        SCHEDULE 2—EROSION AND SEDIMENT CONTROL




                                                                                                                   Proposed Amendments August 2015
                     ASSESSMENT




                                                                                                  The Noosa Plan
1.            Preamble

Erosion and sediment control on building sites

Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.

Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses. A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.

Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses.

Effective on-site erosion and sediment control provides the following benefits—


      A better looking, more marketable site;
      Improved wet weather working conditions;
      Reduced stockpile losses;
      Less mud and dust problems;
      Reduced clean-up costs;
      Fewer public complaints;
      Better public image;
      Cleaner watercourses; and
      Better fishing and swimming in our nearby watercourses.

2.            Erosion Hazard Assessment Form
Controlling Factors                                                   Points   Score   Checking
Predominant slope1 of the whole site, prior to
building works:
 0 - 3% slope                                                           0
 >3% - 5% slope                                                         1
 >5% - 10% slope                                                        2        2
 >10% - 15% slope                                                       4
 > 15% slope                                                            5
Soil type: (see 1 below)
 Sandy soil/gravel                                                      0
 Sandy loam                                                             1        2
1
    The term ‘predominant slope’ is defined in Part 2 Section 2.12.



                                                              S2.1

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.