h. Repair and replacements of damaged landscape infrastructure (furniture and fixtures).
Off Maintenance
61. Prior to requesting an Off Maintenance inspection the following must be provided:
a. Written request of bond release.
62. Off Maintenance Inspection must be requested:
a. By contacting Council. *
b. Only after lodgement of a completed Landscape Checklist and all other required
certification and documentation.
c. Only after all works are confirmed in good order including:
i. Remulching, fertilising and aeration of garden areas.
ii. Replacement of plant material.
iii. Removal of plant material impeding regulation sightlines.
*(Refer to Advisory Note)
PRIOR TO THE COUNCIL SIGNING THE PLAN OF SURVEY
Certification
63. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
64. A condition report of the drainage system and end-of-line bioretention basin must be
completed for agreement prior to the acceptance of “On Maintenance”. The condition report
is to include:
a. a CCTV inspection of the existing stormwater network commencing from the end-of-
line bioretention basin in Ely Street and continuing to “FI2/4” (as identified on the
Approved Plans); and
b. a dilapidation report of the existing end-of-line bioretention basin in Ely St.
As Constructed Plans and ADAC XML Files (Council)
65. Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
“As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
information shall include:
a. As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing
file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the
accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
b. ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
prepared in accordance with industry standards and recorded in “MGA - UTM56 /
GDA94” projection.
Please Note: Further information and advice relating to the as-constructed drawing
presentation, as-constructed survey capture and associated guidelines for preparation
of a compliant ADAC XML digital file are available on the webpage titled “As-
Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
Development / Development Tools & Guidelines / As-Constructed Guidelines.
c. The “As-Constructed” drawings will require certification by a:
i. Qualified experienced Civil Engineer (RPEQ) confirming design intent and
conformance with applicable standards and specifications, along with the
relevant descriptions of assets, services and structures and;
ii. Registered Cadastral Surveyor (Qld) in regard to the cadastral and locational
information, levels and applicable survey datum.
Page 36 of 39
Document Set ID: 23843933
Version: 14, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.