Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (34.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                 RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                                        22366 C R10 R003 (04.07.22)

                                                                                                          July 2022


         EXECUTIVE SUMMARY
         ADG Engineers (Aust.) Pty Ltd has been engaged by Aspect Architects to prepare a Site Based
         Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) as
         additional information in support of a Development Application for a Material Change of Use for a
         proposed Eco Resort Extension to the current RACV Noosa Resort located at 94-142 Noosa Drive,
         Noosa Heads QLD 4567.

         The proposed development as shown in Aspect Architects plans is for eight (8) double storey eco
         resort style units, raised boardwalk footpath links and associated carparking. The proposed
         application to Council also includes works involving converting an existing pond internal to the RACV
         Noosa Resort site into a new pool. ADG make note that this existing pond does not form part of an
         existing site-based stormwater treatment train nor provides further stormwater detention
         management. The pool works is to form part of separate application submitted to Council for building
         approval.

         The report comprises of stormwater quantity and quality assessments. The quantity assessment is
         undertaken to confirm a ‘non-worsening’ of peak flow discharges from the site and the quality
         assessment is undertaken to determine the required stormwater treatment measures to be
         implemented on site.

         The stormwater quantity objective was to demonstrate that there are no impacts from storm events
         up to and including the Q100 storm event. The purpose is to ensure that the existing infrastructure
         and/or downstream properties are not adversely affected. Due to negligible increase in peak flows
         downstream of the subject site, it is considered unnecessary to include provision for stormwater
         quantity management as the proposed site runoff is immediately discharged to Weyba Creek. This
         is beneficial during any storm event, as the short time of concentration will allow the runoff from the
         site to be quickly dissipated from the area before the onset of the peak Weyba Creek flow and
         corresponding tidal effects (stacked hyetograph effect).

         Currently no quality stormwater management measures are in place for the Eco Village subject site.
         Stormwater treatment measures are to be implemented on site in accordance with Industry Best
         Practice, WSUD Engineering Guidelines and, Council’s Land Development Guidelines to provide
         stormwater treatment for this site. ADG recommends the use of the following devices to meet the
         water quality objectives identified within the SPP 2017 and Council’s WSUD Planning Scheme
         Policies:

            Combined 40kL Rainwater Tank (Reuse)

            30m2 surface area Bioretention Basin

            First flush device/s to divert initial flows (first 12mm of rainfall or hose-down) to vegetated areas

         All relevant standards and guidelines are addressed in this Stormwater Management Plan including
         criteria from the Noosa Shire Council Planning Scheme Policies, Queensland Urban Drainage
         Manual (QUDM) 2016, State Planning Policy (SPP) 2017 Plumbing and Drainage Code AS3500.3
         and Australian Rainfall and Runoff Guideline (ARR).




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                                Page 5

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.