Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (34.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                             RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                                    22366 C R10 R003 (04.07.22)

                                                                                                      July 2022


Contents
EXECUTIVE SUMMARY                                                                                            5
1     INTRODUCTION                                                                                           6
      1.1   Background                                                                                       6
      1.2   Background Information                                                                           6
      1.3   Property Detail                                                                                  6
2     EXISTING SITE                                                                                          7
      2.1   Existing Site Features                                                                           7
3     FLOODING                                                                                               8
      3.1   Flooding Considerations                                                                          8
4     STORMWATER INFRASTRUCTURE                                                                              9
      4.1   Existing Infrastructure                                                                          9
      4.2   Lawful Point of Discharge (LPD)                                                                 10
            4.2.1    Existing LPD                                                                           10
            4.2.2    Proposed LPD                                                                           10
      4.3   External Catchment                                                                              10
5     STORMWATER QUANTITY ASSESSMENT                                                                        10
      5.1   Proposed Development and Associated Issues                                                      10
6     STORMWATER QUALITY ASSESSMENT                                                                         11
      6.1   Treatment Objectives                                                                            11
      6.2   Site Analysis and Design Strategy                                                               12
            6.2.1    Pre-Development Phase                                                                  12
            6.2.2    Bulk Earthworks Phase                                                                  12
            6.2.3    Construction Phase                                                                     13
            6.2.4    Maintenance                                                                            13
      6.3   Operational Phase Treatment                                                                     13
      6.4   Stormwater Quality Improvement Devices (SQIDs)                                                  13
            6.4.1    First Flush Device                                                                     14
            6.4.2    Bioretention Basin                                                                     14
      6.5   Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank                                   14
            6.5.1    Internal Demand                                                                        14
      6.6   MUSIC Model                                                                                     15
      6.7   On-site Treatment Lifecycle Costs                                                               15
      6.8   Water Quality Monitoring                                                                        16
      6.9   Maintenance                                                                                     16
7     CONCLUSION                                                                                            17


BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                            Page 3

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.