for the feature. (eg. For Bioretention prepared by this office.
Basins: Bioretention Technical Design Guidelines (October
2014) and for Wetland Systems the Wetland Technical
Design Guideline (May 2017).
PO8 AO8.1 N/A water quality treatment
Water quality treatment infrastructure to be dedicated as Detailed life cycle costing is provided for the entire infrastructure will not be dedicated
public assets are proven to be suitable for its use and of a treatment train system including replacement costs of to Council.
cost effective and efficient standard.
asset parts.
AO8.2
Treatment systems dedicated as public assets are designed
to minimize maintenance, renewal and adaption costs and
Page 5 of 12
June 2021
Page 50
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
the requirement for specialized equipment, material or
maintenance techniques
AO8.3
Vegetated stormwater management systems to be
dedicated as public assets are established and maintained
during the maintenance period to ensure optimal
vegetated growth and that the functional elements of the N/A
system achieve the design function at the end of the
maintenance period.
PO9 AO9.1 To be complied with at detailed
Treatment systems are designed to eliminate or minimise Free draining inlets and outlets are provided to ensure that design / construction stages.
health, safety and aesthetic hazards, including risks
associated with insect breeding, odour and public safety.
waters do not pond for more than 24 hours.
AO9.2 To be complied with at detailed
Developments are designed to eliminate retaining walls in design / construction stages.
excess of 0.8m for any water quality treatment device.
Hydrology and waterway stability AO10
Development will comply, Refer to
PO10 The development is designed to: Stormwater Management Plan.
Development prevents increased bed and bank erosion and 1. limit the peak 1 year ARI event discharge
sedimentation in receiving waterways by avoiding changes within the receiving waterway to the pre-
in low rate, peak flow run-off and flow duration.
development peak 1 year discharge;
2. maximise pervious areas by using pervious
alternatives for otherwise impervious areas
wherever possible;
Page 6 of 12
June 2021
Page 51
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
3. provide for capture and reuse of stormwater
for non-potable purposes for gardening, toilet
flushing, laundry and hot water supply uses;
4. incorporate appropriate detention features;
and
5. incorporate natural channel design principles
PO11 AO11.1
N/A. No new channels natural
Water sensitive urban design principles are applied to The design and construction of a natural channel or natural
achieve multifunctional design of waterways, wetlands and channel or natural channel
channel rehabilitation works are in accordance with the
drainage lines that provide for: Natural Channel Design Guidelines (Brisbane City rehabilitation works are proposed.
1. stormwater conveyance that uses natural
channel design;
Council) having regard to local topography, geology, and
2. protection of landscape features and ecological geomorphology.
important areas including terrestrial and aquatic AO11.2 To be complied with at detailed
habitat; Landscape features, plant species and habitat types used design / construction stages.
3. aesthetic and passive recreation values; in stormwater conveyance channels are complementary to
4. flood management and conveyance of external the local context and natural waterways.
catchment stormwater through the AO11.3 To be complied with at detailed
development; Bank and bed stability and planting densities result in a design / construction stages.
5. landscaping that incorporates local native stable channel over the long term and minimal potential
species; and for pest plant species.
6. bed and bank stability. AO11.4
Development Complies, Water
Water Sensitive Design measures are incorporated into the
Sensitive Design measures were
development, as detailed in the document Water Sensitive
Designs small improvements, new ideas, concepts and incorporated in the SBSMP.
Page 7 of 12
June 2021
Page 52
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
sketch designs for stormwater filtration systems (Healthy
Waterways Water by Design).
AO11.5
Development will comply..
Floodplain management is designed in accordance with
the Framework for the Integration of Flood
and Stormwater Management into Open Space published
by Healthy Waterways Water by Design (version current at
the time of development application).
PO12 AO12.1 Development will comply, pre-
Development protects in-stream ecology by maintaining Where run-off from or within the site passes through or development low flows will be
pre-development low flow discharge regimes and drains to natural channels, waterways or wetlands, maintained in accordance with the
maintaining fish passages. development protects in-steam ecology by maintaining
frequent flow management
pre-development low flow discharge regimes in
objectives in PSP6 Engineering
accordance with the frequent flow management objectives
in PSP6 Engineering Design Standards - Roads, drainage Design Standards - Roads,
and earthworks drainage and earthworks
AO12.2 N/A no instream structure are
Instream structures such as roads, bridges, culverts, and proposed within this SBSMP
other stormwater infrastructure do not cause barriers to prepared by this office.
fish passage and facilitate the movement of terrestrial and
aquatic fauna along waterway corridors.
AO12.3 Development will comply.
Benthic substrate retains a continuous grade with the
direction of flow consistent with the natural bed profile.
Page 8 of 12
June 2021
Page 53
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO13 AO13.1 To be complied with at detailed
Development is designed and constructed to maintain The location and form of stormwater discharge points do design / construction stages.
surface and ground water balances that sustain the not alter the pre-development hydrology of receiving
environmental values of water dependent ecosystems, surface water or groundwater.
including downstream aquatic, riparian, wetland and
terrestrial ecosystems. AO13.2 N/A Development is not located
Developments located on groundwater recharge or located on groundwater recharge
discharge areas are designed and managed in accordance or discharge areas.
with a groundwater recharge and discharge management
plan prepared by a suitably experienced and qualified
groundwater hydrologist. The groundwater recharge or
discharge must demonstrate that the development does
not affect groundwater balances beyond the property
boundaries.
Construction and establishment of stormwater AO14.1 To be complied with at detailed
management systems An erosion and sediment control plan prepared in design / construction stages.
PO14 accordance with the International Erosion Control
Construction methods provide for appropriate controls to Association Best Practice Books demonstrates that the
avoid entry and transport of litter, sediment, and capture and release of stormwater achieves the design
associated prescribed water contaminants into receiving objectives listed in Table A: Construction phase –
waters. stormwater management design objectives of the State
Planning Policy (Appendix 2).
AO14.2 To be complied with at detailed
Construction works are designed and managed to restrict design / construction stages.
the extent of clearing and soil exposure to the minimum
Page 9 of 12
June 2021
Page 54
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
necessary for access, and safe construction at any one
time.
AO14.3 To be complied with at detailed
For buildings: design / construction stages.
1. upstream runoff is diverted around
the construction site;
2. sediment barriers are provided
downslope of disturbed areas to
prevent sediment washing into
gutters, drains and waterways ,
wetlands or drainage lines either on
or off the site; and
3. temporary or permanent downpipes
are connected to the stormwater
system before laying the roof; or
4. Localized erosion is avoided by
directing flow from downpipes over
non-erosive areas.
AO14.4 To be complied with at detailed
Chemical flocculants used as part of an erosion and design / construction stages.
sediment control plan do not harm the environmental
values within receiving waters.
AO14.5 To be complied with at detailed
design / construction stages.
Page 10 of 12
June 2021
Page 55
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Appropriately sized litter containment areas, with
provision for sorting recyclables are provided for the type
of litter expected to be generated onsite.
AO15 N/A
Wastewater management and effluent disposal Wastewater (non-sewage) generated from the
PO15
development is collected and contained on-site, and is:
Development does not discharge wastewater unless it
can be demonstrated to not compromise environmental
1. lawfully disposed to sewer; or
values of waters and water quality objectives
2. transferred off-site for treatment/disposal to
an appropriately licenced facility;
3. reused on-site in a closed-cycle irrigation
scheme, industrial processes, washing or
cleaning or other purpose; or
4. treated to meet the drinking water supply
environmental values prior to release.
PO16 AO16 N/A
On-site effluent treatment and disposal systems are An onsite effluent system and disposal area is:
designed, constructed and managed to not compromise
the environmental values of waters and water quality 1. not located on a slope greater than 1 in
objectives. (10%);
2. not located at or below the 1% annual
exceedance probability (AEP flood event);
3. not located within a riparian buffer
area mapped on a Biodiversity, Waterways
and Wetlands Overlay Map; and
Page 11 of 12
June 2021
Page 56
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
4. setback 400 metres minimum from the full
supply level of Lake Macdonald.
Page 12 of 12
June 2021
Page 57
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Floodplain protection, immunity and safety - for AO1
development areas The finished flood level is not less than the minimum Development will comply
PO1 design levels specified in Table 8.2.6.4
Development provides that for all flood events up to and
including the DFE:
1. the safety of people on the site is protected; and
2. the risk of damage to property on the site is avoided
or minimised as far as practicable.
PO2 AO2 Development will comply
All lots have sufficient area that is above the DFE flood level The minimum area above flood level (flood free area) for
or where modelling is not available, the highest each lot, is in accordance with Table 8.2.6.5.
recorded flood level, to safely and adequately accommodate
the intended use.
Page 1 of 9
June 2021
Page 58
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO3 AO3
For reconfiguring a lot or operational works, development is Development areas are not filled to reduce flood risk. Development will comply
undertaken in a manner that ensures:
1. natural hydrological systems are protected from
erosion, scour or flood damage on the premises
or other premises;
2. natural landforms and drainage lines are
maintained to protect the hydraulic performance
of waterways and flood plain; and
3. development integrates with the natural
landform rather than modifying the landform to
suit the development as far as practicable.
PO4 AO4.1 N/A
For reconfiguring a lot, development does not compromise Development provides an effective evacuation route that
the safety of people resulting from the flood risk associated remains passable, with sufficient flood warning time, to
with events exceeding the DFE. enable people to progressively evacuate to safe areas
above the PMF in the face of advancing flood or waters for
events that exceed the DFE.
OR
AO4.2 N/A
Development provides for an area of sufficient size and
dimensions on site above the PMF that allows for safe
congregation and refuge.
Page 2 of 9
June 2021
Page 59
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO4.3 N/A
Where the existing roads servicing a development
provide a specific flood immunity (as determined by
the Qld Transport Road and Drainage Design Manual,
Queensland Urban Drainage Manual and the
Australian Rainfall and Runoff Guide), all lots
have access to the flood free area identified in Table
8.2.6.5 that matches the road immunity.
Page 3 of 9
June 2021
Page 60
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO5 AO5 Development will comply
For reconfiguring a lot or operational works, development In the Flood Hazard Overlay, or in areas otherwise
does not directly, indirectly or cumulatively alter the flood determined to be subject to the DFE or DSTE,
characteristics external to the development site for all development ensures:
flooding and inundation events up to and including 1. there is no loss of on-site flood storage
the DFE or DSTE based on:
capacity;
1. current climate conditions; and 2. all changes to level, depth, duration and
2. incorporating an appropriate allowance for the velocity of floodwaters are contained
predicted impacts of climate change. within the site for all flood events up to
and including the DFE based on current
climate and predicted impacts of climate
change at 2100;
3. there is no acceleration or retardation of
flows, or any retardation in flood warning
times, elsewhere on the floodplain and to
any overland flow paths; and
4. there is no increased stormwater ponding
on sites upstream, downstream or in the
general vicinity of the site.
Resilient building design and form AO6.1 Development will comply
PO6 Buildings are designed to integrate well with the street
Development ensures that building design and building form: level and the levels of adjoining properties to facilitate
1. accounts for potential flood risk; pedestrian flows and visual and physical connectivity
2. is resilient to flood events; and between the footpath and ground floors.
Page 4 of 9
June 2021
Page 61
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
3. maintains a functional and attractive street AO6.2 N/A.No under-storey proposed.
address appropriate to the intended use. Buildings incorporate appropriate screening to ensure
that any under-storey is not visible from the street,
where such screening does not impede flood water
flows.
AO6.3 Development will comply
Residential buildings minimise risk from flooding by
providing parking and other low intensive, non-
habitable uses at ground level, rather than habitable
uses.
AO6.4 Development will comply
Non-residential buildings and structures are oriented
to the street by activating the street frontage with
appropriate uses and urban design treatments such
as recessed wall treatments, screening or
landscaping, whilst allowing for flow through of flood
waters on the ground floor.
AO6.5 N/A. No basement or underground
Basements and underground car parking areas are parking areas are proposed.
designed to drain and function safely during a flood
event and power failure.
PO7 AO7.1 To be complied with at detailed
Water quality treatment systems use natural processes and Water quality treatment systems are designed to be
materials, whenever possible, and are integrated into design / construction stages.
integrated into the landscape consistent with the
development to enhance biodiversity and landscape benefits . technical design guideline published by Healthy Land
and Water Water by Design for the feature. (eg. For
Bioretention Basins: Bioretention Technical Design
Page 5 of 9
June 2021
Page 62
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Guidelines (October 2014) and for Wetland Systems
the Wetland Technical Design Guideline (May 2017).
Essential network infrastructure AO8 To be complied with at detailed
PO8 Essential network infrastructure that is likely to fail to design / construction stages.
Essential network infrastructure maintains effective function or may result in contamination when
function during and immediately after flood and storm tide inundated by flood water (e.g. water supply pipeline
inundation events. air valves and the like) is located above the DFE level
(or where the DFE has not been modelled for the
area, above the highest recorded flood level for the
area).
Essential community infrastructure AO9.1 N/A
PO9 Essential community infrastructure is sited and
Essential community infrastructure is able to function constructed to ensure that flood levels comply with
effectively during and immediately after flood events. flood immunity requirements specified in Table
8.2.6.4.
Page 6 of 9
June 2021
Page 63
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO9.2
Essential community infrastructure which is located
below the specified flood immunity requirements:
N/A
1. is designed and constructed to function
effectively during and immediately after
the recommended flood level event;
and
2. has direct access to low hazard
evacuation routes or an emergency
rescue area above the PMF, if it is
for emergency services (including
emergency shelters, police facilities,
hospitals and associated facilities).
Page 7 of 9
June 2021
Page 64
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
Earthworks AO10 To be complied with at detailed design /
PO10 Filling, other than accessways: construction stages.
Excavation and filling for operational works only occur where
they: 1. does not extend more than the equivalent of 3
metres around the main building, measured
1. result in the protection, rehabilitation and repair from the outer walls of the building;
of ecologically important areas, watercourses, 2. is limited to a maximum of 500m2 and
drainage lines and wetlands; 3. does not impact on the local drainage of
2. do not adversely impact on the overall adjoining properties.
hydrology, hydraulics and flood capacity of
a waterway;
3. do not directly, indirectly or cumulatively cause
adverse impacts external to the site;
4. do not cause increased flooding, which
adversely affects the safety or use of any land
upstream or downstream;
5. do not cause ponding of water on the site or
nearby land;
6. do not result in a reduction in flood storage
capacity;
7. do not adversely affect the flow of water in any
overland flow path; and
8. do not adversely affect the privacy or visual
amenity of surrounding property.
Page 8 of 9
June 2021
Page 65
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Hazardous materials AO11.1 To be complied with at detailed
PO11 Materials manufactured or stored on site are not
Development ensures that public safety and the design / construction stages.
hazardous or noxious, or do not comprise materials that
environment are not adversely affected by avoiding the may cause a detrimental effect on the environment if
release of hazardous materials into flood waters and the discharged in a flood event.
environment.
OR
AO11.2 N/A no essential community
If a DFE is adopted, structures used for the manufacture or infrastructure is proposed as part
storage of hazardous material are located above of the development.
the DFE level.
Page 9 of 9
June 2021
Page 66
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
Appendix F
NSC Erosion Hazard Assessment
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 67
SCHEDULE 2—EROSION AND SEDIMENT CONTROL
Proposed Amendments August 2015
ASSESSMENT
The Noosa Plan
1. Preamble
Erosion and sediment control on building sites
Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.
Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses. A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.
Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses.
Effective on-site erosion and sediment control provides the following benefits—
A better looking, more marketable site;
Improved wet weather working conditions;
Reduced stockpile losses;
Less mud and dust problems;
Reduced clean-up costs;
Fewer public complaints;
Better public image;
Cleaner watercourses; and
Better fishing and swimming in our nearby watercourses.
2. Erosion Hazard Assessment Form
Controlling Factors Points Score Checking
Predominant slope1 of the whole site, prior to
building works:
0 - 3% slope 0
>3% - 5% slope 1
>5% - 10% slope 2 2
>10% - 15% slope 4
> 15% slope 5
Soil type: (see 1 below)
Sandy soil/gravel 0
Sandy loam 1 2
1
The term ‘predominant slope’ is defined in Part 2 Section 2.12.
S2.1
Page 68
Controlling Factors Points Score Checking
Clay loam 2
Proposed Amendments August 2015
The Noosa Plan
Clay soil 2
Anticipated duration of site disturbance: (see 2 below)
Duration < 2 weeks 0
2 weeks Duration < 3 months 2 0
3 months Duration < 6 months 4
Duration > 6 months 5
Month that works are undertaken: (see 3 below)
August, September 0
April, May, June, July, November, October 1 1
March December 2
January February 3
Offsite sediment control (i.e. down slope of the soil
disturbance):
Score 1 point if there is no purpose built, operational 1
and well maintained sediment traps (eg. sediment 1
basin, gross pollutant trap or purpose built wetland)
to catch sediment before it enters a water body with
environmental values (eg. creek, natural wetland,
river or bay) (see 4 below)
Run-off entering the site:
Score 1 point if stormwater run off entering the site is 1 0
not diverted away from the soil disturbance
Extent of site disturbance:
Score 2 points if building work requires reshaping of
the ground surface (eg. ‘cut and fill’ works) (see 5 2
below) 2
Score 5 points if the area to be disturbed is greater 5
than 600m²
Works within environmentally sensitive areas:
Score 11 points if the disturbance is within the banks
of a watercourse (see 6 below) 11
Score 5 points if the disturbance is within 50m of the 2
top of bank of a watercourse 5
Score 2 points if the disturbance is between 50m
and 100m of the top of bank of a watercourse 2
TOTAL SCORE (See 7 & 8 below) 10 LOW
Notes:
1. Where there is more than one type of soil on the site, select the category with the highest point value.
2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will
be fully stabilised (eg. grassing).
3. If this time span covers more than one category, select the category with the highest point value.
Note that if there is no grass/vegetation cover on the site before building work has started, the time
span starts from the time this form is completed.
4. If you are not sure, score 1 point.
5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining
wall above and/or below the building slab, greater than 1 metre in height. If the building slab has
already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points.
6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or
intermittently.
7. For a high risk site, the total score is 14 points.
8. For a low risk site, the total score is < 14 points.
S2.2
Page 69
Proposed Amendments August 2015
3. Erosion and Sediment Control Methods
The Noosa Plan
Element Solution
Minimise disturbance when excavating Retain as much grassed area as possible on the
site.
These areas not only improve the appearance
of the site they also filter much of the sediment
from stormwater run-off before it reaches the
drainage system.
Catch drains and perimeter banks Allow for diversion of up slope stormwater
around the work site and other disturbed
surfaces.
Install a sediment barrier Install sediment barriers down slope of the
building site to filter coarse sediment before it
can wash into gutters, drains and watercourses.
Purpose designed geotextile sediment
fabric (i.e. not shadecloth) attached to posts
with the geotextile buried in an upstream
trench; or
Place turf of a minimum 600mm width along
kerb line; or
Straw bales, staked in a 100mm (min) deep
trench.
Single gravelled entry-exit Restrict vehicle access to one entry-exit point.
Gravelling the access point will allow all
weather access, will reduce the amount of
soil carried off the site by vehicles, and will
provide a permanent base for the driveway.
Early stormwater drainage connection Connect a temporary or permanent downpipe/s
to the stormwater system before laying the roof
or slow and spread the flow from downpipe/s to
avoid localised erosion. Downpipe/s may be
temporarily removed during wall construction.
All stormwater must discharge in a manner that
does not cause soil erosion.
Concrete waste and washing Waste concrete and household paint must not
be allowed to wash into the gutters or the street.
Sand and soil stockpiles Stockpiles must be placed wholly on the
construction site and behind a sediment barrier.
S2.3
Page 70
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
Appendix G
Noosa Shire Council (Interactive Mapping)
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 71
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 72
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 73
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 74
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 75
10} r168CP8495 16) 0 148MCH4796 0 167CP849516 ~ & G latels (S62 Road Labels = Major 2 ga Intermediate e | —— S7REII0234 Property Label 620 SO . — aN pe PlaceNames 9 “4 ‘85RP94023) 5 Fs 28% D poi PS. pes 84RP94023 a Foy FOOpegso1 RP94023} 42 2s Y55'00) 1928) ie fie Peest A BY he ef 81 RP94023) isis 29 Ieee 3 eB i80RP94023) = 57RP94023) 24) 3} ‘ 27 "i 9RP94023) Se 78RP94023) 1 IS8RP940: Q Ai 10: “ la = 20 05 M103RP94023) Oe q oS) pace) 105RP94023) F oh 109RP94023) Bian 146RP94023) Py v3. ae “yg87RP94023) : rr abcae cS S “a ‘ 2H 50, 7RP94023 ‘ a Se OY, dopoeans 7, 4 ats = 93RP94023) z a SF iy 20s ee Py i \ Bo ea reo i94RP94023 me ag arias a boS!00) 3. S Ope | ot . S 2235 4 De "A118RP94023) u137RR94023 FS 16 vay Site 24) peeecanrs “145RP94023 ms nH M'56RP94023¢_ fo) _ ASSRP94023 M47RP94023) 74 6 y 1 54RP94023} g Fire Management g Brigade Areas 3) Rural Brigade Areas (DCS) E29) Urban Brigade Areas (DCS) BQA D AV FireBreaks Trails ME Bushfire Hazard Area (Bushfire Prone Area) Gm Very High Potential Bushfire Intensity HB High Potential Bushfire Intensity ME Medium Potential Bushfire Intensity Potential Impact Buffer & Contours Az Contour Labels /\/ Contours (1m) g Transport and Facilities Emergency Services Facilities Evacuation Centres /V/ Minor QB Beach Access On-Road Bike Routes BAZ /V/ Cycle bus lane SV Cycle lane Cycle parking lane Green treatment /V/ Greenlink /\V/ Intersection /V/ Intersection signalised /V/ Mixed traffic street /\/ Roundabout /V/ Sealed shoulder Shared zone ,>, Other Noosa Trail Trail 1 Trail 2 AN Trait3 f\¢ Trail 4 JN ¢ Trail 5 AN Trail Trail 7 Trail 8 SV/ Pathways Oe Railway Water Skiing Areas Permitted Prohibited @ On-Water Navigation Aids 21/04/2022 Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying OOSA COUNCIL upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability whatsoever for any errors, faults, defects or omissions in the information. 1:2257
Page 76
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:2257
Page 77
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 78
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
Appendix H
MUSIC Modelling Information
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 79
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
MUSIC Model Information
Introduction:
The quality of stormwater runoff and the impact of the proposed stormwater quality improvement measures
were analyzed using MUSIC Version 6.3.0 according to the MUSIC Modeling Guidelines Version 1.0, Water
by Design 2010. The source nodes in the model are split into two types and a summary of the area breakdown
is presented below:
Meteorological Data:
The MUSIC model was carried out using the following parameters:
- Modeling period should be 10 years with a time step of 6 minutes
- The nearest available 6 minute time step rainfall series to the subject site is Cooroy (Rainfall Station ID
040059), with a mean annual rainfall of 1595 mm, and data from: 1/1/1973 to 31/12/1983. Evaporation was
applied as monthly mean. The mean annual evaporation was 1201 mm.
Source Nodes, Fractions Impervious:
The areas of the source nodes were estimated from the Post Development Stormwater Catchment Plan as
shown in Appendix C.
Source Nodes - Pollutant Exports:
Rainfall runoff and pollutant export parameters were assigned per Tables 3.7 and 3.8 of the Water by Design
MUSIC Modeling Guidelines Version 1.0 (2010).
The rainfall runoff and pollutant export parameters for an Urban development were adopted.
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 80
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R002 (04.07.22)
July 2022
Treatment Train for Proposed Development:
Results for Proposed Development
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Page 81
RACV Noosa Resort – Proposed Eco Resort Extension
Ref: 22366 C R001 Rev 02 15.06.22.docx
June 2022
Brisbane Sydney
584 Milton Road, Cnr Sylvan Road 13 / 20 Berry Street,
Toowong, QLD 4066 North Sydney NSW 4006
PO Box 1492 Phone: +61 02 8908 5400
Toowong BC, QLD 4066 Email: [email protected]
Phone: +61 07 3300 8800
Email: [email protected]
Melbourne Gold Coast
Suite 309, 838 Collins Street, Suite 201, Level 1, 1 Short Street
Docklands VIC 3008 Southport, QLD 4215
Phone: +61 03 9269 6300 PO Box 208
Email: [email protected] Southport, QLD 4215
Phone: +61 07 5552 4700
Email: [email protected]
Sunshine Coast Toowoomba
Level 3, 2 Emporio Place Tenancy 8, 158 Margaret Street
Maroochydore, QLD 4558 Toowoomba QLD 4350, Australia
PO Box 5014 Phone: +61 07 3300 8800
Maroochydore BC, QLD 4558 Email: [email protected]
Phone: +61 07 5444 0400
Email: [email protected]
Darwin Perth
Tenancy 3, Lvl 1, 5 Edmunds St, Level 3, Suite 15, 23 Railway Road,
Darwin NT 0800 Subiaco, WA 6008
GPO Box 2422 PO Box 443
Darwin, NT 0801 Subiaco, WA 6904
Phone: +61 08 8944 6300 Phone: +61 08 9217 0900
Email: [email protected] Email: [email protected]
`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH
Used in these records
About this file
- File size
- 34.8 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.