Skip to the record
For the highest quality transcripts.

Council archive · source document

Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (34.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                               RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                                      22366 C R10 R002 (04.07.22)

                                                                                                        July 2022




MUSIC Model Information

Introduction:

The quality of stormwater runoff and the impact of the proposed stormwater quality improvement measures
were analyzed using MUSIC Version 6.3.0 according to the MUSIC Modeling Guidelines Version 1.0, Water
by Design 2010. The source nodes in the model are split into two types and a summary of the area breakdown
is presented below:

Meteorological Data:

The MUSIC model was carried out using the following parameters:

- Modeling period should be 10 years with a time step of 6 minutes

- The nearest available 6 minute time step rainfall series to the subject site is Cooroy (Rainfall Station ID
040059), with a mean annual rainfall of 1595 mm, and data from: 1/1/1973 to 31/12/1983. Evaporation was
applied as monthly mean. The mean annual evaporation was 1201 mm.




Source Nodes, Fractions Impervious:

The areas of the source nodes were estimated from the Post Development Stormwater Catchment Plan as
shown in Appendix C.

Source Nodes - Pollutant Exports:

Rainfall runoff and pollutant export parameters were assigned per Tables 3.7 and 3.8 of the Water by Design
MUSIC Modeling Guidelines Version 1.0 (2010).

The rainfall runoff and pollutant export parameters for an Urban development were adopted.




`BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.