RECONFIGURING A LOT (RAL24/0021) (1 LOT INTO 15 LOTS) When Conditions Must Be Complied With 1. Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to the lodgement of a Plan Seal application. Currency Period 2. This development approval lapses if the requirements of the conditions have not been completed and an application for plan seal is not lodged with Council by 4 September 2029 unless an application to extend the currency period is approved by Council. Approved Plans 3. Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed in the table/s below. Plan No. Rev. Plan/Document Name Date DA1.05 E Lot Plan prepared by Blackwood 1/05/2025 Architecture & Design 4. All lot numbering on the subdivision plan to be submitted to Council for compliance assessment must remain as shown on the Approved Plans. Boundary Encroachments 5. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which certifies that: a. all constructed access and roadworks (including associated fill batters and retaining walls) are fully contained within a dedicated reserve or registered easement. b. all utility services and connections (eg. electricity, telecommunications, water, sewerage) are wholly located within the lot they serve or alternatively included within an easement. c. all dams (including ponded water, dam walls and associated spillway structures) are wholly located within the boundaries of a single lot. d. all retaining walls and structures are fully contained within the lot they retain unless otherwise required by condition. e. any fill, including fill batters, are wholly contained within the subject site and not on adjacent properties. f. for the community title scheme, the road pavement changes required by this Decision Notice accurately demarcate the boundaries of the public and private land. Water & Sewer Connections 6. An underground connection to reticulated water and sewerage must be provided to each Multiple Dwelling in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to each Multiple Dwelling. Services 7. Underground reticulated electricity and telecommunication services must be provided to each lot in accordance with an approval for Operational Works and the standards and requirements of the relevant service provider. Page 38 of 39 Document Set ID: 23843933 Version: 14, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.