Skip to the record
The only place to find full transcripts.

Council archive · source document

Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (34.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                       COMMENTS
 PO13                                                       AO13.1                                                    To be complied with at detailed
 Development is designed and constructed to maintain        The location and form of stormwater discharge points do   design / construction stages.
 surface and ground water balances that sustain the         not alter the pre-development hydrology of receiving
 environmental values of water dependent ecosystems,        surface water or groundwater.
 including downstream aquatic, riparian, wetland and
 terrestrial ecosystems.                                    AO13.2                                                     N/A Development is not located
                                                            Developments located on groundwater recharge or            located on groundwater recharge
                                                            discharge areas are designed and managed in accordance     or discharge areas.
                                                            with a groundwater recharge and discharge management
                                                            plan prepared by a suitably experienced and qualified
                                                            groundwater hydrologist. The groundwater recharge or
                                                            discharge must demonstrate that the development does
                                                            not affect groundwater balances beyond the property
                                                            boundaries.
 Construction and establishment of stormwater               AO14.1                                                    To be complied with at detailed
 management systems                                         An erosion and sediment control plan prepared in          design / construction stages.
 PO14                                                       accordance with the International Erosion Control
 Construction methods provide for appropriate controls to   Association Best Practice Books demonstrates that the
 avoid entry and transport of litter, sediment, and         capture and release of stormwater achieves the design
 associated prescribed water contaminants into receiving    objectives listed in Table A: Construction phase –
 waters.                                                    stormwater management design objectives of the State
                                                            Planning Policy (Appendix 2).

                                                            AO14.2                                                    To be complied with at detailed
                                                            Construction works are designed and managed to restrict   design / construction stages.
                                                            the extent of clearing and soil exposure to the minimum




Page 9 of 12
June 2021

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.