RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
EXECUTIVE SUMMARY
ADG Engineers (Aust.) Pty Ltd has been engaged by Aspect Architects to prepare a Site Based
Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) as
additional information in support of a Development Application for a Material Change of Use for a
proposed Eco Resort Extension to the current RACV Noosa Resort located at 94-142 Noosa Drive,
Noosa Heads QLD 4567.
The proposed development as shown in Aspect Architects plans is for eight (8) double storey eco
resort style units, raised boardwalk footpath links and associated carparking. The proposed
application to Council also includes works involving converting an existing pond internal to the RACV
Noosa Resort site into a new pool. ADG make note that this existing pond does not form part of an
existing site-based stormwater treatment train nor provides further stormwater detention
management. The pool works is to form part of separate application submitted to Council for building
approval.
The report comprises of stormwater quantity and quality assessments. The quantity assessment is
undertaken to confirm a ‘non-worsening’ of peak flow discharges from the site and the quality
assessment is undertaken to determine the required stormwater treatment measures to be
implemented on site.
The stormwater quantity objective was to demonstrate that there are no impacts from storm events
up to and including the Q100 storm event. The purpose is to ensure that the existing infrastructure
and/or downstream properties are not adversely affected. Due to negligible increase in peak flows
downstream of the subject site, it is considered unnecessary to include provision for stormwater
quantity management as the proposed site runoff is immediately discharged to Weyba Creek. This
is beneficial during any storm event, as the short time of concentration will allow the runoff from the
site to be quickly dissipated from the area before the onset of the peak Weyba Creek flow and
corresponding tidal effects (stacked hyetograph effect).
Currently no quality stormwater management measures are in place for the Eco Village subject site.
Stormwater treatment measures are to be implemented on site in accordance with Industry Best
Practice, WSUD Engineering Guidelines and, Council’s Land Development Guidelines to provide
stormwater treatment for this site. ADG recommends the use of the following devices to meet the
water quality objectives identified within the SPP 2017 and Council’s WSUD Planning Scheme
Policies:
Combined 40kL Rainwater Tank (Reuse)
30m2 surface area Bioretention Basin
First flush device/s to divert initial flows (first 12mm of rainfall or hose-down) to vegetated areas
All relevant standards and guidelines are addressed in this Stormwater Management Plan including
criteria from the Noosa Shire Council Planning Scheme Policies, Queensland Urban Drainage
Manual (QUDM) 2016, State Planning Policy (SPP) 2017 Plumbing and Drainage Code AS3500.3
and Australian Rainfall and Runoff Guideline (ARR).
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Site Based Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 34.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.