Request for Further Information - 010.2008.00002078.001 [As Published] · 132008.2078

of 3

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                       Officer:               Glen Conforti
                                                       Direct Telephone:      5449 5379
                                                       Response Address:      PO Box 141, Tewantin QLD 4565
                                                       Email:                 [email protected]
                                                       Our Reference:         2008/2078
                                                       Your Reference:
13 January 2009

Good Building Design
PO Box 704
CALOUNDRA QLD 4551




Dear Sir

                                        Information Request
                                       Integrated Planning Act 1997

I refer to your application and wish to advise that we require further information to satisfactorily
assess the proposal. Please provide 2 copies of all information to be supplied, including an A3 set of
plans and a CD copy.

1      APPLICATION DETAILS

 Application No:                         2008/2078

 Proposal:                               08/2078 Detached House
 Street address:                         4 Piper Street PEREGIAN BEACH
 Real property description:              LOT: 407 P: 93116
 Planning Scheme:                        Noosa Plan
2      INFORMATION REQUIRED

The information requested is set out below:
1.     The Coastal Protection Area Overlay Code requires a 6m setback to the seaward boundary.
       Please amend plans to comply. Note a 600mm eave overhang is permitted within the setback
       distance.
2.     The basement and manoeuvring areas are required to be constructed at a level that permits
       these areas to drain from the site by gravity means without the need for mechanical pumping.
       In this regard please provide a preliminary storm water plan prepared by a licensed Hydraulic
       Engineer demonstrating compliance to Probable Solution S2.2 and Specific Outcome O2 of
       the Detached House Code. A copy of the Outcome is provided below:

Flooding and drainage20
O2 Buildings and other works are designed and      S2.1 For new buildings or structures or additions of more than 50m2 of
sited to-                                          gross floor area to an existing building or structure -floor levels of habitable
                                                   rooms are-
a) provide flood free access to premises and
flood free habitable areas;                        a) for areas where minimum floor levels are available-not less than the
b) allow only minor, short term and infrequent     specified level;
flooding of non-habitable areas;                   b) for areas where flood modelling is available-a minimum of 500mm
c) ensure the protection of persons and property   above the modelled flood level; and
in the event of a flood and power failure;         c) for areas where flood modelling is not available, a minimum of 500mm
Full text of the other 2 pages

Page 2

                                                                -2-


d) ensure drainage does not adversely impact           above the highest known flood level 21;
upon other premises; and                               S2.2 Enclosed car parking and manoeuvring areas are constructed at a
e) ensure filling or excavation does not adversely     level that permits the parking area to drain from the site by gravity means,
impact upon other premises by-                         without the need for mechanical pumping;
                                                       AND
                                                       S2.3 Filling, other than accessways, does not extend more than 1m
          i. causing ponding of water on the site
                                                       beyond the footprint of any building or structure, measured from the outer
          or nearby land; and
                                                       walls of the building or structure.
          ii. increasing flooding, which adversely
          affects the safety or use of any land
          upstream and downstream; and
                                                        Advisory                                                          note
          iii. adversely affecting the flow of water
                                                        Council encourages building methods that avoid the use of fill such as
          in any overland flow path.
                                                        suspended floor construction and stepping down slopes rather than
                                                        cutting and filling.




Under the provisions of the Integrated Planning Act 1997, you have three options available in
response to this Information Request. You may give the assessment manager (in this instance
Council) and each referral agency (if any):
1.      all of the information requested; or
2.      part of the information requested together with a letter asking the assessment manager and
        each referral agency to proceed with the assessment of the application; or
3.      a letter:
        (i)     stating that you do not intend to supply any of the information requested; and

        (ii)    asking the assessment manager and each referral agency to proceed with the
                assessment of the application.

Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the applicant is to
respond to any information request within 12 months of the request or otherwise, the application
lapses.
A response to the above is required to be submitted, prior to further assessment of the application. If
any further matters arise as part of assessment of this application, you will be advised accordingly.

Council prefers that all the information requested be submitted as one package. A preliminary
assessment only of the application has been undertaken and during the formal decision stage, or as
a result of public exhibition, other matters may arise. You are requested to advise your client directly
regarding this request.
Information on the status of development applications may be viewed using PD Online, which is
accessible via the Sunshine Coast Regional Council website www.sunshinecoast.qld.gov.au . Using
the "Quick Links" on the left hand side of the screen, users may select "PD Online" by clicking on it,
which will take users to the Planning and PD Online page. At this point, a disclaimer will show; users
may click on "agree" if they agree and can enter either the development application number, or the
address of the property to start viewing information on it on the application.
Should you have any further queries in relation to the above, please do not hesitate to contact me on
the above number.
Yours faithfully,




Glen Conforti
TECHNICAL OFFICER – LAND USE

Page 3

-3-

Used in these records

About this file

File size
15 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request for Further Information - 010.2008.00002078.001 [As Published].pdf · 15 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.