IDAS form 1—Application details

(Sustainable Planning Act 2009 version 4.2 effective 3 August 2015)

This form must be used for ALL development applications.

You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.

For all development applications, you must:
* — complete this form (/DAS form 1—Application details)
. complete any other forms relevant to your application

* — provide any mandatory supporting information identified on the forms as being required to accompany your
application.

Attach extra pages if there is insufficient space on this form.

€ All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009,

! This form and any ‘other IDAS form relevant to your application must be used for development applications relating to
; Strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
| Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
use plan for the strategic port land, Brisbane core port land or airport land.

PLEASE NOTE: This form is not required to accompany requests for compliance assessment. —

 

 

Mandatory requirements

 

 

Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct,
Any development permit or preliminary approval that may be issued as a consequence of this application will be issued
to the applicant.)

 

 

 

 

Name/s (individual or company name in full) (Ee LB Ob COE merry hor; bot Vj

( For companies, contact name | fe CATT Coes STRYU MONS
Postal address 6 LO

 

Suburb he
State CY Postcode

Country Var fee
Contact phone number SS SO _/7?88

Mobile number (non-mandatory requirement)

 

 

 

 

 

 

 

Fax number (non-mandatory requirement) S%& yO /O72

 

 

 

 

T= 7 Queens!
Full text of the other 11 pages

Page 2

Email address (non-mandatory requirement)

Applicant's reference number (non-mandatory
requirement)

 

 

 

 

 

 

 

 

1.

What is the nature of the development proposed and what type of approval is being sought?

 

 

Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2

 

a)

What is the nature of the development? (Please only tick one box.) ou
C] Material change of use O Reconfiguring a lot Cy Building work Operational work

What is the approval type? (Please only tick one box.)

CJ Preliminary approval CT Preliminary approval C Development permit
under 8241 of SPA under $241 and s242
of SPA

Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)

 

 

CONSTILCTI oF PRUE M7 Aud LAWOSCARE oF SITE And Pode Pexeeus

 

 

Whats the level of assessment? (Please only tick one box.)
Cl Impact assessment Foote assessment

 

 

Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C—
Additional aspects of the application.)

 

a)

What is the nature of development? (Please only tick one box.)

CJ Material change of use CL) Reconfiguring a lot LC Building work O Operational work

What is the approval type? (Please only tick one box.)

LJ Preliminary approval C] Preliminary approval LI Development
under 8241 of SPA under $241 and $242 permit
of SPA

Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)

 

 

 

 

What is the level of assessment?

C] Impact assessment Cc Code assessment

 

 

Table C—Additional aspects of the application (If there are additional aspects to the application please list ina
separate table on an extra page and attach to this form.)

 

 

C] Refer attached schedule LC Not required

 

IDAS form 1—Application deta
Version 4.2—3 August 20

 

Page 3

 

 

2. Location of the premises (Complete Table D and/or Table E as applicable. Identify each lot ina separate row

 

 

Table D—Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water.)
(Attach a separate schedule if there is insufficient space in this table.)

Ps Street address and [ot on plan (All lots must be listed.)

[1 Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)

 

 

 

 

 

 

 

 

Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no, suburb/ locality name code and plan no.
i oe & or 3 ;
i Bf (BET ain S67 EB | RPPIPIO| Surspee Corer
ii)
iti) Seavien Tee.

 

 

 

 

 

Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
separate row in the below table. Non-mandatory)

 

Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s
i)
ii)

ili)

 

 

 

 

 

 

 

 

Table E---Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g, channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)

 

 

 

Coordinates Zone Datum Local government
(Note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
L] epas4
[ wess4
| CE] other

 

 

 

 

 

 

 

 

3. Total area of the premises on which the development is proposed (indicate square metres)
GH wy

4, Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm etc.)

 

 

 

 

 

 

les pece

 

 

IDAS form 1-—Application dete
Version 4.2—3 August 26

 

Page 4

ES PORIGUG UE TUS UKs, LUC UU SHgiy Gare raise

 

 

5, Are there any current approvals (e.g. a preliminary approva!) associated with this application? (Non-
mandatory requirement)

L] No LY Yes—provide details below

List of approval referenge/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
Wey LE 20 23 wie Z_ rh

| 6. Is owner’s éonsent required for this application? (Refer to notes at the end of this form for more information.

EX no

LJ] Yes—complete either Table F, Table G or Table H as applicable

 

 

 

 

 

 

 

 

 

 

 

Table F

 

Name of owner/s of the land

 

We, the above-mentioned owner/s of the land, consent to the making of this application.

 

Signature of owner/s of the land

 

Date

 

 

Table G
Name of owner/s of the land

 

 

C] The owner's written consent is attached or will be provided separately to the assessment manager.

 

 

Table H
Name of owner/s of the land

 

 

 

LC] By making this application, |, the applicant, declare that the owner has given written consent to the making of the application.

 

 

N

Identify if any of the following apply to the premises (Tick applicable box/es.)

 

 

Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table |

On strategic port land under the Transport Infrastructure Act 1994—complete Table J

In a tidal water area—~complete Table K

On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.)

On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)

OOOOOO

Listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) unde:
the Environmental Protection Act 1994 (no table requires completion)

 

Table |

Name of water body, watercourse or aquifer

 

 

 

 

IDAS form 1—Application deta
Version 4.2—-3 August 20

 

Page 5

VE PUP RTe VE ASL UES, LUE VUYGIINEIL GNU Fatt

 

Table J

 

 

 

 

 

Lot on plan description for strategic port land Port authority for the fot
Table K
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)

 

 

 

 

8. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water etc)

 

CT No C] Yes—ensure the type, location and dimension of each easement is included in the plans submitted

 

9. Does the proposal include new building work or operational work on the premises? (Including any
services)

 

L] No mA Yes—ensure the nature, location and dimension of proposed works are included in plans submitted

 

10. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the
end of this form for more information.)

 

rt No—go to question 12 [] Yes

 

 

11. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more
information.)

 

[[] No

Yes—-complete Table L and submit with this application the yellow local government/private certifier's copy of the
receipted QLeave form

 

Table L

 

Amount paid Date paid QLeave project number (6 digit number
(dd/mm/yy) starting with A, B, E, L or P)

 

 

 

 

 

 

12. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?

 

[] No

[_] Yes—please provide details below

 

Name of focal government Date of written notice given | Reference number of written notice given
by local government by local government (if applicable)
(dd/mmf/yy)

 

 

 

 

 

IDAS form 1—Application deta
Version 4.2—3 August 20

 

Page 6

Question 12

« The portable long service leave levy need not be paid when the application is made, but the Building and
Construction industry (Portable Long Service Leave) Act 1997 requires the levy to be paid before a development

permit is issued,

« Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qgleave.qid.gov.au. For
further information contact QLeave on 1800 803 481 or visit www.qleave.qid.gov.au.

Privacy—the information collected in this form will be used by the Department of Infrastructure, Local Government
and Planning (DILGP), assessment manager, referral agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.

 

€ " )FFICE USE ONLY

 

Date received

 

Reference numbers

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

To

 

 

 

Council. | have been engaged as the private certifier for the
building work referred to in this application

 

Date of engagement

Name

number

BSA Certification license

Building
classification/s

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if

 

applicable.)
Date receipted .
: : 5 Name of officer
as QLeave project Amount paid ., | form sighted by 1
Description of the work number (8) Date paid assessment pmo sighted the
manager

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure, Local Government and
Planning. This form and all other required application materials should be sent to your assessment manager and any

referral agency.

IDAS form 1—Application detai
Version 4.2—3 August 20:

 

Page 7

(

 

13. List below all of the forms and supporting information that accompany this application (Include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application)

 

 

Description of attachment or title of attachment Method of lodgement to
assessment manager

 

 

 

 

 

 

 

 

14. Applicant's declaration

 

 

 

MI By making this application, | declare that all information in this application is true and correct (Note: it is unlawful to
provide false or misleading information)

 

Notes for completing this form

Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the
Sustainable Planning Act 2009

Applicant details

Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.

Question 1
* Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of

assessment. Where schedule 3 identifies assessable development as “various aspects of development’ the
applicant must identify each aspect of the development on Tables A, B and C respectively and as required.

Question 6

Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application. If a development application relates to a state resource, the application is not required to be supported
by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the
subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state
resource is a separate process and will need to be obtained before development commences.

Question 7
e Ifthe premises is listed on either the Contaminated Land Register (CLR) or the Environmental

Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to
seek compliance assessment. Schedule 418 of the Sustainable Planning Regulation 2009 identifies
where compliance assessment is required.

Question 11

°

The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.

The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

IDAS form 1—Application detai
Version 4.2—3 August 201

 

Page 8

VeEPAUHEIL U1 MINA SUULLUTe, LOCA OUVEFININESIL AiG Pla

 

IDAS form 6—Building or operational work assessable
against a planning scheme

(Sustainable Planning Act 2009 version 3.1 effective 3 August 2015)

This form must be used for development applications for building work or operational work assessable against a
planning scheme.

You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.

For all development applications, you must:
* complete IDAS form 1—Application details
¢ complete any other forms relevant to your application

® — provide any mandatory supporting information identified on the forms as being required to accompany your
application.

Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.

 

| This form must be used for building work or operational work relating on strategic port land and Brisbane core port lan
i under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,

take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.

 

 

Mandatory requirements

 

 

41. What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable

 

 

boxes.)
[-] Building work—complete Table A ow Operational work—complete Table B
Table A
a) Whatis the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
building)?

 

 

 

 

b) Are there any current approvals associated with this application? (e.g. material change of use.)
E] No []  Yes— provide details below

 

List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)

 

 

 

 

 

 

 

 

 

Page 9

Leparunent Ut Hilrastructure, LOCai Government ang Flar

 

 

| ¢)  Arg/there any current approvals associated with this application? (E.g. material change of use.)

Table B
a) Whatis the nature of the operational work? (Tick all applicable boxes.)
[-] Road works [_] Stormwater [| Water infrastructure
[-] Drainage works CJ Earthworks Cc Sewerage infrastructure
PA Landscaping CT] Signage CJ Clearing vegetation under the planning scheme

 

ri Other—provide details | DZ// 8 W/ 4-4:

b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)

 

 

 

No CJ Yes—specify the number of lots being created

 

 

 

No [[] Yes—provide details below

 

List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)

MeV /s5 (02 28 SLOL. a Ze RE

 

 

 

 

 

 

 

 

 

2. What Is the dollar value of the proposed building work? $
(Inc GST, materials and labour.)

 

 

3. What is the dollar value of the proposed operational work? $ oce>
(Inc GST, materials and labour.) 4 ‘SO, .

 

 

 

Mandatory supporting information

 

 

4, Confirm that the following mandatory supporting information accompanies this application

 

 

Mandatory supporting information Confirmation of | Method of
lodgement lodgement

 

All applications involving building work or operational work

 

 

A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are (| confirmed

recommended scales) which shows the following:

* the location and site area of the land to which the application relates
(relevant land)

« the north point

« the boundaries of the relevant land

» the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)

* any existing or proposed easements on the relevant land and their
function

e any access limitation strips

* all existing and proposed roads and access points on the relevant land.

 

 

 

IDAS form 6—Building or operational work assessai
against a planning schei
Version 3.1-—-3 August 26

 

Page 10

ie ae

PELE ep EU I EEG EE AUT

 

 

A statement about how the proposed development addresses the local
government's planning schemes and any other planning documents relevant
to the application.

[Confirmed

 

A statement addressing the relevant part(s) of the State Development
Assessment Provisions (SDAP).

C] Confirmed
Not applicable

 

Applications for building work (including extensions and demolition that i:

 

Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are
recommended scales) which show the following:
the north point
e the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)

« the room layout (for residential development only) with ail rooms clearly
labelled

e the existing and the proposed built form (for extensions only)
the gross floor area of each proposed floor area.

[confirmed

[_] Not applicable

 

Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are
recommended scales) which show plans of all building elevations and
facades, clearly labelled to identify orientation (e.g. north elevation).

[A confirmed

(_] Not applicable

 

Plans showing the size, location, proposed site cover, proposed maximum
number of storeys, and proposed maximum height above natural ground level
of the proposed new building work.

[7f confirmed
| Not applicable

 

Plans showing the extent of any demolition that is assessable development.

[_] Gonfirmed
wi Not applicable

 

Applications for operational work involving earthworks (filling and excavating)

 

Drawings showing:

« existing and proposed contours

* areas to be cut and filled

¢ the location and level of any permanent survey marks or reference
stations used as datum for the works

e the location of any proposed retaining walls on the relevant land and their
height
the defined flood level (if applicable)
the fill level (if applicable),

[confirmed

[_] Not applicable

 

Applications for operational work involving roadworks

 

 

Drawings showing:

* existing and proposed contours

« the centreline or construction line showing chainages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points

¢ information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)

e kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)

© edge of pavement where kerb is not constructed
position and extent of channelisation

* location and details of all traffic signs, guideposts, guardrail and other
street furniture

[1 Confirmed

CI Not applicable

 

@ pavement markings including details on raised pavement markers

 

is assessable development)

 

IDAS form 6—Building or operational work assessat

against a planning scher.
Version 3.1-—~3 August 20

 

Page 11

wn Se er ee ee eee ee ee ee Se Se ee tee eee

 

 

catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

concrete footpaths and cycle paths

location and details for access points, ramps and invert crossings
changes in surfacing material.

 

Applications for operational work involving stormwater drainage

 

Drawings showing: [ }esatimed
* existing and proposed contours Not applicable
© drainage locations, diameters and class of pipe, open drains and
easements
® manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
* inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.

 

“! Applications for operational work involving water reticulation

 

Drawings showing: ("] Zonfirmea
© kerb lines or edge of pavement where kerb is not constructed Not applicable

¢ location and levels of other utility services where affected by water
reticulation works

pipe diameter, type of pipe and pipe alignment
water main alignments

water supply pump station details (if applicable)
minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

location of house connections (if applicable)
location of bench marks and reference pegs.

 

Applications for operational work involving sewerage reticulation

 

Drawings showing: Lyntired
location of all existing and proposed services Not applicable

location of all existing and proposed sewer lines and manhole locations

location of all house connection branches

kerb lines or edge of pavement where kerb is not constructed

chainages

design sewer invert levels

design top of manhole levels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment

location of house connections (if applicable)

sewer pump station details (if applicable).

 

Applications for operational work involving street lighting

 

 

Drawings showing: Lenten
location of all light poles and service conduits Not applicable

location of all other cross road conduits

type of wattage and lighting

any traffic calming devices

additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment

 

 

ae een e

 

IDAS form 6—Building or operational work assessab.
against a planning scherr.
Version 3.1—3 August 207

 

Page 12

 

 

* details of lighting levels.

 

Applications for operational work involving public utility services

 

Drawings showing:

e any existing light poles and power poles
® any existing underground services

© details of proposed services

¢ alteration to existing services.

[ep péearme
Not applicable

 

Applications for operational work involving landscaping works

 

Drawings showing:
« the location of proposed plant species

numbers of plants

edge

the proposed maintenance period
irrigation system details.

 

* aplant schedule indicating common and botanical names, pot sizes and

* planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden

the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences

 

[A Confirmed
im Not applicable

 

 

Privacy—Please refer to your assessment manager, referral agency and/or ouilding certifier for further details on the

use of information recorded in this form.

 

OFFICE USE ONLY

 

Date received

 

 

 

Reference numbers

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure, Local Government and
Planning. This form and all other required application materials should be sent to your assessment manager and any

referral agency.

IDAS form 6—Building or operational work assessal

against a planning scher
Version 3.1—~3 August 20

 

Used in these records

About this file

File size
510 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended IDAS Form 1 and 6.pdf · 510 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.