Council archive · source document
Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (34.8 MB): may take a few minutes to open.
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Contents
EXECUTIVE SUMMARY 5
1 INTRODUCTION 6
1.1 Background 6
1.2 Background Information 6
1.3 Property Detail 6
2 EXISTING SITE 7
2.1 Existing Site Features 7
3 FLOODING 8
3.1 Flooding Considerations 8
4 STORMWATER INFRASTRUCTURE 9
4.1 Existing Infrastructure 9
4.2 Lawful Point of Discharge (LPD) 10
4.2.1 Existing LPD 10
4.2.2 Proposed LPD 10
4.3 External Catchment 10
5 STORMWATER QUANTITY ASSESSMENT 10
5.1 Proposed Development and Associated Issues 10
6 STORMWATER QUALITY ASSESSMENT 11
6.1 Treatment Objectives 11
6.2 Site Analysis and Design Strategy 12
6.2.1 Pre-Development Phase 12
6.2.2 Bulk Earthworks Phase 12
6.2.3 Construction Phase 13
6.2.4 Maintenance 13
6.3 Operational Phase Treatment 13
6.4 Stormwater Quality Improvement Devices (SQIDs) 13
6.4.1 First Flush Device 14
6.4.2 Bioretention Basin 14
6.5 Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank 14
6.5.1 Internal Demand 14
6.6 MUSIC Model 15
6.7 On-site Treatment Lifecycle Costs 15
6.8 Water Quality Monitoring 16
6.9 Maintenance 16
7 CONCLUSION 17
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Site Based Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 34.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.