Skip to the record
Accept no imitations.

Council archive · source document

Development Application part 2 Application Forms REC11/0145

of 152

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

 THIS IS THE NEXT PAR T OF A        RECwE
MULTIPLE PART R CORj              15 pEC
                                    scE,c - c;,c

       Part ^`= 0f             ^s'^. Retort


[OCR of page images]
 

$CRC CORRESPONDENCE

Place Barcode here ANNA Mt =
4 | ~
a) A ?

 

 

B0398979

 

THIS IS THE NEXT PART OF A (9 90:)
MULTIPLE PART pe 15 DEC 70)

Part 2 of >

Application number: — KEC ||| FS

NAGEMENT\RECORDS MANAGEMENT Control of Records\EDRMS\Multi Part Record Cover Sheet FIRST PART i

 

 

 

 

 
Full text of pages 2 to 80 (of 152)

Page 2

                 LAN     D PARTN E RS
                 built environment consultants

Lv
Application Report

Reconfiguring a Lot

This Planning Report has been prepared by LandPartners Limited on
behalf of Astronomer Pty Ltd, to accompany an application seeking a
Development Permit f o r te ] Recnnfigurang n I c t (One (1) into ThrPP (31
Lots and Access Easement), subject to Code Assessment at 21 Webb
Road, Sunshine Beach on land described as Lot 2 on RP234161.




21 Webb Road, Sunshine Beach



13 December 2011

Report for Lodgement




Planning - Titling - Urban Design - Mapping & GIS - Surveying

13 Railway Terrace, Milton QLD 4064
PO Box 3916, Soulh Brisbane BC QLD 4101
T: 61 7 3842 1000 F: 61 7 3842 1001
E: [email protected]

Page 3

           LANDPARTNERS




     Table of Contents
     1.0      Executive Summary ............................................................................................................. 1
     1.1      Summary ............................................................................................................................... 1


     2.0      Synopsis ........................................................................................................................... 2

     3.0      The Proposal ..................................................................................................................... 3
     3.1      Application Details ................................................................................................................. 3
     3.2       Details of Proposal ................................................................................................................. 3
     3.3      Supporting Information ........................................................................................................... 5

     4.0       Key Issues & Opportunities .................................................................................................. 6
     4.1      Site Characteristics ................................................................................................................. 6

     4.2       Overview ............................................................................................................................... 8
P
     5.0       Development Assessment .................................................................................................... 9
     5.1      Assessment Overview ............................................................................................................. 9
     5.2       South East Queensland Regional Plan ...................................................................................... 9
               Vegetation Management Act                        ..........................................................................................

     5.4       South East Queensland Regional Coastal Management Plan ................................................... 10
     5.5       State Planning Policies .......................................................................................................... 10

     5.6       Temporary Local Planning Instruments ................................................................................... 10
     5.7       Noosa Plan Planning Scheme - Zone ..................................................................................... 10
     5.8       The Noosa Plan- Locality Plan .............................................................................................. 1 1
     5.9       Noosa Plan - Overlays ......................................................................................................... 12

     5.10      Noosa Plan Planning Scheme -Applicable Codes ................................................................... 12
     5.11      Noosa Plan Planning Scheme - Overlay Codes ....................................................................... 12
     5.12      The Noosa Plan- Planning Scheme Policies ............................................................................ 13
     5.13 Infrastructure Charges .......................................................................................................... 13

fl   6.0       Referral Agencies ............................................................................................................. 14
     6.1       Sustainable Planning Regulation 2009 ................................................................................... 14


     7.0       Conclusion ...................................................................................................................... 15
     7.1       Recommendation ................................................................................................................. 15

     Appendix A : LandPartners Limited's Assessment of Relevant Codes .................................................. 17

     Appendix B : Proposed Plan ......................................................................................................... 75

     Appendix C : Title Documents ...................................................................................................... 76

     Appendix D Relevant Searches ................................................................................................... 77

     Appendix E : Slope Stability Assessment ........................................................................................ 86

     Appendix F : Vegetation Assessment ............................................................................................. 87

     Appendix G Bushfire Assessment ............................................................................................... 88

     Appendix H          Engineering Assessment .......................................................................................... 89

Page 4

  LANDPARTNERS



1.0    Executive Summary

1.1    Summary

       This report has been prepared by LandPartners Limited on behalf of Astronomer Pty Ltd
       in support of an application seeking a Development Permit for a Reconfiguring a Lot
       (One (1) into Three (3) Lots and Access Easement), subject to Code Assessment at 21
       Webb Road, Sunshine Beach on land described as Lot 2 on RP234161.

       The site is within the Detached Housing Zoning and within the Eastern Beaches Locality
       Plan of the Noosa Plan. The proposed reconfiguration represents a positive planning
       outcome that achieves a high level of compliance with the applicable development
       codes. The development proposes compatible lot sizes and can be easily serviced by all
       urban infrastructure.

       It is recommended the Sunshine Coast Regional Council approve the proposed
       application, subject to reasonable and relevant conditions, as:

           • The proposed reconfiguration implements appropriate mitigation measures to
           --ensure minimal impact on surrounding land uses;
           • The intensity and scale of the proposed reconfiguration is designed to reflect the
              surrounding land uses and maintain the character of the local environment;
           • The proposed development is considered to comply with or provide appropriate
              solutions to the requirements in the relevant provisions of the Noosa Plan, and
              should be supported by Council in this instance.




                            BRSS6220.002 Report for Lodgement                                1

Page 5

     kURPARTNERS



     2.0   Synopsis
           Application Details
            Applicant:                           Astronomer Pty Ltd
                                                  C/- LandPartners Limited
            Relevant Town Planning               The Noosa Plan
            Scheme:
            Description of Proposal:             Reconfiguring a Lot (One (1) into Three (3) Lots and
                                                 Access Easement)
            Approval Type:                        Development Permit
            Level of Assessment:                  Code Assessment
            Referral Agencies:                    DERM - Erosion Prone Area
            Applicable DEO's:                     Residential Uses
P
                                                  Infrastructure and Services
            Applicable Codes:                     Eastern Beaches Locality Code
                                                  Reconfiguring a Lot Code
                                                  Landscaping Code
                                                  Engineering Works Codes
            Applicable Overlay Codes:             Natural Hazards Overlays Code
                                                  Natural Resources Overlay Code
                                                  Biodiversity Overlay Code
            Owners' Name:                        Astronomer Pty Ltd A.C.N. 050 412 907 Trustee
                                                 Under Instrument 707151471

           Site Details
            Site Address:                        21 Webb Road, Sunshine Beach
fl
            Site Description:                    Lot 2 on RP234161
            Easements:                           Nil
                                                 (Refer to Title Documents included in Appendix C)
            Total Area of Site:                  2,653m2
            Local Government Area:               Sunshine Coast Regional Council
            Zone:                                Detached Housing Zone
            Locality Plan:                       Eastern Beaches Locality Plan
            South East Queensland                Urban Footprint
            Regional Plan:

           Report Status
            Project Director:                    Shane Smith
            Author:                              Angus Green
            Reviewed by:                         John Finglas
            Date:                                 13 December 2011


                                   BRSS6220.002 Report for Lodgement

Page 6

       LANDPARTNERS




     3.0    The Proposal

     3.1    Application Details

            LandPartners Limited has prepared this Application Report in support of an application
            seeking a Development Permit for a Reconfiguring a Lot (One (1) into Three (3) Lots
            and Access Easement) at 21 Webb Road, Sunshine Beach on land described as Lot 2 on
            RP234161. This application is supported by proposal plans prepared by LandPartners
            Limited, included in Appendix B.

            In accordance with the Level of Assessment Table for the Detached Housing Zone of the
            Eastern Beaches Locality (Division 12 - Table 7.10) of the Noosa Plan, the proposed
            reconfiguration will be subject to Code Assessment, and therefore public notification will
            not be required in accordance with the Sustainable Planning Act 2009.

fl          In accordance with s260 of the Sustainable Planning Act 2009, it is considered this
            application is properly made, and should be accepted by Council.


     3.2    Details of Proposal

            As previously identified, this development application is seeking to permit a
            reconfiguration to occur on the subject site. The proposed residential reconfiguration
            creates three (3) allotments which are compatible with the surrounding residential land
            pattern and intent of the Detached Housing Zoning and Eastern Beaches Locality Plan.

            The following table provides a breakdown of the propose     reconfiguration;
             Real Property Description      Lot 2 RP234161
             Existing Lots                  One. 1
             Site Area m2                   2653m2
             Proposed Lots                  Three (3)
             Average Lot Size               884m2
P            Range of Lot Sizes             800m2 - 1053m2

            The proposed allotments achieve access via a reciprocal easement. The proposed
            layout achieves a high level of compliance with the requirements of the Reconfiguring a
            Lot Code and most notably the minimum lot sizes and dimensions as specified in table
            14-68.

            Servicing
            An Engineering Assessment has been prepared by DMC Enterprises Pty Ltd (Appendix
            H) to illustrate how the proposed allotments will achieve water reticulation, sewer
            reticulation and stormwater drainage.

                 • Water Reticulation;
            Water reticulation could be provided to the new allotments through a common services
            trench along the proposed access easements boundary, due to the diameter of the
            existing main and the level of the proposed building area.

                • Sewer Reticulation;
            An existing sewer manhole and gravity reticulation main (1 50mm) is located within
            Webb Road. It is noted that this size main should be sufficient to service the increase
            demand caused by the proposed additional allotments. The attached Engineering
            Assessment identifies how the new allotments will be serviced.

                                 BRSS6220.002 Report for Lodgement

Page 7

    LANRPOT N E R S


               • Stormwater Drainage;
           The attached Engineering Assessment recommends that the current outlet discharging in
           Ed Webb Park be maintained. Roofwater pits and pipe proposed along the rear
           boundary of the proposed new allotments could discharge into the existing outlet.

           Overlays
           It is acknowledged that the site is affected by the following Council overlays;

               • Bushfire Hazard Overlay;
           The majority of the site is included within the medium Bushfire Hazard overlay. As
           detailed within the attached Bushfire Assessment undertaken by The Consultancy
           Bureau, ground truthing in accordance within State Planning Policy 01/03 reveals that
           there is a very low risk of bushfire risk.

               • Landslide Hazard Area Overlay;
           The entire site is situated within the Landslide Hazard Area overlay. In support of the
           proposed development a Slope Stability Assessment has been prepared by SCG
C          Consulting Engineers. Based on an assessment of the proposed development against
           the Guidelines for Landslip Management Framework as provided by the Australian
           Geomechanics Society in their journal of March 2007, the subject site is considered to a
           low risk of landslip. The Slope Stability Assessment contains additional construction
                                                 ability at subsequent deve!GpMeRt GtG1996.

               • Coastal Protection Area Overlay;
           The site is located within the Coastal Protection Area Overlay. An assessment has been
           undertaken against Table 13.17 of the Natural Hazards and Natural Resources
           Overlays Code. The proposal achieves a high level of compliance with the Acceptable
           Solutions. Furthermore in support of the proposed development a Vegetation
           Assessment prepared by Bio Track Pty Ltd has been included within Appendix F.

               • Acid Sulfate Soil Overlay;
           The entire site is included within the Acid Sulfate Soil Overlay, however the criteria for
           Code Assessment do not apply and consequently the A.S.S Overlay is exempt from
           assessment.
9

               • Environmental Areas Overlay;
           The site is located within the Environmental Protection Area of the Environmental Areas
           Overlay. The proposal achieves a high level of compliance with the relevant Acceptable
           Solutions of the Biodiversity Overlay Code and where compliance with the Acceptable
           Solution cannot be met the proposal complies with the relevant Performance Criteria.
           Furthermore in support of the proposed development a Vegetation Assessment
           prepared by Bio Track Pty Ltd has been included within Appendix F.




                                 BRSS6220.002 Report for Lodgement

Page 8

      LANRP!RTNERS



    3.3    Supporting Information

           The following information has been attached to this Application Report as Appendices
           for Council consideration:

               •     Appendix A : LandPartners Limited's Assessment of Relevant Codes, Prepared by
                     LandPartners Limited;
               •     Appendix B : Proposed Plan, Prepared by LandPartners Limited;
               •     Appendix C : Title Documents, Lot 2 on RP234161;
               •     Appendix D : Relevant Searches, Lot 2 on RP23416;
               •     Appendix E : Slope Stability Assessment, Prepared by SCG Consulting Engineers;
               •     Appendix F : Vegetation Assessment, Prepared by Bio-Track Pty Ltd;
               •     Appendix G : Bushfire Assessment, Prepared by The Consultancy Bureau; &
               •     Appendix H : Engineering Assessment, Prepared by DMC Enterprises Pty Ltd.


P




P




                                  BRSS6220.002 Report for Lodgement

Page 9

  LANDPARTNERS




4.0     Key Issues & Opportunities

4.1    Site Characteristics

       The following is an assessment of the Site Characteristics of Lot 2 on RP234161.

       Location
       As illustrated on Figure 1 and Figure 2 below, the subject site is located at 21 Webb
       Road, Sunshine Beach. The total area of the subject site is 2,653m2, which is currently
       owned by Astronomer Pty Ltd. The subject site is bounded by detached residential
       dwellings on residential land.




                                   Figure 1 - Location of Subject Site
                                        (Source : PlanXchange)




                               Figure 2 - Aerial Photograph of Subject Site
                          (Source : Sunshine Coast Regional Council PD Online)

                            BRSS6220.002 Report for Lodgement

Page 10

    LANDPARTNERS




         Current Use of the Site
         As shown on Figure 2 above, an existing residential dwelling is currently located on Lot
         2 on RP234161.


         Topography
         The site falls away from Webb Road to the southern beach side.


         Flooding
         The subject site is not identified as being subject to the Flood Hazard Overlay. The
         proposed development will ensure the future construction of residential dwellings will
         achieve the appropriate flood immunity levels.


         Existing Vegetation
•        Some vegetation is located on the subject site, however, it is considered that the
         vegetation is not significant vegetation and is not identified as being a Regional
         Ecosystem. The site contains vegetation located within the Environment Protection Area
         Overlay. The attached report prepared by BioTrack Pty Ltd undertakes a study of the
         vegetation located within the EPA overlay. The report concludes that the vegetation is
         considered to have a low ecological value for the following reasons;
             •     It does not form a intact floral community
             •     There is no contiguous canopy
             •     There is no linkage to other vegetation
             •     The area is highly modified
             •     It is very close to dwellings
             •     The trees are unlikely to be used for roosting or nesting
             •     The species have a low to modest source of food for birds and other animals
             •     Pets used by the owner will deter wildlife
             •     With the existing land management it is probable the endemic trees would be
                   displaced by exotic flora as they die from natural causes
C

         Some vegetation will be required to be removed to ensure the vegetation will not have a
         negative impact on the proposed development. However, as the vegetation proposed to
         be removed is not significant vegetation, the subject site is identified for urban
         purposes, and appropriate landscape areas are proposed, the removal of this
         vegetation is considered appropriate in this instance. The attached Vegetation
         Assessment includes a replating recommendation for an additional 26 trees.


         Contaminated Land
         The subject site is not included within the Environmental Management Register or
         Contaminated Land Register. A search of the abovementioned registers was undertaken
         by LandPartners Limited, with the results included within Appendix D of this application.


         Acid Sulfate Soils
         The subject site is identified within the low potential for Acid Sulfate Soils overlay,
         however the proposed development does not activate any referral triggers, therefore
         this overlay is exempt from assessment;



                                 BRSS6220.002 Report for Lodgement                               7

Page 11

     IANDPARTNERS




    4.2   Overview
          Following the assessment of this application, the following key issues have been
          highlighted and appropriately addressed as follows.


          Suitability of the Subject Site for the Proposed Development
          The subject site is considered appropriate for the proposed reconfiguration, with the
          proposed development considered to maintain the established and proposed character
          of the surrounding location. The site is currently included within the Detached Housing
          Zone of the Eastern Beaches Locality Plan. The proposed development creates
          residential allotments which are consistent with minimum lot sizes and can be serviced
          by all urban infrastructure.
E
          Access
          The proposed allotments achieve access via a 5m access easement running along the
          southern boundary of the adjoining Lot 1 on RP234161 . The development illustrates a
          high degree of comp iance with Planning Scheme Policy 5 - trigineering Design
          Standards and provides safe access and ingress and a suitably sized easement to
          service the proposed allotments.


          The proposed easement contains a gradient of less than 20% and a width of 4.5m-5m.
          This is consistent with the PSP5.


          The easement caters for three allotments in total which is acknowledged to marginally
          exceed the PSP5 standards; however based on 7 vehicle movements per day (vpd) per
          allotment the development totals 21 vpd. This only exceeds the 20vpd requirement by
           1 vpd and should be considered appropriate in this instance.


          Air Quality and Noise Emissions
          The proposed reconfiguration is not considered to cause negative air quality or noise
          emissions on surrounding properties. Any further land uses will be required to comply
          with the applicable standards, and minimise the negative impact on surrounding land
          uses.


          Services and Infrastructure
          The proposed reconfiguration will be connected to appropriate urban services, include
          an reticulated water supply network, reticulated sewage network, telephone service, and
          electricity supply.


          The attached Engineering Assessment (Appendix H) provides details of the proposed
          allotments connection to reticulated water, reticulated sewer and stormwater drainage.




                                BRSS6220.002 Report for Lodgement                                  8

Page 12

       LANRPAFTNERS



     5.0    Development Assessment

     5.1    Assessment Overview

            In accordance with the Level of Assessment Table for the Detached Housing Zone of the
            Eastern Beaches Locality (Division 12 - Table 7.10) of the Noosa Plan, the proposed
            reconfiguration is subject to Code Assessment. In accordance with s313 of the
            Sustainable Planning Act 2009, the following matters are required to be assessed for an
            application subject to Code Assessment:

                (a) the State planning regulatory provisions;
                (b) the regional plan for a designated region, to the extent it is not identified in the
                    planning scheme as being appropriately reflected in the planning scheme;
                (c) any applicable codes, other than concurrence agency codes the assessment
                    manager does not apply, that are identified as a code for IDAS under this or
fl                  another Act;
                (d) State planning policies, to the extent the policies are not identified in-
                    (i) any relevant regional plan as being appropriate reflected in the regional
                          plan; or
                    (ii) the planning scheme as being appropriately reflected in the planning
                          scheme;
                (e) any applicable codes in the following instruments-
                    (i) a structure plan;
                    (ii) a master plan;
                    (iii) a temporary local planning instrument;
                    (iv) a preliminary approval to which section 242 applies;
                    (v) a planning scheme;
                (f) if the assessment manager is an infrastructure provider - the priority
                    infrastructure plan;
                (g) the common material;
                (h) any development approval for, and any lawful use of, premises the subject of the
                    application or adjacent premises;
                (i) any referral agency response for the application; and
                (I) the purpose of any instrument containing an applicable code.



     5.2    South East Queensland Regional Plan

            Lot 2 on RP234161 is included within the Urban Footprint of the South East Queens/and
            Regional P/an. The application is seeking to allow a reconfiguration to be located on
            the subject site, which is considered appropriate within the Urban Footprint. As detailed
            within the South East Queens/and Regional P/an, the proposed development will allow
            for urban land uses within the Urban Footprint, which should be considered appropriate
            and is considered to comply with the intent of the South East Queensland Regional Plan.



     5.3    Vegetation Management Act 1999

            No vegetation identified as mapped remnant vegetation is located on the subject site.
            The proposed layout ensures no significant vegetation will be cleared from the subject
            site, and is considered appropriate in this instance.


                                  BRSS6220.002 Report for Lodgement

Page 13

A   LANDPARTNERS



5.4      South East Queensland Regional Coastal Management Plan

         The subject site is identified in an Erosion Prone Area.


5.5      State Planning Policies

         The following State Planning Policies have been adequately addressed within the Noosa
         Plan:
              •    SPP 2/02: Planning and Managing Development Involving Acid Sulfate Soils;

              n    SPP 1/03: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide;

         It is considered the appropriate State Planning Policies have been adequately addressed
         within Council's Planning Scheme.


5.6      Temporary Local Planning Instruments

         There is no current Temporary Local Planning Instruments have been adopted by the



5.7       Noosa Plan Planning Scheme - Zone

         As previously identified, the subject site is included within the Detached Housing Zone of
         the Noosa Plan.

         The intent of the Detached Housing Zone is to -single detached housing prevails that
         maintains


         •        a low impact, low density development form of domestic scale;
         •        a high level of residential amenity and design quality;
         •        a coastal building style that integrates with the landscape and topography and
                  respects the local climatic conditions; and
          •       landscaping amongst buildings, retaining trees and vegetation wherever practical.


         The proposed development is considered to comply with the intent of the Detached
         Housing Zone and provide appropriate mitigation measures to minimise impact on the
         surrounding land uses, and should be considered appropriate in this instance.


         In accordance with the Level of Assessment Table for the Detached Housing Zone within
         the Eastern Beach Locality Plan, a reconfiguration is identified as being subject to Code
         Assessment. Therefore, this application will be required to undertake Code Assessment,
         public notification of this application will not be required in accordance with the
         Sustainable Planning Act 2009. It is considered the proposed development reflects the
         intent and overall outcomes of the Detached Housing Zone and should be considered
         appropriate in this instance.




                                 BRSS6220.002 Report for Lodgement

Page 14

       LANRP TNERS



     5.8    The Noosa Plan- Locality Plan

            The subject site is included within the Eastern Beach Locality Plan of Council's Planning
            Scheme. The overall intent of the Locality Plan is to;

            a) New uses and works are located, designed and managed to-
            i be compatible with other uses and works;
            ii maintain the safety of people and works;
            iii avoid significant adverse impacts on the amenity enjoyed by users of other premises,
            including acoustic and visual qualities;
            iv avoid significant adverse impacts on the natural environment, including native habitat
            removal, fragmentation and attrition; and
            v protect the natural beach experience and overall visual amenity for beach users;
            b) The Eastern Beaches Locality retains its primary role as a residential area, though
            continues to provide some visitor accommodation and a range of local retail and
            commercial functions at Sunshine Beach, Sunrise Beach and Peregian Beach;
            c) The scale and form of buildings and other structures are-
            / designed to be responsive to the informal beachside character of the locality, being
            low rise buildings, with pitched or curved roofs and building materials that blend with
            the dune and coastal landscape;

            iii integrated into the topography and native vegetation of the dune system which
            dominates the locality; and
            iv consistent with the amenity and safety expectations of the community;
            d) Residential development is characterised by-
            i low impact buildings of a domestic scale within densely landscaped settings;
            ii building designs that are well articulated and that use design elements, materials that
            respect the coastal landscape character;
            iii building designs that avoid hard lines and boxy shapes characteristic of
            Mediterranean/Tuscan influenced design;
            iv Detached housing and Duplexes as the dominant development form; and
            v low rise Multiple housing development that is limited to the areas within the vicinity of
            the Sunshine Beach neighbourhood centre;
11          e) Emphasis is placed on the protection and retention of low cost accommodation
            consistent with maintaining a diversity of accommodation types for visitors to the
            locality;
            f) Where development is not served by sewerage infrastructure, there is no adverse
            impact on ground and surface water quality, human health and amenity as a
            consequence of the on-site disposal of effluent;
            g) The environmental and cultural heritage values of the locality are conserved and well
            managed;
            h) Areas of native remnant or regrowth vegetation, including their biodiversity and
            habitat values are protected;

            The proposed development is not considered to be in conflict with the Eastern Beaches
            Locality Plan with the development proposing consistent lot sizes and dimensions and
            the proposal should be considered appropriate in this instance.

            An assessment of the Eastern Beach Locality Plan Code has been undertaken by
            LandPartners Limited and is included within the Appendix A.




                                 BRSS6220.002 Report for Lodgement

Page 15

      LANRtARTNERS



    5.9     Noosa Plan - Overlays

           Lot 2 on RP234161 is identified as being included within the following Council Overlay
           Maps:

                   • Landslide Hazard Area Overlay;
                   • Coastal Protection Area Overlay;
                   • Environmental Area Overlay;
                   • Acid Sulfate Soils Overlay; &
                   • Bushfire Hazard Overlay.

           It is considered that the proposed layout has been designed to accommodate the
           constraints of the subject site, including Council's Overlay Codes, which have been
           incorporated into the layout of the proposed development.

           As the subject site is included within Council's Overlay Maps identified above, an
           assessment of the proposed development against the following Council Overlay Codes
           is required in this instance:

               •     Biodiversity Code;
               •     Natural Hazards Overlays      ; and
               •     Natural Resources Overlay Code Overlay Code.

           An assessment of the proposed development against the abovementioned Overlay
           Codes has been undertaken by LandPartners Limited, included in Appendix A. It should
           be noted that the relevant Overlay Codes do not change the level of assessment for the
           proposed development.


    5.10    Noosa Plan Planning Scheme -Applicable Codes

           As identified within the Level of Assessment Table for the Detached Housing Zone, the
•          following Codes are identified as Codes relevant to the proposed development:

               •     Eastern Beaches Locality Code;
               •     Reconfiguring a Lot Code;
               •     Landscaping Code; &
               •     Engineering Works Codes.

           An assessment of the abovementioned Codes has been undertaken by LandPartners
           Limited and is included in Appendix A.


    5.11   Noosa Plan Planning Scheme - Overlay Codes

           A number of Overlay Codes have been identified within the Primary Codes applicable
           to the proposed development. A review of the Noosa Plan has been undertaken, and
           the following are identified as Secondary Codes applicable to this application:
                • Natural Hazards Overlays Code;
                • Natural Resources Overlay Code; &
                • Biodiversity Overlay Code.
           An assessment of the abovementioned Codes has been undertaken by LandPartners
           Limited included in Appendix A.

                                   BRSS6220.002 Report for Lodgement                           12

Page 16

      LANDPARTNERS



     5.12 The Noosa Plan- Planning Scheme Policies

           A number of Planning Scheme Policies have been identified within the Noosa Plan and
           relevant Codes, and have been identified as being applicable to the proposed
           development. The relevant Planning Scheme Policies include:

               •     PSPO5 Engineering design standards-roads, drainage and earthworks;
               •     PSPO6 Engineering design standards-Water and sewerage; and
               •     PSP18 Ecological Assessment Guidelines.

           The above Planning Scheme Policies are considered to have been appropriately
           assessed as part of LandPartners Limited's assessment of the relevant Codes, included
           in Appendix A. No further assessment against these documents is considered necessary
           in this instance.


• 5.13 Infrastructure Charges

           Infrastructure charges are to be paid in accordance with the Sunshine Coast Regional
           Council Adopted Infrastructure Charges Resolution. In accordance with the Adopted
           Infrastructure Chnrnac Racnlutian, a reconfiguration will attract an Infrastructure
           Changes in accordance with the following table.

           Table 2: Adopted Charge for Reconfiguring a Lot
            Adopted     charge     for Adopted charge for water        Adopted      charge    for
            sewerage network ($ per supply network ($ per lot)         transport,       community
            lot)                                                       purposes and stormwater
                                                                       networks ($ per lot)
            9,380                          4,620                       12,000




11




                                  BRSS6220.002 Report for Lodgement                            13

Page 17

       LANRPARTNERS




     6.0     Referral Agencies

     6.1    Sustainable Planning Regulation 2009

            In accordance with the Sustainable Planning Regulation 2009 and as identified on the
            Assessment Checklist submitted as part of this application, the proposed development
            triggers referral to the following agencies:

                      The Department of Environment and Resource Management (Concurrence
                      Agency)

            It is noted that the subject site is included within the distributor-retailer's geographic
            area, however, in accordance with the SEQ Water Act, jurisdiction has been delegated
            to the Local Government. (Sustainable Planning Act 2009, Schedule 7, Table 3, Item
            26).

            A copy of the IDAS Checklist 1 - Development Assessment Checklist and IDAS Checklist
            3 - Reconfiguring a Lot have been submitted as part of this application.




fl




                                            BRSS6220.000 Report for Lodgement                       14

Page 18

      LANRP!RTNERS




     Conclusion

     6.2    Recommendation

           This application is seeking a Development Permit for a Reconfiguring a Lot (One (1) into
           Three (3) Lots and Access Easement) at 21 Webb Road, Sunshine Beach on land
           described as Lot 2 RP234161. The proposed reconfiguration will create two additional
           allotments.

           It is recommended Council approve the proposed development subject to reasonable
           and relevant conditions, as:

               •     The proposed reconfiguration implements appropriate mitigation measures to

E              •
                     ensure minimal impact on surrounding land uses;
                     The intensity and scale of the proposed reconfiguration is designed to reflect the
                     surrounding land uses and maintain the character of the local environment;
               •     The proposed development is considered to comply with or provide appropriate
                     solutions to the requirements in the relevant provisions of the Sunshine Coast
                     Regional Gouneil Planning doeuments, and should be supported by Council iA
                     this instance.

           A full assessment of the proposed development has been carried out by LandPartners
           Limited against the Noosa Plan documents, and all other relevant legislation.

           This Application Report, together with the accompanying Proposed Plans and specialist
           reports, demonstrate the application before Council seeking a Development Permit for
           a Reconfiguring a Lot (One (1) into Three (3) Lots and Access Easement) should be
           supported by the Noosa Plan subject to reasonable and relevant conditions, and that
           approval of this application is warranted.


`J

Page 19

     Appendix A : LandPartners Limited's Assessment of Relevant
     Codes
     Prepared by LandPartners Limited
     The following is an assessment of the proposed development against the relevant sections of the
     Noosa Plan:

            Relevant Codes
                • Eastern Beaches Locality Code
                • Reconfiguring a Lot Code
                • Landscaping Code
                • Engineering Works Codes

             Overlay Codes
f:             • Biodiversity Code
               • Natural Resources Overlay Code
               • Natural Hazards Overlays Code




P




                                            BRSS6220.000 Report for Lodgement                     17

Page 20

Eastern Beaches Locality Code




Amenity
01 Uses are located, designed and operated to          No solution provided.
avoid significant adverse changes to the light, air
quality, noise, accessibility or other conditions
enjoyed by users of associated, adjoining or
nearby uses.                                       _

 Compliance

 01 Complies - The proposed development create three new residential allotments which will
 ultimately be developed for detached residential uses. Any amenity impacts are considered
 negligible.

 Character and function of the David Low Way
 02 The vegetated character of the David Low           No solution provided
 Way is protected and new development
 recognises and protects the function, capacity
 and efficiency of the David Low Way as the
 major north-south lin throughout the coastal part
 of Noosa.

 Compliance

 02 Not Applicable - The development is not located on David Low Way.



 7.10 Built form

 Density
 03 The density of development within the site         No solution provided
 area-
 a) is compatible with surrounding development;
 and
 b) does not exceed-

 i. for the Detached Housing Zone and the Rural
 Settlement Zone -
 1 Detached house per lot with the exception of
 Lot 163 on RP897370, Pacific Avenue, Sunshine
 Beach which has an allowable population
 density of 320 persons per hectare exclusively for
 the purpose of a visitor hostel

 Compliance

 03 Not Applicable - The proposal is for a residential subdivision.




                                       BRSS6220.000 Report for Lodgement               18

Page 21

tANDPARTNERS



 Height                                              54.1 Buildings and other structures have a
 04 Buildings and other structures-                  maximum height of -
 a) are low rise and present a building height       a) if in the Attached Housing Zone and
 consistent with structures on adjoining and         located in Sunshine Beach-12m;
 surrounding land;                                   b) if in the Visitor Mixed Use Zone-
 b) do not exceed a maximum height of-               1 2m, except for Lots 75-77 Heron
                                                     Street, Peregian Beach-8m;
 i. For the Attached Housing Zone                    c) if in the Open Space Recreation Zone
 within Sunshine Beach-3 storeys;                    or the Community Services Zone and
 ii. For the Visitor Mixed Use Zone-3                used for an indoor sporting
 storeys, except for Lots 75-77 P9311 Heron          complex-1 1 m;
 Street, Peregian Beach-2                            d) if in the Rural Settlement Zone-8m,
 storeys; or                                         or 9m where the pitched roof but no
 iii. For any other zone- 2 storeys;                 other part of the building or structure
 c) do not visually dominate the street, adjacent    exceeds 8m; or
 properties, surrounding spaces or the existing
 skyline;                                            e) in all other zones- 8m.
 d) preserve the amenity of surrounding land,
 including existing sunlight to neighbouring
 properties; and
 e) respect the scale of the dune and coastal
  vegetation.

  arnprrunce

 04 Not Applicable - The proposal is for a residential subdivision.
 Setbacks                                            55.1 Buildings and structures comply with
  05 Buildings and other structures are              the minimum building setbacks identified in
 appropriately designed and sited to-                Schedule 1 - Minimum Boundary Setbacks.
 a) provide amenity for users of the premises as
 well as preserve the visual and acoustic
 privacy of adjoining and nearby properties;
 b) provide adequate distance from adjoining
 uses;
 c) preserve any existing vegetation that will
 buffer the proposed building;
 d) allow for landscaping to be provided between
 buildings and street frontages and between
 neighbouring buildings;
 e) maintain the visual continuity and pattern of
 buildings and landscape elements within the
 street; and
 f) protect the natural character and visual
 amenity of the beachfront.

 Compliance

 05 Not Applicable - The proposal is for a residential subdivision.
Site cover, gross floor area and plot ratio
06 The site cover, gross floor area and plot ratio
of buildings and other roofed structures-
a) results in a building scale that is compatible
with surrounding development;
b) does not present an appearance of excessive
bulk to adjacent properties, roads or other
areas in the vicinity of the site;
c) maximises the retention of existing vegetation
and allows soft landscaping between
buildings;
d) allows for adequate area at ground level for




                                      BRSS6220.000 Report for Lodgement                            19

Page 22

    LANDPARTNERS


    outdoor recreation, entertainment, clothes
    drying and other site facilities; and
    e) facilitates onsite stormwater management and
    vehicular access.

     Compliance

     06 Not Applicable - The proposal is for a residential subdivision.

      07Site cover -
     a) for a class 1 or class IOa structure within the
     Detached Housing Zone, does not exceed-
     i for a single storey building - 50%; or
     ii for a building of 2 or more storeys - 50%
     on the ground floor and 30% for the upper
     storey(s), or 40% for all storeys for a
     building of 2 or more storeys;
     b) for other classes within the Detached House
P    Zone does not exceed 40%;
     c) for the Semi-Attached Housing Zone does not
     exceed 40%;
     d) for the Attached Housing Zone does not
     exceed-
     nn SunshineBeach35%; or
     ii otherwise-40%; or
     e) for the Visitor Mixed Use Zone does not
     exceed 35%
      f) for the Community Services Zone does not
     exceed 50%

     Compliance

     07 Not Applicable - The proposal is for a residential subdivision.

     08 For Multiple Housing Type 2 buildings have
     a maximum plot ratio of-
     b) 0.6:1 if in the Attached Housing Zone located
     in Sunshine Beach or
     c) 0.45:1 otherwise.

     Compliance

     08 Not Applicable - The proposal is for a residential subdivision within the Detached Housing
     Zoning.

     09 For Multiple housing Type 3 or 4, Visitor
     accommodation Type 4 or the accommodation            No solution provided
     unit component of an Entertainment and dining
     business Type 3 (hotel)-the maximum gross
     floor area is equivalent to the maximum
     allowable  population  density  in persons
     multiplied by 40m2, provided that Lots 75-77 on
     P9311 Heron Street, Peregian Beach, have a
     maximum gross floor area of 1,200rn2.


     Compliance

     09 Not Applicable - The proposal is for a residential subdivision within the Detached Housing
     zoning.




                                           BRSS6220.000 Report for Lodgement                  20

Page 23

    LANDPARTNERS


     010 For the Neighbourhood Centre Zone the
     maximum plot ratio is as follows-                    No solution provided
     a) 0.8:1 for site areas up to and including
     2000m2; and
     b) 0:3:1 for that area of a site in excess of
     2,000m2.

     Compliance

     08 Not Applicable - The proposal is for a residential subdivision within the Detached Housing
     zoning. .

     flooding and drainoge63                             511. 1 For new buildings or structures or
     011 Buildings and other works are designed          additions of more than 50m2 gross floor area
     and sited to-                                       to an existing building or structure, floor
     a) provide flood free access to premises and        levels for habitable rooms are-
     flood free habitable areas;                         a) for areas where minimum floor levels
     b) allow only minor, short term and infrequent      are available-not less than the
E    flooding of non-habitable areas; '                  specified level;
     c) ensure carparking areas can be adequately        b) for areas where flood modelling is
     drained;                                            available-a minimum of 500mm
     d) ensure drainage does not adversely impact         above the modelled flood level; and
     upon other premises; and                             c) for areas where flood modelling is not
     e) ensure filling or excavation does not
     adversely impact upon other premises by-            the highest known flood level;
     i. causing ponding on the site or nearby            AND
     land;                                               S11.2Where Council infrastructure is
     ii. increasing flooding, which adversely            available-
     affects the safety or use of any land               a) any drainage (for buildings and land)
     upstream and downstream;                            flows to that infrastructure; and
     iii. adversely affecting the flow of water in       b) the infrastructure has the capacity to
     any overland flow path; and                         accept any additional loading.
     iv. falling towards the frontage or other           AND
     boundaries without sufficient retention             511.3 Car parking and maneuvering areas
                                                         are constructed at a level that permits the
                                                         parking area to drain from the site by gravity
                                                         means, without the need for mechanical
•                                                        pumping; or
                                                         511.4 Basements for residential uses have
                                                         flood immunity above the Q 100 where
                                                         alternative means to mechanical pumping
                                                         are used to achieve such immunity; or
                                                         511.5 Basements for non-residential uses
                                                         have flood immunity above the Q100 that
                                                         may be achieved by means of mechanical
                                                         pumping where the mechanical feature is
                                                         installed with adequate holding tanks and an
                                                         alternative back up power source._


     Compliance

     011 Not Applicable - The proposal is for a residential subdivision within the Detached Housing
     zoning.
     Roof form                                        512.1 The main roof of the building has a roof
                                                      pitch no less than 5 degrees and has
     012 Roof forms-                                  minimum 600mm eaves to at least 75% of
                                                      the perimeter of the building;
     a) contribute positively to the local skyline;   AND
     b) complement the beachside character of the     512.2 Buildings and structures do not include
     locality;




                                            BRSS6220.000 Report for lodgement                             21

Page 24

          LANDPARTNERS



           c) use soft and articulated pitched or curved roof   roof top terraces.
           forms;
           d) avoid low pitched (eg. less than 5 degrees) or
           box profiles/parapets; and
           e) do not create opportunities for residents to
           overlook the private open space areas of
           neighbouring properties.

           Compliance

           012 Not Applicable - The proposal is for a residential subdivision within the Detached Housing
           zoning.
           Sloping sites                                        513.1 Buildings and associated
            013 Development on sloping site                     accessways are not constructed on land
           a) is responsive to the natural topography of the    with a slope greater than 1 in 4 (25%);
           site and minimises cut and fill;                     AND
           b) does not visually dominate the hill slope or      513.2 Buildings are of split level design that
           interrupt the skyline;                               step down the slope or have suspended
P          c) is integrated with the natural site               floor construction;
           characteristics including vegetation; and            AND
           d) for Multiple housing, takes the form of small     513.3 Cut or fill is less than 2m in depth;
           separate buildings.                                  AND
                                                                513.4 The distance between the ground
                                                                and the lowest part of the floor of the
                                                                building does not exceed 3m to avoid large
                                                                under-building areas;
                                                                AND
                                                                513.5 Buildings present no more than-
                                                                a) if in the Visitor Mixed Use Zone - 3
                                                                storeys at any one point when viewed
                                                                from the street; or
                                                                b) if in any other Zone - 2 storeys at any one
                                                                point when viewed from the street

           Compliance

           S13.1 Complies - The proposed access easement does not exceed a gradient of 25%.
• 513.2 Not Applicable - The proposal is for a residential subdivision.
           Si 3.3 Complies - The proposed cut/fill will not exceed 2m in depth.
           S13.4 Not Applicable The proposal is for a residential subdivision.
          Al 3.5 Not Applicable T"e orooo;.^l --or :i residential subdivision.


            7.11 Environment, Conservation and Recreation

           Environment and cultural heritage values
            014 There are no significant adverse effects on     No solution provided
           biodiversity, natural vegetation, native fauna
           habitat, landscape quality, water quality or
           cultural heritage values, including those related
           to-
           o) changes to natural drainage;
           b) changes to natural coastal processes;
           c) disturbance of the dune system and wetland
           system;
           d) management of landslide and fire risk;
           e) erosion and the transport of sediments off
           site;
           f) unmanaged public access;
           g) effluent disposal64;
           h) changes to fauna habitat and behaviour; and




                                                 BRSS6220.000 Report for Lodgement                               22

Page 25

     k NRP!!TNERS


         i) disturbance of buildings and features,
         including natural features of cultural heritage
         significance.

         Compliance

         014 Complies - The proposed development does not propose significant adverse effects on the sites
         biodiversity, natural vegetation, native fauna habitat, landscape quality, water quality or cultural
         heritage.

         The attached vegetation assessment identifies the site as containing a low ecological value for the
         following reasons;

              •   it does not form a intact floral community
              •   it there is no contiguous canopy
              •   there is no linkage to other vegetation
              •   the area is highly modified
              •   it is very close to dwellings
              •   the trees are unlikely to be used for roosting or nesting
              •   the species have a low to modest source of food for birds and other animals
              •   pets        by land owners will deter wildlife
              •   With the existing land management it is probable the endemic trees would be displaced by
                  exotic flora as they die from natural causes

         The site does not contain any cultural heritage. The development proposes a significant amount of
         replanting which improves the landscape quality. The proposal does not alter the natural drainage
         natural coastal processes of the subject site. The proposal does not alter the dune system or a
         wetland. The attached landslide and bushfire reports identify the site as low risk. The erosion and
         sediment control is considered to minimal given that no excavation is proposed other than servicing
         trenches are proposed. This can be appropriately conditioned through siltation fencing.

         Open space network                                        515.1 Open space corridors and existing native
         075 An integrated open space network is                   vegetation in areas indicated in Schedule 5 -
Pi       established, enhanced and protected throughout            Map 4 are protected from fragmentation and
         the locality to-                                          encroachment by development. native vegetation
         a) provide for both passive and active                    in areas indicated in Schedule 5 - Map 4 are
         recreational pursuits;                                    protected from fragmentation and encroachment
         b) provide connectivity for pedestrians and               by development.
         cyclists,
         c) provide habitat connectivity for wildlife;
         d) protect watercourses and drainage lines;
         e) protect vegetation on steep slopes; and
         a) form a scenic backdrop
         Compliance
         S15.1 Complies - The subject site does not contain any vegetation identified on Map 4 of Schedule
         5.
         Pedestrian and bicycle pathways                           516. 1 Pedestrian and bicycle pathways are
         076 Safe and convenient pedestrian and bicycle            provided and retained where indicated in
         pathways are provided and retained between                Schedule 5 - Map 2;
         and                                                       AND
         throughout key destinations including-                    576.2 Contributions toward a Pathways
         a) an east-west link between the beach and the            Network are provided in accordance with PSP20.
         northern end of Lake Weyba via Burgess
         Creek;
         h) a north-south link between the Noosa




                                                  BRSS6220.000 Report for Lodgement                          23

Page 26

     LAN I ARTNERS


      National Park to the north of the locality and
      the former Shire boundary near Peregion
      Beach; and
      c) links within and around Sunrise and Sunshine
      Beach linking business and community uses
      with residential development.
      Compliance
      016 Not Applicable - The proposal is for a residential subdivision.
      Beach access points
      017 Access points to the sensitive foredune           No solution provided
      systems are defined and controlled by the
      establishment of key access nodes which are
      designed and sited having regard to the
      potential adverse impacts on-
      a) visual amenity;
      b) dune stability;
      c) natural habitat; and
      d) water quality;
fl    AND



      Compliance

      0 17 Not Applicable - No beach access proposed as part of this development.

      018 Access to the foredune system and
      beachfront is via formalised communal beach           No solution provided
      accesses, rather than individual informal tracks.

      Compliance

      018 Not Applicable - No beach access proposed as part of this development.

      Aircraft safety65                                     519.1 Uses involving disposal of putrescible
      019 Wildlife, including birds and bats, are not       waste are not located within 13km of the
      attracted into the operational airspace of the        Sunshine Coast Airport; (See Map M7-1 below)
      Sun;iune Coast Airport in significant numb^3rs;
      Compliance
      019 Not Applicable - The application is for a residential subdivision.
      020 Physical obstructions do not adversely affect    520. 1 Uses involving aviation activities, including
      the operational airspace of the Sunshine Coast      parachuting and hot air ballooning, are not
      Airport;                                             located within 15km of the Sunshine Coast
                                                          Airport; (See Map MA2 below)                      ---
     Compliance
     020 Not Applicable - The application is for a residential subdivision.
     021 Emissions do not significantly affect air        521. / None of the following is permitted within
     turbulence, visibility or engine operation in the    15km of the Sunshine Coast Airport- smoke,
     operational airspace of the Sunshine Coast          ash, steam, dust or gaseous plumes exceeding
     Airport.                                            4.3m Per second. (See Map 7-2 below)
      Compliance
      021 Not Applicable - The application is for a residential subdivision.
      Division 16-Specific Outcomes and Probable Solutions for the Detached Housing Zone
      7.12 Consistent Uses



      022The following defined uses and use classes
      are consistent uses and ore located in the            No solution provided
      Detached Housing Zone-
      a) Commercial business Type 1 if an estate




                                            BRSS6220.000 Report for Lodgement                             21t

Page 27

    sales office
    b) Home-based business Types 1 or 2;
    c) Detached house;
    d) Community residence;
    e) Multiple housing Type 1;
    f) Visitor accommodation Type 1; and
    g) Visitor Accommodation Type 4 if a visitor
    hostel on Lot 163 on RP897370, Pacific
    Avenue, Sunshine Beach

    Compliance

    022 Complies - The development is for a residential subdivision and the proposed allotments will
    ultimately be development residential dwellings.

    7.13 Inconsistent Uses


C   023The following defined uses and use classes
    are inconsistent uses and are not located in the   No solution provided
    Detached Housing Zone-
    a) All Agricultural Uses;
    b) Commercial business unless Type 1 and
    an em-re sates offl^;
    c) Entertainment and dining business;
    d) Home-based business Type 3;
    e) Industrial business
    f) Retail business;
    g) All Community Uses;
    h) All Infrastructure Uses;
    i) Ancillary dwelling unit;
    j) Multiple housing Types 2, 3, 4 or 5;
    k) Visitor accommodation Types 2 or 3; and
    I) Visitor Accommodation Type 4 if not a
     visitor hostel on Lot 163 on RP897370,
    Pacific Avenue, Sunshine Beach.


    Compliance
E

    023 Complies - The proposed use is not located above.

    7.14 Effects of Use



    Visitor Hostel
    024 Lot 163 on RP897370, Pacific Avenue,           No solution provided.
    Sunshine Beach is used as Visitor
    accommodation Type 4 exclusively for a visitor
    hostel.


    Compliance

    024 Not Applicable - To this application.

    7.15 Built form



    Streetscape character and visual amenity           525. 1 For buildings and other structures-
    025 Buildings and other structures provide for     a) the maximum wall length is 15m; and
    visual interest and amenity by-                    b) each external wall plane incorporates at least




                                         BRSS6220.000 Report for Lodgement                          25

Page 28

      LANDPARTNERS



       a) staggering or separating continuous walls         one design element to add visual interest and
       into smaller sections to vary the elevation;         amenity such as windows, pergolas, sun shading
       and                                                  devices, ba/conies or a change of building
       b) providing well articulated building forms         material.(See Figure 7.1 which illustrates how a
       with strong vertical design features.                combination of design features such as varying
                                                            materials,   finishes, horizontal    and    vertical
                                                            articulation, break up building bulk and create
                                                            interest and shadow lines. Awnings create
                                                            interest and the roof profile aims to reduce
                                                            building bulk by sloping to perimeter gutters).
       Compliance
       S25.1 Not Applicable - The development is for a residential subdivision.
       026 Buildings and structures-                        526.1 The main entrance of the building faces
       a) are at a scale and nature complementary           and is recognisable from the street;
       and respectful to the surroundings;                  AND
       b) maintain the visual amenity of adjoining          Figure 7.1-Use of design features to break up
       and surrounding development;                         building bulk
       c) are designed to address the street and
       contribute positively to the streetscape
       character; and
       d) are not visually dominated by garages or
       carports.
       AND
       Compliance
       S26.1 1 Not Applicable - The development is for a residential subdivision.
       027 Buildings give the physical appearance of
       being one detached house.                           527. 1 No solution provided



       Compliance

       027 Not Applicable - To this application.

       Garages and carporis                                 528. 1 Garages and carports-
       028 Garages and carports are designed and            a) have a front boundary setback of at
       sited to visually integrate with the building and    least 6m; and
       avoid dominating the street.                         b) adopt a roof form and building style similar to
                                                            that of the building; and
P J
                                                            c) present a minimum width to the
                                                            streetscape (the total width of
                                                            garage doors is no more than 6m or
                                                            50% of the frontage width,
                                                            whichever is the lesser, where the
                                                            structure faces the street); or
                                                            d) that are visible from, but do not face
                                                            the street, include windows or other
                                                            articulation and have a 6m landscaped buffer
                                                            between the structure and the road frontage.


       Compliance

       028 Not Applicable - To this application.




                                              BRSS6220.000 Report for lodgement                            26

Page 29

    LANDPARTNERS


    Reconfiguring a Lot Code

     column 1                                              column 2

     Specific Outcomes                                     Probable solutions (if code assessable)


    1 14.183 Lot Size and Dimensions

      01 Lots have the appropriate area and                S1.1 If for reconfiguration other than community
     dimensions to provide for-                            title subdivision,   Council   will   require the
     a) the intended use and, if not intended to be        following-
     used by the Council or State for community            a) Minimum lot area and minimum average
     infrastructure, conservation purposes or              width consistent with the relevant provisions of
     public utilities including road widening are not      Table 14-68; and
     less than the minimum sizes specified in              b) If for residential development-
     Table 14-68; and                                      1) the minimum house site area is not less than
     b) if for residential development-                    that specified in Table 14-69; and

C    s) a house site area of not less than that
     specified in Table 14-69; and
                                                           ii) if not in a sewerage service area
                                                           disposal area is provided.
                                                                                                   effluent

     ii) if not within a sewerage service area,
     an effluent disposal area;
     c) if for community title subdivision, the minimum
     lot sizes for the intended use are not less than
     identified for the relevant zone specified in
     Table 14-68;
     d) siting and construction of buildings to
     minimise risk of soil erosion, landslide,
     flooding and bushfire;
     e) siting and construction of buildings to
     minimise detrimental impacts of effluent
     disposal and water quality impacts;
     f) retention of natural environmental values,
     including native vegetation;
     g) retention of cultural features and protect views
     to cultural features;
     h) minimisation of earthworks or retaining walls
     associated with building construction on
C    sloping sites;
     i) private and public open space and on-site
     landscaped areas; and
     j) convenient vehicle access and on-site parking,
     loading and manoeuvring areas.
     Compliance
     S1.1 Complies - The development contains a minimum lot size of 800m2 and a 17m average width
     which is consistent with the requirements in table 14-68. The residential allotments are located 100%
     above the ARI flood level. The proposed allotments are capable of achieving connection to reticulated
     sewer.

     14.184 Noosa North Shore Locality

     02 No additional lots are created within the
                                                           No solution provided.
     Noosa North Shore Locality.



     Compliance

     02 Not Applicable - To this application.




                                           BRSS6220.000 Report for Lodgement                           27

Page 30

           LANDPARTNERS



             14.185 Lake Macdonald Water Supply Catchment Area

             03 No additional lots are created within the
             Lake Macdonald Water Supply Catchment                 No solution provided.
             identified on Overlay Maps OM3.5 and OM9.5.

             Compliance

             03 Not Applicable - To this application.



             14.186 Lot layout

            04 Subdivision of land For residential                 54.7 Lots are arranged to front streets and
            development provides for a neighbourhood with          public open space;
            a                                                      AND
            strong and positive identity through-                  54.2 Rear lots have views over public open
• a) legible streets and open space networks;                      space;
            b) integrating prominent site features, including      AND
            landmarks, native vegetation and views into            S4.3 Lots intended for urban settlement are
            the design;                                            located within 1 km of retail or commercial uses
            c) the location of community, retail and               or land within a commercial zone.
            commercial facilities at focal points either
            within convenient walking distance for
            residents where the development is urban
            settlement or within reasonable vehicular
            proximity;
            d) the location of lots intended for urban
            settlement within proximity of retail and
            commercial facilities;
             e) shared use of public facilities by adjoining
             communities;
             f) enhancement of personal safety and
             minimisation of potential for crime, vandalism
             and fear by maximising opportunities for
             casual surveillance of public spaces; and
             g) establishment of a sense of place.
S            Compliance
             S4.1 Complies - The proposed development seeks to subdivision an existing rear allotment.
             S4.2 Complies - The proposed rear lots have views towards Sunshine Beach.
             A4.3 Complies -The development is located within 500m to the south of the retail and commercial
             uses on Duke Street.
             05 House site areas are-
             a) located at least 50m from any land including   No solution provided.
             within a national park, conservation park,
             state forest reserve, nature refuge,
             coordinated conservation area or wilderness
             area; and

             b) not located on steep slopes.



             Compliance

             05 Complies - Future residential dwellings can be appropriated located on the proposed allotments.
             The site is not within close proximity to a national park, conservation park, state forest reserve, nature
             refuge, coordinated conservation area or wilderness area.




                                                     BRSS6220.000 Report for Lodgement                            28

Page 31

    LANDPARTNERS



     The subject site is not located on steep slopes.

     06 Lots for residential development are designed     56.1 A variety of lot sizes and shapes is provided
     to ensure variety in residential streetscapes.       within the subdivision.
     Compliance
     S6.1 Complies - The subdivision contains a variety in lot sizes and shapes. The proposed lots range
     from 800m2 to 1053m2.
      O7The street network-                              57.1 Where involving the construction of a new
     a) has design features, which convey the primary    road, road planning and design S pports the
     function of each type of street and encourage      hierarchy and functional aspects identified in
     driver behaviour, speeds and traffic volumes that  Sections 2 and 3 of PSP5 Engineering Design
     are safe and appropriate to that function;          Standards - Roads, Drainage and Earthworks;
     b) provides a high level of internal accessibility AND
     both within the site and to external sites and      S7.2 Road and pathway planning and design is
     appropriate external connections for vehicles,      in accordance with, in order of precedence-
     pedestrian and cycle movements;                    a) Noosa Integrated Local Transport Plan;
     c) deters through-traffic from residential areas    b) Queensland Transport's Shaping Up
     and creates safe conditions for local road         c) Queensland Design Code for Residential
•    users, pedestrians and cyclists;                    Streets;
     d) incorporates street junctions and access to     d) AUSTROADS Guide to Traffic Engineering
     lots that are located and spaced to facilitate      Practice;
     safe and convenient vehicle movements;             e) Sections 2 and 3 of PSP5 Engineering
     e) provides for street widths and lengths that      Design     Standards-   Roads,     Drainage   and
     optimise the cost effectiveness of the network      Earthworks;
     and the provision of public utilities;             f) The Noosa Cycling and Walking
     f) provides for road reserve widths not less than   Network Development Plan; or
     the minimum identified Section 2.3 of PSPS         g) A combination of the principles in these
     Engineering Design Standards - Roads,              documents;
     Drainage and Earthworks;                           AND
     g) minimises the extent of earthworks required      S7.3 The achievement of multiple
     by being sympathetic to the terrain;               connections for all roads and streets
     h) has no significant adverse effects on habitat    (excluding culs-de-sac) within the
     corridors or areas of significant native           subdivision and to adjoining subdivisions;
     vegetation;                                        AND
     i) does not create noise attenuation difficulties;  57.4 Road networks provide connectivity
     j) incorporates pedestrian and cyclist crossings   between residential areas, both internally
     at intersections or where required to access       and to adjoining sites, using access roads
     high activity nodes and public transport;          AND
     k) has regard to the potential for conflict         S7.5The length of a cul-de-sac does not
     between vehicles, pedestrians and cyclists;        exceed 200m in urban areas and 500m in
     and                                                rural areas;
                                                        AND
     I) incorporates on-road cycling facilities.         57.6 The layout uses street and road
                                                        design, including variations in carriageway
                                                        width, as a traffic calming measure to
                                                        encourage lower traffic speeds. (Note:
                                                        Carriageway widths are identified in Section
                                                        2.3 of PSP5 Engineering Design Standards
                                                        - Roads, Drainage and Earthworks.)
                                                        AND
                                                        S7.70n-road cycling treatment is utilised
                                                        to provide safe and continuous movement of
                                                        cyclists along a roadway such as--
                                                        a) sealed shoulders;
                                                        b) wide kerbside lane;
                                                        c) exclusive or peak period bicycle lane;
                                                        d) advisory treatments such as Bicycle
                                                        Awareness Zone;
                                                        e) shared parking / bicycle lane;




                                            BRSS6220.000 Report for Lodgement                          29

Page 32

                                                       f) contra flow bicycle lone; or
                                                       g) bus/bicycle lane;
                                                       AND
                                                       57.8The provision of bicycle lanes at
                                                       intersections is generally in accordance with
                                                       AUSTROADS Part 14, section 5 and Manual
                                                       of Uniform Traffic Control Devices (MUTCD) Part
                                                       9.
    Compliance
    Not Applicable - No new roads proposed.
    08 The development contains a pathway system       58. 1 Subdivision design and layout provides for
    that encourages walking and cycling and            walking   and cycling routes designed and
    provides a safe environmentfor users, and is--     constructed in accordance
    a) a stable, smooth surface, including across      with-
    driveways, sections and joins;                     a) Sections 2 and 3 of PSF5 Engineering Design
    b) easily maintained;                              Standards - Roads, Drainage and Earthworks;
    c) of a width and longitudinal gradient to cater   b) AUSTROADS Parts 13 and 14; and
    for projected usage                                c) The Noosa Cycling and Walking Network
    d) inclusive of clear sight-lines for safe use;    Development Plan;
    e) be free of any obstructions such as fences,
    signage and bollards.                              AND

                                                       58.2 If within 1 km of the Pathways Network
                                                       identified on Map 2 of Schedule 5, the
                                                       subdivision design and layout includes
                                                       pathways-
                                                       a) located in accordance with the
                                                       Pathways Network identified on Map 2
                                                       of Schedule 5; or
                                                       b) linking to the Pathways Network
                                                       identified on Map 2 of Schedule 537;
                                                       AND
                                                       58.3 Pedestrian routes are planned to
                                                       provide clear, safe connections between
                                                       residential, open space, transit stops and
                                                       retail areas, and are located along, or are
                                                       visible from, streets or other public spaces;
                                                       AND
C                                                      58.4 Primary pedestrian routes border the
                                                       frontages of residential, public parks and
                                                       business uses;
                                                       AND
                                                       58.5 Pedestrian routes through parking lots
                                                       or at the rear of lots are avoided;
                                                       AND
                                                       58.6 Pedestrian and cycle path
                                                       infrastructure is designed and constructed
                                                       to-
                                                       a) have sign posting, particularly where
                                                       they are commuter and recreational
                                                       paths, and incorporate pavement
                                                       markings and line work in accordance
                                                       with AUSTROADSPart 14 Bicycles,
                                                       Section 9;
                                                       b) have navigational signs generally in
                                                       accordance with the Manual for
                                                       Uniform Traffic Control Devices Bicycle
                                                       Directional Signage Guidelines, and
                                                       Australian Standard 1742.9: 2000




                                         BRSS6220.000 Report for Lodgement                             30

Page 33

    LANDPARTNERS


                                                          Manual of Uniform Traffic Control
                                                          Devices Bicycle Facilities;
                                                          c) be clearly delineated by pavement
                                                          markings and warning signs when an
                                                          on-road bicycle lane;
                                                          d) incorporate kerb ramps at all
                                                          intersections and designated
                                                          crossings;
                                                          e) have refuge islands on all roads with
                                                          median strips;
                                                          f) have holding rails for cyclists at the
                                                          intersection of district collector, subarterial
                                                          and arterial roads that are
                                                          positioned in accordance with
                                                          Australian Standard 1 742.9:2000 -
                                                          Manual of Uniform Traffic Control
                                                          Devices Bicycle Facilities, and


C                                                         AUSTROADS Part 14 Bicycles
                                                          Section 9;
                                                          g) have marked bicycle lanes, bicycle
                                                          awareness zones or storage boxes;
                                                          and
                                                          h) 'Rr= lude li g htin g io p odosirii;im and c y cle
                                                          pathways to local government
                                                          requirements and in accordance with
                                                          Australian Standard 1583.1 Road
                                                          Lighting - Pedestrian area (Category
                                                          P) lighting.
     Compliance
     08 Not Applicable - The development is for an infill subdivision and does not propose any pathway
     systems.
     O9The subdivision layout is designed to facilitate 59. 1 Where there is no relevant approved
     linkages with adjoining sites in the immediate     master plan, concept plan, or site analysis
     area.                                              plan, subdivision design incorporates future
                                                          road, street, cycleway and pedestrian path
                                                          and open space connections to adjoining sites.

E    Compliance
     S9.1 Complies - The proposal is for an infill subdivision and proposes a logical layout.
     010 Where the lots are to be used for Industrial
     business or Commercial business uses, the            No solution provided.
     layout provides for appropriate buffer areas, to
     mitigate possible impacts on nearby residences
     or other noise sensitive uses.



     Compliance

     010 Not Applicable - The proposal is for a residential use.

     011 For lots in the Rural Settlement Zone-a
     sealed access to the nearest urban settlement is     No prescribed solution.
     available.

     Compliance

     0 11 Not Applicable - The proposed is in the Detached Housing Zone.




                                          BRSS6220.000 Report for Lodgement                                       31

Page 34

IAN l!!RTNERS



 14.187 Water supply for fire fighting

 012 An adequate and accessible water supply is        512.1 For development in a water service
 provided for fire fighting purposes.                  area, water mains within the development
                                                       shall comply with the:
                                                       a) Queensland Water Resource Commission -
                                                       Guidelines for Planning and Design of Urban
                                                       Water Supply Schemes; and
                                                       b) Australian Standard 2419 and the Water
                                                       Providers Network Model Criteria;
                                                       AND
                                                       512.2 Facilitate the connection of fire services
                                                       that comply with the requirements of the Building
                                                       Code of Australia.
 Compliance
 S12.1 Complies - The subject site will be serviced with reticulated water in accordance within the
 Queensland Water Resource Commission Guidelines for Planning and Design of Urban Water
 Supply Schemes and the Australian Standard 2419.
 Al 2.2. Complies - The proposed development will achieve connection of fire services in accordance
 with the Building Code of Australia.
 14.188 Energy efficiency                             513.1 For Community Title Development or
                                                      urban residential development each lot
  013 The street and lot orientation facilitates the contains n rertnngVlnr house city aran
 construction of energy efficient buildings that       where the long axis faces true North or is no
 respond to the local climate conditions.              more than 20 degrees off true north and has
                                                       minimum dimensions of-
 AND                                                   a) if the lot is between 450m2 and 599m2-
                                                       l0m x 15m; or
                                                       b) if the lot is less than 450m2 - 9m x 1 5m.
                                                       AND
                                                       513.2 Community Title Development lots
                                                       are generally rectangular in shape and have
                                                       a maximum slope of-
                                                       a) 1 in 10 (10%); and b) 1 in 20 (5%) when
                                                       measured from the front to the rear of the lot.
 Compliance
 S13.1 Performance Solution - The proposed lot sizes are sufficient to support future residential
 dwellings that take advantage of micro climatic conditions.
 S13.2 Not Applicable - The proposed development is not a Community Title Development.
 014 For residerrlial development, the subdivision
 design provides for the maximum practicable           514.1 No Solution provided
 number of lots with house site areas that-
 a) maximise solar access to the north in winter;
 b) minimise solar access to the east and west in
 the summer;
 c) maximise access to any prevailing summer
 breezes; and
 d) minimise exposure to prevailing winter winds.



 Compliance

 014 Complies - The proposal layout features allotments which are compliant with the minimum lot
 sizes and widths and therefore future residential dwelling can be designed to take advantage of
 micro climatic conditions.




                                         BRSS6220.000 Report for Lodgement                             32

Page 35

     14.189 Infrastructure

     015 Each lot is capable of being serviced by         515. 1 All lots are connected to power supply and
     appropriate levels of-                               telecommunications services;
     a) water supply;                                     AND
     b) reticulated sewerage;
     c) stormwater drainage;
     d) power supply; and
     e) telecommunications;
     AND
     Compliance
     S15.1 Complies - The proposed allotments can achieve connection to power supply and
     telecommunication services
     016 The design and provision of public services  516.1 For lots in urban settlements-power
     and utilities, including sewerage, water,        supply and communications infrastructure are
     electricity,                                     provided underground;
     street lighting and telecommunication services-  OR
     a) meets the needs of users;                     516.2 For lots elsewhere-power supply
     b) ensures health, safety and convenience of the and communications infrastructure are
     community;                                       provided underground unless-
     c) protects the natural environmental values of  a) located in the Rural Zone or Rural
     the site and surrounds, including visual         Settlement Zone and where not in a
     amenity and native vegetation;                   Bushfire Hazard Area as defined on
     d) are cost effective over their life cycle;     Overlay Maps OM 1.4-OM9.4;
     e) minimises adverse impacts to the              b) new low voltage lines can be strung
     environment (including the amenity of the        from poles carrying existing high
     local area) in the short and long term; and      voltage lines; or
     f) ensures that the existing systems are         c) no extensions to the existing
     upgraded or relocated to be capable of           reticulation network is necessary; or
     supporting the proposed development;             d) it is necessary to cross a body of water;
                                                      AND
                                                      516.3 Street lighting is provided in
                                                      accordance with Section 3.19 of PSP5
                                                      Engineering Design Standards - Roads,
                                                      Drainage and Earthworks;
                                                      AND
                                                      516.4 For lots not within a sewerage service
C                                                     area-the lot has sufficient area and other
                                                      attributes to ensure sustainable on-site sewerage
                                                      disposal;
     Compliance
     S16.1 Complies - Services will be provided underground along the easement.
     516.2 Not Applicable - The subject site is within an urban settlement.
     S16.3 Not Applicable - The development is an infill development and street light will not be
     proposed.
     S16.4 Complies - The proposed allotment will achieve connection to the reticulated sewer service.
    F0/7 Essential public utilities are available and      517.1 Components of the infrastructure that
     maintain their function during flood events up to     are likely to fail or may result in contamination
     a 1% AEP(1:100 year AR4 flood event.                  are-
                                                           a) located above the level of a 1 % AEP
                                                           (1 :100 year AR4 flood event; or
                                                           b) designed and constructed to exclude
                                                           water inundation or infiltration and resist
                                                           hydrostatic and hydrodynamic forces as a result
                                                           of inundation.
     Compliance
     517.1 Not Applicable - To this application.




                                           BRSS6220.000 Report for Lodgement                           33

Page 36

Electricity supply infrastructure                     518.1 Building footprints are situated clear
018 Uses and works maintain a safe distance           of any power easements on-site;
from electrical infrastructure including              AND
substations, overhead power lines, power poles        518.2 Building footprints are not less than
and transformers.                                     50m from an existing fenced electricity
                                                      substation.
Compliance
Al 8.1 Complies - No power easements are locate d on-site-
S18.2 Complies - There is no fenced electricity sub station within close proximity.

14.190 Earthworks and stormwater management

019Stormwater run-off is managed so as not to
cause any adverse impacts on the built or natural     No solution provided
environment including changes in quality,
quantity or location of stormwater discharges.

Compliance

019 Not Applicable - The proposal does not alter the existing stormwater run-off and proposes no
additional hardstand. As identified in the attached Engineering Assessment the proposed allotment
can achieve discharge through existing outlet.



does                                                  No prescribed solution.
not adversely impact on-
a) watercourses, drainage lines and wetlands; or
b) vegetation on land identified on Biodiversity
Overlay Maps OM 1.1 -OM9.1; or

c) water levels on properties elsewhere.



Compliance

020 Not Applicable - No significant filling or exaction proposed.



14.191 Landscaping and visual amenity

021 Land development responds to the                  521.1 The natural landform and landscape are
distinctive landscape character of the site by        not modified to accommodate the development.
utilising the natural features of the site, which
include-
a) watercourses and drainage lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and
e) views.


Compliance

S21.1 Complies - The proposal does not alter the and form and landscape.
022 Native vegetation, including individual       522.1 Buffersof existing native vegetation
mature trees are retained, protected, maintained  around site boundaries and environmentally
and supplemented, with particular consideration   sensitive areas are retained and reinforced
given to-                                         through additional planting;
a) roadsides;                                     AND
b) the amenity of adjoining land uses; and        522.2 For reconfiguring in the Rural Zone and
c) the protection of environmentally sensitive    Rural Settlement Zone- a) a l0m landscaped




                                        BRSS6220.000 Report for Lodgement                            34

Page 37

              LANDPARTNERS


          I    areas.                                             buffer area is provided along road frontages;

                                                                  b)    clearing      and disturbance to vegetation is
                                                                  minimised around road works, laying of services
                                                                  and     utilities     and   construction   of   property
                                                                  entrances;

                                                                  c) revegetation of disturbed areas occurs after
                                                                  completion of works; and

                                                                  d) planting of clusters of trees along the
                                                                  road reserves to form a tree canopy cover is
                                                                  provided
           Compliance
           S22.1 Performance Solution - The existing site containing only two remnant trees. The proposal seeks
           to remove these trees, however proposes significant amount of replanting as detailed in the
• Vegetation Assessment prepared by BioTrack Pty Ltd.
           S22.2 Not Applicable - The site is within the Detached Housing Zone.
           023 Buildings and other structures do not have a     523. 1 All lots include a building envelope
           significant adverse impact upon the visual           that enables buildings and structures to be
           amenity of surrounding areas.                        sited so they do not-
                                                                a) protrude above ridgelines; or
                                                                b) result in the unnecessary removal of
                                                                vegetation from the site.
               Compliance
               523.1 Performance Solution - The proposed allotment comply with the minimum size and width
               dimensions and it is reasonable to assume that each lot can adequately support a appropriately sized
               residential dwelling.
               14.192 Open space and environmental protection
               024 Public open space provides for a diverse        524. 1 A minimum of 10% of the total site
               range of passive and active quality recreational    area, is provided as public open space;
               opportunities including sport to meet the outdoor   AND
               recreational needs of the community.                524.2 Active Park/and or open space
                                                                   linkage to Active Parkland is provided within
                                                                   500m of all residential, commercial or
                                                                   industrial allotments;
                                                                  AND
                                                                   524.3 Active Parklandis provided within 5km
                                                                   of allotments within the rural settlement zone.
                                                                  OR
                                                                  524.4 Park contributions are paid in
                                                                  accordance with PSP12 Public Open Space
                                                                  Contributions;
                                                                  S25.1 A park has direct road frontages of a
                                                                  minimum of 25% of the total allotment
                                                                  boundary of the park to provide physical
                                                                  access and visibility;
                                                                  AND
                                                                  525.2 Land intended for public open space
                                                                  complements existing adjacent and
                                                                  surrounding open space areas and physical
                                                                  linkages to these areas are provided;
                                                                  AND
                                                                  525.3 Open space is provided adjacent to
                                                                  watercourses, with roads servicing the linear
                                                                  parkland and lots located on the opposite
                                                                  side of the road to the watercourse.
                                                                  AND




                                                   BRSS6220.000 Report for Lodgement                                 35

Page 38

     LANDPARTNERS



                                                          S25.4 Public open space has good
                                                          connectivity for users via pedestrian and
                                                          cycle paths.
      Compliance
      S24.1 Not Applicable - The proposed development is for an infill subdivision and the provision of
      public open space is not required.
      S24.2. Not Applicable - The proposed development is for an infill subdivision.
      S24.3 Not Applicable - The proposed development is for an infill subdivision.
      S24.4 Performance Solution -- Infrastructure Contributions will be paid in accordance with the
      Adopted Infrastructure Charges Strategy 201 1.
      026 Land provided for active ecreation areas is   S26.1 Active parkland is of a compact shape
      of a physical standard and condition suitable for free of irregular boundaries;
      the intended uses and is not subject to physical  AND
      other constraints including contamination,        S26.2 Active parkland is located on land
      environmental or biophysical constraints or       that is exclusive of-
      legislative protection that would encumber its    a) flood inundation below the 20% AEP
      use.                                              (1:5 year ARI level);
                                                        b) land affected by stormwater or
                                                        overland flow discharge from adjacent
                                                        allotments;
                                                          c) drainage reserves and detention
                                                          basins, which cannot be shown to
                                                          safely and effectively contribute to the
                                                          , emwo. k of pm ks a, id open space
                                                          areas;
                                                          d) land with a slope, or subject to cut and
                                                          fill with a batter slope, that exceeds a
                                                          slope of 1 in 67 (15%);
                                                          e) areas of land less than 15m wide, such
                                                          as access and service and utility
                                                          easements;
                                                          f) land required to serve primarily as a
                                                          buffer area to any existing development
                                                          or major transport corridor; and
                                                          g) power easements;
                                                          AND
                                                          S26.3 At least 10% of the total open space
                                                          provision for active parkland is exclusive of
fl
                                                          flood inundation below the 11% AEP (1:100
                                                          year ARI level or the highest recorded flood
                                                          level, whichever is the greatest;
                                                          AND
                                                          S26.4 Recreational facilities (including
                                                          playgrounds, pergolas, barbeques etc.) are
                                                          setback a minimum of 30m from the top of
                                                          the bank of any watercourse and 1 Om from
                                                          the top of the bank of any drainage line;
      Compliance
      026 Not Applicable - No parkland is proposed by this development.
      027 Active park/ands will provide a diverse         27.1 Active park/and in all areas except industrial
      range of recreational opportunities for all age     areas will contain at least:
      groups and are designed as attractive and           a) children's play facilities catering for
      enjoyable, functional and safe places to recreate   various ages;
      and meet.                                           b) a soft fall surface where required;
                                                          c) a shade cover over any play equipment;
                                                          d) picnic table/s with seats;
                                                          e) seating;
                                                          f) landscaping;
                                                          AND




                                          BRSS6220.000 Report for Lodgement                               36

Page 39

    LANDPARTNERS


                                                         27.2    Landscaping is              designed    to   create
                                                         ^.wn c n^.uur   r.J^G4^u   iy   -H." i ^F-u Lu c/+3 a.u w rv

                                                         suit   the type, setting and purpose of the
                                                         particular park.
    Compliance
    027 Not Applicable - No parkland is proposed b this development.
    028The natural environmental and cultural        528.1 Land in the Open Space Conservation
    values of land in the Open Space Conservation    zone is retained in one contiguous lot.
    Zone are not adversely affected by subdivision,
    and land in freehold tenure in this zone is not
     subdivided.
     Compliance
    S28.1 Not Applicable - The development does not contain any land within the Open Space
    Conservation zone.
    029 Lands with high biodiversity values which 529.1 Lands with high biodiversity values
    warrant conservation status are formally      are transferred to public ownership.
     protected for the long terra.
    Compliance
P   S29.1 Not Applicable - The land does not contain high biodiversity values.
    030 Buffers are provided incorporating             530. 1 A buffer of no less than 5m is
    development setback/s from the stream that will    provided to all development adjacent to
    ensure that the development does not result in a   either Stream orders 1, 2 or 3 where not
    negative impact upon the long-term viability of    within the Riparian Buffer Area on the
    the stream.                                         io iversi y Overlay Maps (with
                                                       measured from the centreline of the stream).
     Compliance
     530.1 Not Applicable - No streams are located on the subject site.


    14.193 Road and rail corridors
    031 Lots for residential development are not         531.1 Lots intended for residential
    subjected to high traffic noise levels from the      development are separated by a minimum
    major road network or rail corridors.                of-
                                                         a) 40m from the property boundary of roads
                                                         within the major road network; and
                                                         b) 80m from the property boundary of rail
                                                         corridors;
                                                         OR
E                                                        531.2 Development in the vicinity of road
                                                         corridors meets the following external design
                                                         criteria for roads in the major road network-
                                                         54dB(A)L10 (l8hours) based on predicted traffic
                                                         volumes ten years hence;
                                                         OR
                                                         531.3 Development in the vicinity of rail
                                                         corridors meets the following external design
                                                         level noise criteria-
                                                         a) 65dB(a), assessed as the 24hour
                                                         average equivalent continuous Aweighted
                                                         sound pressure level; and
                                                         b) 87dB(A), assessed as a single event
                                                         maximum sound pressure level.


    Compliance
    S31.1 Complies - The site is over 40m from a major road network and over 80m from a property
    boundary of a rail corridor.
    S31.2. Complies - The subject site is not in the vicinity of a road corridor and meets the external
    noise criteria.
    S31.3. Complies - The subject site is not in the vicinity of a rail corridor.




                                          BRSS6220.000 Report for Lodgement                                    37

Page 40

     14.194 Access easements
     032Access easements are in appropriate           532.1 Access easements are designed in
     locations for safe access and egress, and supply accordance Sections 2 and 3 of PSP5
     appropriate widths and levels of service for the Engineering Design Standards - Roads,
     number of vehicles that will utilise them.       Drainage and Earthworks.
     Compliance
     S32.1 Performance Criteria - The proposed allotments achieve access via a 5m access easement
     running along the southern boundary of the adjoining Lot 1 on RP234161. The development
     illustrates a high degree of compliance with Planning Scheme Policy 5 - Engineering Design
     Standards and provides safe access and engress and a suitably sized easement to service the
     proposed allotments.

     The proposed easement contains a gradient of less than 204, and a width of 4.5m-5m. This is
     consistent with the PSP5.

     The easement caters for three allotments in total which is acknowledged to marginally exceed the
     PSP5 standards; however based on 7 vehicle movements per day (vpd) per allotment the
     development totals 21 vpd. This only exceeds the 20vpd requirement by 1 and should be
     considered appropriate in this instance.
     14.195 Traffic
     033 Traffic generated by the development is         533. 1 Any required upgrading of external
      within the acceptable capacity of external roads   roads to the necessary standard to cater for
      and does not have an adverse impact upon the       the expected traffic numbers is undertaken
    '_nlnctiorrr .                    4t.
      Compliance
    ^ S33.1 Complies - Any required upgrading of external roads to the necessary standard to cater for the
      expected traffic numbers is undertaken at no cost to Council.

     No upgrading is expected to be required.
     14.196 Noosa Trail Network
     034A comprehensive network of trails is             534.1 The proposal includes linkages to
     established incorporating road reserves, State      existing or planned components of the
     forests, Council owned land and private lands       Noosa Trail Network (refer Schedule 5, Map
     consistent with the lifestyle and outdoor           3-Noosa Trail Network);
     recreation needs of the Shire's residents and       OR
     visitors.                                           534.2 The proposal includes linkages
                                                         between existing or planned components of
                                                         the Noosa Trail Network (refer Schedule 5,
E
                                                         Map 3-Noosa Trail Network).
     Compliance
     034 Not Applicable - To this application.
     035The proposal does not have an adverse            535. 1 Existing or potential pedestrian,
     impact on the Noosa Trail Network.                  horse trail or bicycle movement linkages are
                                                         retained or enhanced; or
                                                         535.2 Alternative linkages are provided;
                                                         AND
                                                         535.3 Linkages and associated
                                                         infrastructure are designed, located and
                                                         constructed in accordance with-
                                                         a) Australian Standard 2156.1 Wa/king
                                                         Tracks Part 1: Classification and
                                                         Signage to a minimum of a Class 4
                                                         Standard; and
                                                         b) Australian Standard 2156.2 Wa/king
                                                         Tracks Part 2: Infrastructure Design.


     Compliance
     035 Not Applicable - To this application.




                                           BRSS6220.000 Report for Lodgement                            38

Page 41

     /
         LANDPARTNERS
         evm .n.^.•..•.^ v.n•mdni.




           14.197 Cooroibah Locality
           Protection of existing residential amenity, road      536. I Each new allotment in the Rural
           safely and access points                              Settlement Zone has 1 ha free of flood
           036 The existing residential amenity of the estate    hazard or biodiversity values as indicated on
           is maintained without impacting on the natural        overlay maps OM2.1 and OM2.3;
           landform and landscape;                               AND
           AND                                                   536.2 House site areas on adjoining lots
                                                                 are separated by not less than 50m.


           Compliance
           036 Not Applicable - To this application.

           037The number of access points providing              537. 1 Shared driveways are provided;
           access to lots from McKinnon Drive is maintained      AND
           or reduced.                                           537.2 No additional driveways are provided
                                                                 from McKinnon Drive


           Compliance
Pi         037 Not Applicable - To this application.


           Table 14.67-Community title development
           Compliance
           Not Applicable - To this application.




         Landscaping Code

         The Landscaping Code is not considered relevant in this instance given that the proposed
         development is for a Reconfiguration of a Lot application. Any future development on the site will
         require compliance with the Landscaping Code. A Vegetation Assessment has been included as
         part of this application which contains details about the proposed replanting (Appendix F).



         Engineering Works Codes

           column t                                              column 2

           Specific Outcomes                                     Pro bable solutions (i1 cods asce cabI4


           Driveways and Carparking Code



           14.113 General

           07 Vehicular access does not adversely impact         51.1 Vehicular access is located and designed in
           on safety, capacity and operations of the existing    accordance with AUSTROADSGuide to Traffic
           or planned road network, the proposed                 Engineering Practice requirements for sight
           driveway, cycleways or pedestrian pathway             distance and Section
           systems.                                              3 of AS2890. 1 Parking facilities;
                                                                 AND
                                                                 51.2 Only one footpath crossing is provided;
                                                                 AND
                                                                 51.3 Driveways, other than within any
                                                                 setback have a maximum grade in
                                                                 accordance with Section 3 of AS/NZS 2890.1




                                                   BRSS6220.000 Report for Lodgement                             39

Page 42

LANDPARTNERS


 Compliance
 S1.1 Complies - The existing site access remains.
 Si .2 Complies - Only one footpath crossing is proposed.
 S1.3 Complies - The driveway grade is in accordance within AS2890.1
 02 Driveways and crossovers-                        52.1 Design of the driveway across the
 a) are suitable and safe for their intended use;   footpath is in accordance with Council's
 and                                                Standard Drawings 9002 or 9005 as
                                                    appropriate for the particular type of
 b) match Council infrastructure.                   development as annotated on the drawings;
                                                    AND
                                                     52.2 Driveways are designed and
                                                    constructed in accordance with Council
                                                    Standard Drawings 9014, 9019, 9020,
                                                    9021, as appropriate for the particular type
                                                    of development as annotated on the drawings;
                                                    AND
                                                     S2.3 The change in grades in the driveways and
                                                    ramps is in accordance with Section 3 of
                                                    AS2890. 1 Parking Facilities.
 Compliance
 S2.1 Complies - The existing driveway access remains.
 S2.2 Complies - The existing driveway access remains.
 S2.3 Complies - The existing driveway access remains.


 driveways across pedestrian footpaths is              commercial zoned areas include shared
 minimised,                                            driveways and parking areas;
                                                       AND
                                                       53.2 Driveways are located so they abut
                                                       existing driveways of adjoining
                                                       development where practicable and
                                                       reciprocal easements are created to reduce the
                                                       sealed driveway width.
 Compliance
 S3.1 Not Applicable - The site is in a residential zone.
 S3.2 Complies - The existing driveway location remains.
 O4 Vehicular access does not adversely impact         54. 1 Footpath and kerb crossings are
 on the capacity, operations and maintenance of        located clear of existing stormwater inlet
 the existing infrastructure;                          structures, water and sewerage
                                                       infrastructure fittings, any other exiting utility
AND                                                    infrastructure, existing landscaping and
                                                       vegetation.
 05 Vehicular access does not adversely impact
 on the integrity of existing landscaping or native    55.1 No solution provided
 vegetation.
Compliance
S4.1 Complies - The existing footpath crossing remains and is clear of existing stormwater inlet
structures, water and sewerage infrastructure fittings, any other existing utility infrastructure, existing
landscapn and ve etation.
06 Driveway run-off is filtered prior to leaving      S6. 1 For-
the premises.                                         a) Ancillary dwelling unit, Multiple housing Types
                                                      1 or 2 if less than 5 carparking spaces, Visitor
                                                      accommodation Type 1 and Homebased
                                                      business Type 3-the driveway is formed to drain
                                                      to landscaped areas; and
                                                      b) for other uses-grease and oil arrestors or
                                                      stormwater quality improvement devices are
                                                      incorporated into the design to treat run-off prior
                                                      to run-off exiting from the premises.




                                       BRSS6220.000 Report for Lodgement                                    40

Page 43

,3   LANDPARTNERS


      Compliance
      S6.1 Not Applicable - The application is for a residential subdivision.

      Table 14-50 - Carparking and manoeuvring

      O7Sufficient carparking is provided to                S7.1 The number of parking and loading
      accommodate the number and type of vehicles           bays is not less than the minimum number
      likely to be generated by the development having      specified in Table 14-51 Vehicle Parking
      regard to the specifics of the use including-         Requirements;
      a) the type and intensity of land use;                OR
      b) any existing parking available on the site;        S7.2 If insufficient carparking spaces are
      c) hours of operation;                                provided on-site a monetary contribution is
      d) likely numbers of users;                           made to Council in accordance with Section
      e) the peak parking demand periods of uses on         6 of PSPI 3 Contributions in lieu of provision of
      the site; and                                         off-street carporking.

      f) the availability of alternative carparking.

      Compliance
      O7Not Applicable - The application is for a residential subdivision.
      08The layout of the development provides             58.1 Parking bays, manoeuvring areas,
      adequate, clearly defined and easily accessible-     queuing areas, loading, setdown and
      a) on-site vehicle parking and manoeuvring           pickup areas and driveways are designed
      areas; and                                           to the standards set out in Sections 2 and 3
      b) loading and manoeuvring areas for delivery        of Australian Standard AS 2890.1 Parking
      and service vehicles                                 Facilities (Part 1: Off-street Carparking) and
                                                           AS 2890.2 - Off-street Parking (Part 2:
                                                           Commercial Vehicles);
                                                           AND
                                                           S8.2The number of loading bays is not
                                                           less than the minimum number specified in
                                                           Table 14-51.
      Compliance
      08 Not Applicable - The application is for a residential subdivision.
      O9Parking areas are located where they will not      S9. 1 Carparking areas are accessed from
      unduly conflict with pedestrians and will not        rear laneways where practicable.
      dominate the streetscape.
      Compliance
      09 Not Applicable - The application is for a residential subdivision.
      010 Provision is made for a reasonable number        510.1 Carparking spaces are provided for
      of on site carparking spaces identified and          people with disabilities at the rate specified
      reserved for people with disabilities.               in Section 2.4.5 of AS 2890. 1 - Parking
                                                           Facilities (Part 1: Off-street Carparking).
      Compliance
      010 Not Applicable - The application is fora residential subdivision.
      071 Access and egress points do not impact on       511.1 Vehicle manoeuvring areas are
      the safety and operations of the road system.       provided in accordance with Section 3 of
                                                          AS 2890. 1 Parking Facilities (Part 1: Offstreet
                                                          Carparking) so vehicles enter and
                                                          leave the site in a forward gear.
      Compliance
      011 Not Applicable - The application is for a residential subdivision,
      O12 Parking areas are designed to -                 512.1 At locations where pedestrian and
      a) provide a progressive reduction in speed         vehicle conflicts are likely to occur -
      between the external road and internal parking      a) sight distances of at least 2.5 seconds
      spaces;                                             of travel time at the designated speed
      b) ensure lower speeds near areas of high           are provided;
      pedestrian activity through the use of              b) splayed corners on structures are
      appropriate road geometry or devices                incorporated;




                                              BRSS6220.000 Report for Lodgement                             41

Page 44

    LANDPARTNERS


     designed to limit speed; and                         c) landscaping is designed to allow clear
     c) maintain sight distances which are appropriate    views;
     for the likely operating speeds in all areas of      d) sign placement ensures that views
     potential pedestrian/vehicle and vehicle/vehicle     are not impeded;
     conflict;                                            513.1 In large open car parks with greater
     013A clearly defined pedestrian network is           than 200 car parking spaces, a pedestrian
     provided that -                                      path between parking spaces is provided
     a) is located in areas where people will choose to   on every second aisle;
     walk;                                                514.1 No probable solution identified;
     b) ensures that pedestrian movement through car      515.1 Lighting is provided in accordance
     parking areas or structures are along aisles         with Australian Standard 1158.1:1997 -
     rather than across them;                             Road Lighting - Vehicular Traffic (Category
     014 Provision is made for pedestrian and             V) Lighting - Performance Installation and
     vehicular queues at conflict points;                 Design Requirements.
     015 Par king areas are lit to provide security for
     night-time users.
     Compliance
     012 Not Applicable - The application is for a residential subdivision.
     016 I n mixed use areas of Business centres          516.1 Resident carparking is limited to one
     residents do not compete with customers for         space per dwelling unit or accommodation
     carparking spaces.                                  unit.
                                                         AND
                                                         516.2 Resident carparking is not located in

                                                          or business building and the principal street
                                                          frontage.
     Compliance
     016 Not Applicable - To this application.
     017Car parking areas are landscaped to-              No solution provided
     a) provide shade;
     b) maximise infiltration of stormwater run-off;
     c) define parking areas;
     d) reduce direct visibility of car parking areas
     from external viewpoints;
        ;often views of hardstand areas
     Compliance
.    0 17 Not Applicable - To this application.
     018 Development with the potential to generate       No solution provided
     significant traffic and parking impacts gives
     appropriate consideration to transport and land
     use issues.
     Compliance
     018 Not Applicable - To this application.
     Motor Cycles & Motor Scooters                        519. 1 For Commercial businesses,
     019 Designated Motor cycle or motor scooter          Entertainment & dining business,
     parking spaces reduce the reliance on cars.          Industrial business Types 1 and 2, Retail
                                                          business Types 2, 4, 5, 6 and 7,
                                                          Education Types 1 and 2, Open Space,
                                                          Wellbeing Uses and Transport Types 1,
                                                          2, 3 and 4 motor cycle parking spaces
                                                          accord with Planning Scheme Policy
                                                          PSP26 Motor Cycle & Motor Scooter
                                                          Parking
     Compliance
     019 Not Applicable - To this application.
     020 Carparks are designed to ensure run-off is       520.1 Grease and oil arrestors or
     treated to remove pollutants prior to leaving the    stormwater quality improvement devices
     premises.                                            are incorporated into the design to treat
                                                          run-off prior to it leaving the premises.




                                            BRSS6220.000 Report for Lodgement                             42

Page 45

LANDPARTNERS


 Compliance
 020 Not Applicable - To this application.
 021 Carparking areas are designed to ensure          No solution provided
 drainage without the use of pumps or other
 electrical apparatus.
 Compliance
 021 Not Applicable - To this application
 022 Site layout and building design provides for     522.1 Below ground components of
 soft landscaping to be established.                  buildings, including car parks, do not
                                                      extend beyond the above ground footprint
                                                      to allow for the provision of landscaping,
                                                      particularly within building setbacks.
 Compliance
 022 Not Applicable - To this application.
 Education Types 1, 2 or 3                             523. 1 Paved setdown areas are provided
 023Carporking and setdown areas are                   within the site;
 designed and located to facilitate their safe and     AND
 efficient use.                                        S23.2 For a minimum of 50% of carparking
                                                       spaces, pedestrian access to buildings is
                                                       not across or through driveways, carparks,
                                                     I setdown or manoeuvring areas;
                                                      AND
                                                      rn n n/"      1 .       1   .   I        ._




 Compliance
 023 Not Applicable - To this application.



Earthworks Code

 column 1                                             column 2

 Specific outcomes                                    Probable solutions (if aodeamwnabk)

 14.120 Effects of works
 Drainage                                             51.1 The finished surface gradient of any
 01 Finished surface levels ensure land is free       filled or excavated area is within the range
 draining.                                            0.5% to 1.5% and drains to Council's
                                                      stormwater infrastructure where available
                                                      or where stormwater infrastructure is not
                                                      available, toward the street.
 Compliance
 S1.1 Not Applicable - No filling or excavation is proposed.
 Hydraulics                                           No solution provided.
 02 Any change to the level of the land does not
 have an adverse flooding impact on the flooding
 and drainage characteristics off-site.
 Compliance
 02 Not Applicable - The level of the land does not change.
 Geotechnical considerations                         For assessable development-
 03 Earthworks do not result in geotechnical         53. 1 Filling works are undertaken in
 instability on the premises or nearby premises.      accordance with Section 2.8- Filling of Site
                                                      of Council's PSG - Engineering Design
                                                      Standards- Roads and Drainage &
                                                      Earthworks
                                                      AND
                                                      53.2Where the filling is for residential
                                                      commercial or industrial purposes the
                                                      works comply with Sections 3 to 6 of AS




                                       BRSS6220.000 Report for Lodgement                             43

Page 46

    A   LAND NakFNERS


                                                            3798 - Guidelines for earthworks on
                                                            commercial & residential development.
         Compliance
         03 Not Applicable - No filling proposed.
         Local amenity                                      S4. I The following control measures are
         04 Earthworks do not cause disturbance to the      implemented-
         amenity of the neighbouring land.                  a) regular water spraying of exposed
                                                            areas to suppress dust;
                                                            b) provision of dust stabilised or
                                                            sealed internal roads;
                                                            c) protective covering of exposed
                                                            areas that are left for more than 2
                                                            weeks; and
                                                            d) if there is no valid development
                                                            permit for the site, disturbed areas
                                                            are revegetated using species
                                                            identified in PSP3 - Landscaping
                                                            Plants and Guidelines;
                                                            AND
                                                            54.2 Earthworks are undertaken only
                                                            during the hours of lam to 6pm, Monday to
                                                            Friday and lam to 6pm on Saturday. No
                                                            work is undertaken on Sunday or public
                                                            law YS--
         Compliance
         04 Not A pp licable - No earthworks prop osed.
         Vegetative Waste                                   S5. I Cleared vegetation is transported offsite
         05 Vegetation cleared from a development site      for disposal in an approved green
         is disposed of in an environmentally responsible   waste disposal facility;
         manner.                                            OR
                                                            55.2 Cleared vegetation is mulched on-site
                                                            and reused for landscaping of the finished
                                                            development;
                                                            OR
                                                            55.3 Cleared vegetation is disposed of for
                                                            the purpose of firewood. (Note: Disposal of
                                                            vegetative waste by burning off is not an
                                                            acceptable method of disposal).
E
        Compliance
        S5.1 Complies - Any cleared vegetation will be removed off site for disposal in an approved green
        waste disposal facility.
        S5.2 Complies - The development complies with S5.1
        S5.3 Complies - The development complies with S5.1
        Managing contamination risk                       S6.1 The fill material is solid clean earth,
        06 Materials used as fill are suitable for        free of putrescible or refuse material, vegetation,
        development of the land and filling or excavation acid sulfate soils, building or
        works do not result in the contamination of land. construction material or other material or
                                                          contaminants;
                                                          AND
                                                          S6.2 The site is not on the contaminated land
                                                          register.
         Compliance
         S6.1 Not Applicable - No filling is proposed
        S6.2 Complies - The site is not located on the Contaminated Land Register
        Haulage activity and amenity                        No solution provided
        O7 Haulage of material to and from a site
        ensures-
        a) minimal disturbance to neighbouring
        properties




                                              BRSS6220.000 Report for Lodgement                           44

Page 47

__ RIL RTNERS


 and properties along the haulage route; and
 b) Council's road infrastructure including
 pavements is not-adversely affected.
 Compliance
 07 Not Applicable - No haulage of material is proposed.
 08 Extent of earthworks Earthworks are            58.1 All earthworks, including cut and fill
 contained within the subject                      batters, retaining walls etc are contained
 property.                                         within the subject site.
 Compliance
 09 Not Applicable - No earthworks proposed.
 Sloping sites                                       59.1 Cut or fill is less than 2rn in depth
 090n sloping sites, excavation or filling are       relative to the natural ground surface.
 designed to maximise the use of natural slope
 and minimise the need for cut and fill.
 Compliance
 59.1 Complies - No cut or fill is proposed.
 Environmental protection                            No solution provided.
 010 Earthworks minimise any adverse impact
 upon groundwater, watercourses, drainage lines,
 wet/ands, and native vegetation.
 Compliance
 010 Complies - No earthworks proposed as part of this development.
 Dams                                               1511. 1 Where the site is in the Rural Zone-
       L)am oca ion and construction does no!        a) fiia land hus u slope of less iltun 2596
 impact upon neighbouring properties in terms        (1:4); and
 of-                                                 b) the earthworks including cut and fill
 a) hydrology;                                       batters and retaining walls are setback
 b) alteration of existing overland flowpaths and    a minimum of 50m from the property
 patterns;                                           boundary; and
 c) landslide or failure of dam wall; and            c) the size of the lot is greater than 5
 d) effluent disposal areas.                         Hectares;
                                                     AND
                                                     S11.2Where the site is in the Rural
                                                     Settlement Zone or the Rural Zone where
                                                     the lot is less than 5 Hectares-
                                                     a) the land has a slope of less than 1 :6;
                                                     and
                                                     b) the earthworks including cut and fill
                                                     batters and retaining walls are setback
                                                     a minimum of 20m from the property
                                                     boundary; and
                                                     c) involving less than 500m3 of material;
                                                     AND
                                                     511.3 For all other zones- No solution
                                                     provided.
 Compliance
 S1 1.1 Not Applicable - The site is not within a rural zoning.
 S1 1.2 Not Applicable - The site is not within a rural zoning.
 S1 1.3 Not Applicable - No dam is proposed as part of this application.




                                       BRSS6220.000 Report for lodgement                           45

Page 48

LANDPARTNERS


Erosion and Sediment Control Code

 column i                                             column 2

 Specific Outcomes                                    Probable solutions rif wale assessable)

 14.125 Effects of works
 Erosion and sediment control                         S1. 1 Site disturbance is limited to building
 01 Development minimises erosion and                 areas, their surrounds and other use areas;
 transport of sediments off-site.                     AND
                                                      51.2 Sediment barriers are provided
                                                      throughout and downslope of disturbed
                                                      areas to prevent sediment washing into
                                                      gutters, drains and watercourses either on
                                                      or off the site;
                                                      AND
                                                      S1.3All stockpiles including sand, soil or
                                                      building materials are within the premises
                                                      and contained within individual sediment
                                                      barriers;
                                                      AND
                                                      51.4 Sediment basins are provided where
                                                      the site contains fine or dispersive soils;
                                                      OR
                                                      S1.5A stormwater catchpit incorporating a
                                                      ctnrmwnter rntrhpit protection device is
                                                      installed so that all runoff from disturbed
                                                      areas flows to the catchpit;
                                                      AND
                                                      51.6 For buildings,
                                                      o) temporary or permanent downpipes
                                                      are connected to the stormwater
                                                      system before laying the roof; or
                                                      b) localised erosion is avoided by
                                                      directing flow from downpipes over
                                                      non-erosive areas.
 Compliance
 S1.1 Complies - No soil disturbance other than serving trenches is proposed.
 S1.2 Complies - Sediment barriers can be appropriately conditioned.
 S1.3 Complies - Sediment barriers can be appropriately conditioned.
 S1.4 Not Applicable- Sediment basins are not appropriate in this instance.
 Si .5 Not Applicable- A stormwater catchpit is not appropriate in this instance.
 Si .6 Not Applicable No building is proposed.
 Storm water runoff                                   52.1 Diversion drains or bunds are
 O2Stormwater is diverted around disturbed            designed and constructed to drain
                                                      upstream run-off around the disturbed site;
 areas.
                                                      AND
                                                      52.2 Discharge from the diversion drains
                                                      do not cause run-off impacts to other
                                                      properties;
                                                      OR
                                                      S2.3AIternative methods, as described in
                                                      the Institution of Engineers Australia
                                                      (Queensland Division) Soil Erosion and
                                                      Sediment Control - Guidelines for
                                                      Queensland Construction Sites, are used
 Compliance
 S2.1 Complies - There will be minimal soil disturbance proposed as part of the development and
 diversion drains can be conditioned is considered necessary.
 S2.2 Complies - This can be appropriately conditioned.
 A2.3 Complies - This con be appropriately conditioned.




                                       BRSS6220.000 Report for Lodgement                              46

Page 49

LANDPARTNERS


Existing Services Code

 column 1                                               column 2

 Specific Outcomes                                      Probable solutions (iif ceasabk

 Setbacks and easements                                 S1. / The footing of any structure or
 01 Development near a sewer, water main,               building is located clear of the zone of
 stormwater drain, overland flow path or associated     influence but no closer than 1.5rn
 structure does not-                                    (measured horizontally) from infrastructure
 a) adversely affect the function of the service;       including sewers, water mains and
 b) place an additional load on the service; and        stormwater structures;
 c) unduly increase future maintenance costs            AND
                                                        S7.2 No building or structure overhangs
                                                        the zone of influence;
                                                        AND
                                                        S1.3Finished surface levels maintain a
                                                        minimum of 600mm of cover, but no greater
                                                        than 3m of cover to the underground
                                                        infrastructure;
                                                        AND
                                                        S1.4If the existing surface level is altered,
                                                        surface level services including manholes
                                                        and inspection points are altered to match
                                                        the new surface level;
                                                        AND
                                                        S1.5AIterations are constructed in
                                                        accordance withPSP6 -Engineering Design
                                                        Standards - Water and Sewerage and
                                                        Section 4 of PSP5 -Engineering Design
                                                        Standards - Roads, Drainage and
                                                        Earthworks;
                                                        OR
                                                        Si .6 Existing services are relocated and
                                                        the design and construction of the relocated
                                                        services is in accordance with PSP6 -
                                                        Engineering Design Standards - Water
                                                        and Sewerage and Section 4 of PSP5 -
                                                        Engineering Design Standards - Roads,
                                                        Drainage and Earthworks.
 Compliance
 S1.1 Not Applicable - No building proposed
 51.2 Not Applicable - No building proposed
 Si .3 Not Applicable - No alteration to the ground level is proposed.
 S1.4 Not Applicable - No alteration to the ground level is proposed.
 S1.5 Complies - Alterations are constructed in accordance with PSP6 and section4 of PSP5.
 A1.6 Complies - Any relocated services will be constructed in accordance with PSP6 and section 4 of
 PSP5.
 02 Maintenance access is provided to all sewers,     S2. 1 A registered easement in favour of
 water mains, stormwater drains, overland flow paths  Council is created over all underground
 and associated structures.                           infrastructure located in private property;
                                                      AND
                                                      S2.2 The width of the easement is the greater of 3m or
                                                      the width of the zone of influence;
                                                        AND
                                                        S2.3The easement is centred over the centreline of the
                                                        infrastructure.
 Compliance
 S2.1 Complies - An easement will be created over the proposed infrastructure.
 S2.2 Complies - The easement will be 5m in width.
 S2.3 Complies - The easement will be centred over the centreline of the infrastructure.




                                         BRSS6220.000 Report for Lodgement                              47

Page 50

     LANDPARTNERS




     Transport, Roads and Drainage Code

      column 1                                          column 2

      Specific Outcomes                                 Probable solutions ('if code a ss ssobk)

      14.145 Strategic Transport Network
      01 Traffic generation from the development is     S1.1 Where the development leads to the
      considered in a localised and a Shire wide        need to increase transport infrastructure in
      context to ensure that-                           the Shire, the development contributes to
      a) the transport network has the capacity to      the transport network in accordance with
      safely and efficiently accommodate projected      the requirements of Infrastructure Charges
      movements; and/or                                 Plans (ICP); and where developments
      b) the development includes measures to           requires infrastructure not included in the
      upgrade the transport network to meet the         ICP, the development upgrades the
      imposed demands.                                  infrastructure at no cost to Council.
Ll
                                                        Advisory note
                                                        Council may for some development
                                                        require the preparation of a Transport
                                                        Impact Assessment Report. Planning
                                                        Scheme Policy PSP1 details matters to be
                                                        addressed in the Report.
      Compliance
      S1.1 Complies - The development will be charged in accordance with Adopted Infrastructure
      Charges Resolution.
      02 The street network has high street            52. 1 Road planning and development
      connectivity, both within the development and to design facilitates as many pedestrian and
      the surrounding local area.                      cycle movements as possible and provides
                                                       for future connectivity and integration with
                                                       adjoining sites;
                                                        AND
                                                        S2.2Arterial and sub-arterial roads are
                                                        designed so they con operate with high
                                                        volumes of traffic during peak times;
                                                        AND
                                                        52.3 Collector and local streets are
                                                        provided to support short trips for local
                                                        traffic moving in and between
                                                        neighbourhoods. Local traffic is channelled
                                                        towards collector streets to ensure that
                                                        traffic volumes on local street are kept low;
                                                        AND
                                                        S2.4 Collector and local streets are
                                                        designed to discourage through traffic;
                                                        AND
                                                        S2.5A collector street is provided parallel
                                                        to arterials particularly where they pass
                                                        through town centres;
                                                        AND
                                                        52.6 Appropriate width of road and verge
                                                        is provided to allow streets to perform their
                                                        designated functions in the street network;
                                                        AND
                                                        S2.7A network of local streets focused
                                                        towards an activity centre or school is
                                                        provided for safe and efficient pedestrian




                                          BRSS6220.000 Report for Lodgement                             48

Page 51

    s   LANDPAR [NERS


                                                            and bike access to the school, safe
                                                            conditions for school buses, setdown
                                                            facilities, with on-site parking where
                                                            practical;
                                                            AND
                                                            52.8 Passive surveillance is maximised by
                                                            designing streets to enable development to
                                                            front all streets and roads, including
                                                            arterials;
                                                            AND
                                                            S2.9Streets near Public Passenger
                                                            Transport facilities are orientated to
                                                            optimise the walkable catchments within
                                                            800 metres walking distance;
                                                            AND
                                                            S2.70The street network has no more
                                                            than 15 percent of lots fronting cul-de-sacs.
                                                            The maximum cul-de-sac length is 120 m;
                                                            AND
                                                            52.11 Street stubs to adjacent future
                                                            development areas are provided at
                                                            spacings of 200 m or closer to enable
                                                            future street connections to be made;
                                                            Awn
                                                            S2. 12 Street block lengths are not more
                                                            than 240 m long, and predominantly around
                                                            150-180 m long. Street block lengths are
                                                            generally shorter closer to town and
                                                            neighbourhood centres;
                                                            AND
                                                            S2.13 Direct, safe and attractive
                                                            pedestrian and cycle routes are provided
                                                            within and through the development and
                                                            connect to bus stops.
         Compliance
         02 Not Applicable - The development is for a small infill subdivision and no roads are proposed as
         part of the development.

E
         03 Development is designed -                       53.1 Higher density development is
         a) To encourage travel by community transport,     concentrated along public transport Routes;
         walking and cycling rather than by private car;    AND
         and                                                S3.2There is provision for bus routes
         b) To maximise accessibility via existing and      through development sites;
         planned community transport facilities             AND
                                                            53.3 Bus routes are located to maximise
                                                            patronage catchment and to consider
                                                            personal safety, lighting and traffic
                                                            management;
                                                            AND
                                                            S3.4At least 90 percent of all residents are
                                                            located within 400 metres of an existing or
                                                            planned bus route;
                                                            AND
                                                            53.5 Pedestrian and cycle movement is
                                                            provided within local streets to and through
                                                            development;
                                                            AND
                                                            53.6 Attractive and safe pedestrian and
                                                            cycle connections are provided with shade




                                             BRSS6220.000 Report for Lodgement                              49

Page 52

         kTNERS
    .4
                                trees, graded walking and cycle paths and
                                lighting;
                                AND
                                53.7 Buildings and pedestrian entrances
                                are oriented to the street;
                                AND
                                53.8 Pathways have ramps at all kerb
                                corners for wheelchair and pram access;
                                AND
                                53.9 Every development has convenient
                                and prominent pedestrian entrances that
                                cater for all pedestrians including older
                                people, children and the mobility and vision
                                impaired;
                                AND
                                53. 10 Expanses of ground level blank
                                walls along street frontages, and large
                                driveways and entrances to carparks are
C                               avoided;
                                AND
                                53.11 Bus routes are not be located away
                                from activity centres; and
                                AND
                                S3 12 Facilities for boardinq and exiting
                                community transport facilities are
                                incorporated into developments;
                                AND
                                53.13 Pedestrian and cycle routes within
                                or adjacent to the development are
                                overlooked by adjoining buildings, make
                                use of views and attractive sights, have
                                lighting and are signposted;
                                AND
                                S3.74 Suitable car restraint measures are
                                adopted within the development such as
                                lower speed limits or traffic calming measures to
                                support greater pedestrian
                                and cycle movement;
C
                                AND
                                53.15 Traffic management devices on
                                potential bus routes are provided in
                                accordance with the Self-assessable code
                                for undertaking road works on local
                                government roads, under the Transport
                                Planning and Coordination Regulation
                                2005;
                                AND
                                53.16 Streets identified as potential bus
                                routes are-
                                a) collector streets and subarterial/
                                arterial roads which provide
                                highly accessible and relatively direct
                                routes wherever practical;
                                b) those that provide for the shortest and
                                most direct route for an efficient
                                public transport service; and
                                c) those that can efficiently service
                                adjoining development areas.




                  BRSS6220.000 Report for Lodgement                            50

Page 53

LANDPARTNERS
..^„ .,.^,....,, ....mow,:.

  Compliance
  03 Not Applicable - The development is for a small infill subdivision and no roads are proposed as
  part of the development.
  04 Development access does not compromise         No solution provided.
  the functions of particular roads as indicated in
  the road hierarchy, and does not adversely
  impact on the safety, capacity and operations of
  the road system.
  Compliance
  04 Complies - The development is for a small infill subdivision and does not compromise the
  functions of particular roads as indicated in the road hierarchy and does not adversely impact on the
  safety, capacity and operations of the road system.
  14.146 Pedestrian and Cycle Path Infrastructure
  05 Pedestrian and cycle path infrastructure is       S5. 1 Consideration is given to existing and
  provided -                                           future pathway linkages and pathways link
  a) to form an integrated component of the            to the Local and Regional Cycle Network.
  movement network and the open space                  55.2 Direct and accessible linkages are
  system;                                              provided into the site.
  b) to encourage walking and cycling;                 55.3 Pathway and landscape works are
  c) to add variety and visual interest;               provided to a high standard to Council
  d) to conserve street trees, vegetation and other    specifications and assessed for compliance
  significant features;                                with local government cycling facility design
  e) to allow equitable access to public areas and     standards.
  community             ;                              -9-6. d.-PE-0121VOGY6 We PIPOVid-A-d- in rater fn
  f) with adequate lighting where subject to high     shared use and cater for both commuting
  night time usage;                                   and recreational usage and exceed
  g) in locations where there is casual surveillance; minimum standards.
  h) or widened at potential conflict points;
  i) to incorporate-
  s) street tree planting to enhance the
  streetscape;
  ii) directional signage that is visible
  under all conditions.
  Compliance
  05 Not Applicable - The development is for a small infill subdivision and pedestrian and cycle path
  infrastructure is not required.
   06 Pedestrian and cycle path infrastructure is     56. 1 Pedestrian and cycle path
  designed and constructed to -                       infrastructure is designed and constructed -
  a) provide a stable, smooth surface, including      d) in accordance with AUSTROADS
  across driveways, sections and joins;               Part 14 - Bicycles, Section 6;
  b) be easily maintained;                            e) to comply with local government
  c) a width and longitudinal gradient to cater for   design standards.
  projected usage, including nearby-                  f) to have navigational signs in
        i)       high activity nodes;                 accordance with Council 'Wayfinding'
  ii) public transport;                               signage specifications.
  iii) centres;                                       g) to incorporate -
  d) provide clear sight-lines for safe use;          i) kerb ramps at all intersections and
  e) be free of any obstructions such as fences,      designated crossings;
        i)       signage and bollards.                ii) refuge islands on all roads with
                                                      median strips;
                                                      iii) holding rails for cyclists at the
                                                      intersection of trunk collector, subarterial
                                                      and arterial roads that are
                                                      positioned in accordance with -
                                                      A. Australian Standard 1 742.9:
                                                      2000 - Manual of Uniform
                                                      Traffic Control Devices -
                                                      Bicycle Facilities; and
                                                      B. AUSTROADS Part 14 -




                                       BRSS6220.000 Report for Lodgement                               51

Page 54

LANDPARTNERS


                                                                 Bicycles - Section 9; and
                                                                 C. AUSTROADS Part 13 -
                                                                 Pedestrians.
 Compliance
 06 Not Applicable - The development is for a small infill subdivision and pedestrian and cycle path
 infrastructure is not required.


 Table 14-59 - Roads and drainage
  O7Roads and pedestrian and cycle paths are                     57.1 Road planning and design supports
 planned and designed to support the hierarchy                   the hierarchy and functional aspects
 and                                                             identified in Sections 2 and 3 of PSF5
 functional aspects identified in Sections 2 and 3               Engineering Design Standards - Roads,
 of                                                              Drainage and Earthworks;
 PS15 Engineering Design Standards - Roads,                      AND
 Drainage and Earthworks and to ensure that-                     S7.2 Road and pathway planning and
 a) design and alignment of the roads,                           design is in accordance with, in order of
 intersections and all associated works-                         precedence-
 i. provides a safe environment for all                          a) Noosa Integrated local Transport
 users;                                                          Man;
 ii. is adequate for the design speed                            b) Queensland Transport's Shaping Up;
 environment;                                                    c) Queensland Design Code for
 iii. is adequate for predicted traffic                          Residential Streets;
 volumes; and                                                    d) AUSTROADS Guide to Traffic
 4. .1.   M66F;teiAq_ the r-A-fe 9121d AffiCiAA1                 Engineering Practice;
 functioning of the road network without                         e) Sections 2 and 3 of PSP5 Engineering
 the use of traffic signals;                                     Design Standards - Roads, Drainage
 v. is compatible with existing roads;                           and Earthworks; or
 vi. is easily maintained by Council                             f) the Noosa Cycling and Walking
 equipment; and                                                  Network Development Plan;
 vii. where appropriate, has the ability to                      OR
 accommodate public transport services;                          g) A combination of the principles in
 b) road pavement surfaces-                                      these documents.
 i. are durable enough to carry                                  AND
 estimated wheel loads of travelling and                         57.3 On-road cycling treatment is utilised to
 parked vehicles;                                                provide safe and continuous movement of
 ii. provide for the safe passage of                             cyclists along a roadway, such as--
 vehicles, pedestrians, cyclists, and                            a) sealed shoulders;
 discharge of stormwater run-off from                            b) wide kerbside lone;
 contributing catchments and the                                 c) exclusive or peak period bicycle lane;
 preservation of all weather access;                             d) advisory treatments such as Bicycle
 c) kerb and channel-                                            Awareness Zone;
 i. controls vehicle movement by                                 e) shared parking / bicycle lone;
 delineating the carriageway for all users;                      f) contra flow bicycle lane; and
 ii. conveys road pavement run-off to                            g) bus/bicycle lane.
 stormwater drainage in a manner that                            S7.4 The provision of bicycle lanes at
 allows the road to be trafficable in Q 100                      intersections is generally in accordance with
 ARI local rainfall events; and                                  AUSTROADS Part 14, section 5 and the
 d) verges and footpaths provide-                                Manual of Urban Traffic Control Devices
 d. safe access for pedestrians and                              (MUTCD) Part 9.
 cyclists clear of obstructions;
 ii. an access area for vehicles onto
 properties;
 iii. a corridor allocated for services and
 utilities; and
 iv. additional amenity for minor roads.


 Compliance
 07 Not Applicable - No roads are proposed as part of this development.




                                                   BRSS6220.000 Report for Lodgement                             52

Page 55

LANDPARTNERS


 O8Stormwater drainage infrastructure is            S8. I Stormwater drainage planning, design
 planned, designed and constructed to-              and construction is in accordance with
 a) be accessible, cost effective and easily        Section 4 of PSPS Engineering Design
 maintainable;                                      Standards - Roads, Drainage and Earthworks;
 b) protect downstream capacity;                    AND
 c) protect downstream water quality;               S8.2As Constructed data is submitted in
 d) maximise on-site stormwater retention and       accordance with Section 6 of PSP5
 retardation; and                                   Engineering Design Standards - Roads,
 e) convey run-off to stormwater drainage in a      Drainage and Earthworks;
 manner that allows roads to be trafficable in      AND
 Q100 ARI local rainfall events.                    S8.3Stormwater drainage planning, design
                                                    and construction is in accordance with the
                                                    Queensland Urban Drainage Design
                                                    Manual.
 Compliance
 S8.1 Complies - The stormwater drainage will be designed and constructed in accordance with
 section 4 of the PSP5 Engineering Design, Standards - Roads, Drainage and Earthworks.
 S8.2 Complies - As constructed data will be submitted in accordance with section 6 of PSP5
 Engineering Design Standards - Roads, Drainage and Earthworks.
 S8.3 Complies - Stormwoter drainage planning, design and construction is in accordance with the
 Queens/and Urban Drainage Design Manual.

 09 Roads and stormwater drainage                   S9.1 Roads and stormwater drainage
                                                    _^ astrurture s cnnstructPrt in nrrarrtnnrp
 a) in accordance with appropriate engineering      with-
 standards; and                                     a) Sections 2, 3 and 4 of PSP5
 b) to minimise adverse environmental impacts,      Engineering Design Standards -
 including from run-off and erosion.                Roads, Drainage and Earthworks;
                                                    b) Queensland Design Code for
                                                    Residential Streets;
                                                    c) AUSTROADS,; or
                                                    d) A combination of the principles in
                                                    these documents;
                                                    AND
                                                    59.2 Erosion and sediment control
                                                    measures are designed and implemented in
                                                    accordance with the Institution of Engineers
                                                    Australia (Queensland Division) Soil Erosion
                                                    and Sediment Control - Guidelines for
                                                    Queensland Construction Sites.
 Compliance
 09 Not Applicable - No roads are proposed as part of this development application.


Environmental Protection                            510.1 Roads and stormwater drainage
010 Roads and stormwater drainage                   follow the edge of existing disturbed areas, or
infrastructure                                      alternatively, these works are co-located
are located and aligned so as to-                   within a combined utility corridor;
a) minimise disturbance to native vegetation        AND
and/or other habitat areas;                         510.2 Roads avoid native vegetation and
b) protect and maintain wildlife corridor           provide for fauna underpasses and
movements and the safety of native fauna;           associated fencing where appropriate;
c) minimise changes to the hydrological regime,     AND
including drainage patterns, run-off and water      510.3 Road infrastructure within or adjacent
quality;                                            to native habitat incorporates fences which
d) avoid crossing watercourses, drainage lines      allow for protected wildlife movement and
and wetlands, but where such crossings are          controls unrestricted access of domestic
unavoidable, disturbed areas are reinstated         cats and dogs;
and revegetated on completion of works; and         AND
e) minimise bulk earthworks.                        510.4 Native vegetation is protected from




                                      BRSS6220.000 Report for Lodgement                            53

Page 56

     /^   LANDPARTNERS


                                                                 clearing or construction activities by-
                                                                 a) clearly marking vegetation to be
                                                                 retained with flagging tap;
                                                                 b) installing protective fencing around the
                                                                 dripline of vegetation; and
                                                                 c) ensuring stock piling, storage and
                                                                 vehicle parking occur outside the areas
                                                                 of vegetation to be retained;
                                                                 AND
                                                                 510.5 Low impact construction techniques
                                                                 are used around areas of vegetation to be
                                                                 retained to minimise interference with the
                                                                 vegetation.
           Compliance
           S10.1 Not Applicable - No roads are proposed as part of this application.
           510.2 Not Applicable - No roads are proposed as part of this application.
           S10.3 Not Applicable - No roads are proposed as part of this application.
           510.4 Not Applicable - No roads are proposed as part of this application. Native vegetation
0          proposed for retention will be protected using the above methods.
           510.5 Not Applicable - No construction is proposed.

           011 Roads and stormwater drainage                     No solution provided
           infrastructure is proven to be suitable for its use


           Compliance
           011 Not Applicable - To this application.


           012Alignment of stormwater drainage                   512. 1 The location, design and construction
           infrastructure is to allow for easy access for the    of stormwater drainage structures is in
           ongoing maintenance by Council.                       accordance with Sections 4 and 5 of PSF5,
                                                                 Engineering Design Standards - Roads,
                                                                 Drainage and Earthworks;
                                                                 AND
                                                                 512.2 Where infrastructure is located on
                                                                 private land an easement is dedicated over
                                                                 the infrastructure in accordance with Section
                                                                 4 of PSP5, Engineering Design Standards -
11                                                               Roads, Drainage and Earthworks.
           Compliance
           512.1 Complies - Stormwater drainage will be constructed in accordance with section 4 & 5 of the
           PSP5. The Engineering Assessment has been included within Appendix H, which details the intended
           method of stormwater discharge through roof water pits and pipe along the rear boundary of the
           proposed new allotments.
           S12.2 Complies - Any infrastructure on private land will be covered by an easement in accordance
           with PSP5.

           14.148 Frontage works
           013 Development is provided with external             513.1 The following infrastructure
           roadworks along the full extent of the frontage of    components already exist at the frontage of
           the site to an appropriate standard having            the site or are provided at the developer's
           regard to the specified function of the road.         expense-
                                                                 a) full width sealed road;
                                                                 b) concrete kerb and channel where
                                                                 appropriate;
                                                                 c) forming and grading to footpaths;
                                                                 d) vehicular kerb and footpath crossings;
                                                                 e) a constructed bikeway;
                                                                 f) a constructed footpath;
                                                                 g) a constructed carriageway;




                                                  BRSS6220.000 Report for Lodgement                              54

Page 57

LAND PARTNERS


                                                        h) required alterations to public utility
                                                        mains, services or installations;
                                                        i) construction of any required alterations
                                                        to public utility mains, services or
                                                        installations;
                                                        j) stormwater drainage works; and
                                                        k) installation of electrical conduits;
                                                        AND
                                                        513.2 Road and drainage design and
                                                        construction is in accordance with Sections
                                                        3 and 4 of PSP5 Engineering Design
                                                        Standards - Roads, Drainage and
                                                        Earthworks.
 Compliance
 S13.1 Complies - The proposal is for an infill subdivision and contains a frontage to Council's
 standards.
 S13.2 Complies - No road is proposed as part of this application.


 14.149 Road and rail corridors
 014 Noise sensitive uses including residential         514.1 Noise sensitive uses including
 uses are not subjected to high traffic noise levels    residential uses are separated by a
 from the major road network or rail corridors.         minimum of-
                                                        a) 40m from the property boundary of

                                                        and
                                                        b) 80m from the property boundary of rail
                                                        corridors;
                                                        OR
                                                        514.2 Development in the vicinity of road
                                                        corridors meets the following external design
                                                        criteria for roads in the major road network-
                                                        a) 54dB(A)L10 (18hours) based on predicted
                                                        traffic volumes ten years hence;
                                                        AND
                                                        514.3 Development in the vicinity of rail

                                                        level noise criteria-
                                                        a) 65dB(a), assessed as the 24hour
                                                        average equivalent continuous Aweighted
                                                        sound pressure level; and
                                                        b) 87dB(A), assessed as a single event
                                                        maximum sound pressure level.
 Compliance
 014 Complies - The subject site is not in the vicinity of road or rail corridor.


 14.150 Staged development
 015Staged development is planned, designed             No solution provided.
 and constructed to ensure that-
 a) each stage of the development can be
 constructed without interruption to services
 and utilities provided to the previous stages;
 b) the infrastructure provided is capable of
 servicing the entire development; and
 c) the materials used are consistent throughout
 the development.


 Compliance
 015 Not Applicable - The application is not staged.




                                        BRSS6220.000 Report for Lodgement                             55

Page 58

LANRP!RTNERS



 14.151 Alterations to services and utilities
 016 Any alterations or repairs to infrastructure 516.1 Any alterations or repair to
 as a result of the development are made at no    infrastructure as a result of the development
 cost to council.                                 are completed at the developer's expense.
 Compliance
 S16.1 Complies - Any alterations or repair to infrastructure as a result of the development are
 completed at the developer' expense.




Waste Management Code

 column 1                                             column 2

 Specific Outcomes                                    Probable solutions (if co& a     ab )

 Waste separation                                     S1.1 Construction, operational and demolition
 01 Development that generates several classes        works are planned and managed in accordance
 of waste is designed so waste is collected, stored   PSP1131;
 and disposed of in a safe and ecologically           AND
 sustainable manner.                                  S1.2Adequate area is provided for on-site
                                                      for the collection and separate storage of
                                                      recyclable, non-recyclable, vegetative and

                                                      streams during construction, operational and
                                                      demolition works;
                                                      AND
 Compliance
 S1.1 Not Applicable - The development is for an infill subdivision.
 S1.2 Not Applicable - The development is for an infill subdivision.
                                                 1
 021N3.ite storage areas provide for adequate       52.1 Waste storage areas allow for the
 separation of all recyclable and non-recyclable    separate storage of different waste materials
 materials.                                         for reuse or recycling by-
                                                    a) providing sufficient area to store all
                                                    recyclable material and recycling
                                                    containers required; and
                                                    b) sign posting the types of waste stored.
 Compliance
S2.1 Not Applicable - The development is for an infill subdivision and contains sufficient area for
waste storage areas.
Design and location of waste storage areas        53. 1 Waste storage areas are designed
O3 Waste storage areas are located so that they   and maintained in accordance with PSP9;
are convenient and safe to use and provide for    AND
convenient and safe collection by service       I 53.2 Waste storage areas are designed and
vehicles;                                         located so they-
AND                                               a) are easily accessed and convenient to
O4 The location and methods of waste storage      use;
minimises any adverse impacts on adjoining or     b) have unobstructed access for the
nearby properties;                                collection of the waste by service
                                                  vehicles;
AND                                               c) provide for sufficient space for safe
O5 Waste storage areas are designed for ease of   entry and exit and servicing by
maintenance and ease of access for cleaning;      Council's contractor without the need
AND                                               for manual handling;
                                                  d) are clear of carparking bays, loading
                                                  bays and similar areas;
                                                  e) are clear of Footpaths and pedestrian
                                                  access;
                                                  f) are capable of being serviced by the




                                       BRSS6220.000 Report for Lodgement                            56

Page 59

     O
         LANDPARTNERS
         e. ..qI..-....w.p.m.




                                                                collection vehicle without impeding
                                                                traffic flow; and
                                                                g) have a level area provided for the
                                                                storage of waste and recyclable
                                                                materials in standard waste
                                                                containers;
                                                                AND
                                                                53.3 For uses that do not comprise a
                                                                caretaker's residence or central
                                                                management, the maximum distance
                                                                between waste storage areas and the
                                                                kerbside is-
                                                                a) for Multiple housing Type 3 - 40m;
                                                                b) for other uses - 70m; and
                                                                53.4 Pathways used to transport bins-
                                                                a) have a maximum grade of 1:15; and
                                                                b) are free of steps, stairs or other
                                                                impediments;
C:                                                              AND
                                                                 S4. 1 Waste storage areas are-
                                                                 a) integrated with the building design,
                                                                 where possible;
                                                                 b) setback a minimum of 2m from side
                                                                 and rear properly boundaries:
                                                                 c) screened so that bins are not visible
                                                                 from neighbouring properties or
                                                                 passing vehicular and pedestrian
                                                                 traffic; and
                                                                 d) not located directly adjacent to
                                                                 dwelling units on the site on
                                                                 neighbouring properties;
                                                                 AND
                                                                 55.1 Waste storage areas are constructed
                                                                 of impermeable, durable and non-textured
                                                                 materials and surfaces so that they are
                                                                 easily cleaned;
                                                                 AND
                                                                S5.2A minimum distance of 0.5m2 distance
LJ
                                                                is provided between and around waste
                                                                storage bins to allow for manoeuvring and
                                                                washing of bins.
                                                                AND
          Compliance
          05 Not Applicable - The proposal is for an infill residential subdivision.
          06 Waste storage areas provide a safe and             56.1 No solution provided.
          secure environment for users through-
          a) appropriate siting and access;
          b) the provision of lighting; and
          c) restricting access to the general public by
          making the area clearly identifiable as private
          space leg. through landscaping, change of
          paving material or fencing, rather than locking
          the area.
          Compliance
          06 Not Applicable - The proposal is for an infill residential subdivision.
          Water management for waste storage areas              S7. 1 The waste storage area -
          O7Waste storage areas are designed to contain j a) is bunded and graded so that washwater and
          and appropriately dispose of leakage from bins 1 bin leakage are drained to the sewer or an on-
          and wastewater from bin washing                       site effluent disposal system via a gully within the




                                                 BRSS6220.000 Report for Lodgement                              57

Page 60

     LANDPARTNERS


                                                                         storage area;
                                                                         b) has a bund wall with a maximum height
                                                                         of 100mm;
                                                                         c) is serviced by a conveniently located
                                                                         hosecock and backflow prevention
                                                                         device, and connected to a water
                                                                         supply; and
                                                                         d) is roofed or otherwise covered if the
                                                                         storage area is-
                                                                         1) more than 1 m2; or
                                                                         ii) storing wet waste; or
                                                                         iii) storing other waste with a high potential to
                                                                         cause pollution if washed or leaked from the
                                                                         bins, including waste oil or putrescibles.
      Compliance
      07 Not Applicable - The proposal is for a residential subdivision



C:   Water Sensitive Design Code

     1cobmr l                                                            column 2

      Specific Oukort M 6 - Rut 4:;;   1 t 0 L' 2 z. - - 1 14.'^ "*I.,        abteIso it ans. of coafer a    able)

      Water reuse                                                        S1. 1 Development complies with the water
      01 Development uses a combination of                               quality standards in Table 2 of the SEQ
      detention and retention systems to capture run-                    Regional Plan Implementation Guideline No.
      off from areas on the site;                                        7 for Water Sensitive Urban Design;
      Compliance
      S1.1 Not Applicable - Table 2 of the SEQ Regional Plan Implementation Guideline No. 7 for Water
      Sensitive Urban Design does not apply to the proposed development given that it is for very low-
      density development.
      02 Water storage devices must have sufficient    52. 1 No solution provided
      capacity having regard to local rainfall pattern
      and the catchment area of roof or other hard
      standing surface;
      Compliance
      02 Not Applicable - The development is for an infill subdivision and water storage devices will be
      included as part of future development.
      03 Captured water is utilised for all non-potable 53. 1 Captured water is plumbed to be
      uses on site;                                     available for all external uses including
                                                        gardening, irrigation, ponds, filling swimming
                                                        pools and outdoor cleaning, as well as all
                                                        ground floor toilet cisterns and washing
                                                        machine cold taps;
                                                        AND
                                                        53.2 Where the captured water is used for
                                                        toilet flushing and/or laundry use, an
                                                        automatic or manual interchange device that
                                                        allows alternate use of captured water or the
                                                        reticulated water supply is installed to
                                                        ensure that there is a continual supply of
                                                        water for sanitary flushing and laundry use.
      Compliance
      03 Not Applicable - The development is for an infill subdivision and water storage devices will be
      included as part of future development.
      04 On-site detention does not adversely impact     S4. 1 No solution provided
      on water requirements downstream of the site
      where the water is required to sustain the ecology




                                                  BRSS6220.000 Report for Lodgement                                      58

Page 61

    L4NDPARTNERS


     and hydrology of downstream systems
     (environmental flows ;
     Compliance
     04 Not Applicable - The development is for an infill subdivision and water storage devices will be
     included as part of future development.
     05 Within the Shire Business Centre site, as        S5. 1 No solution provided
     shown on Map SBC, on-site detention measures
     are contained within the developed areas of the
     site, clear of drainage lines and Open Space
     Precincts.
     Compliance
     05 Not Applicable - The development is for an infill subdivision and water storage devices will be
     included as part of future development.
     Run-off treatment                                   S6. I Development complies with the
     06 Run-off that leaves the site is treated so as  i water quality standards in Table 2 of the
     not to adversely impact on the ecology and          SEQ Regional Plan Implementation
     hydrology of downstream environmental flows;        Guideline No. 7 for Water Sensitive Urban
     AND                                                 Design.
     Compliance
     S6.1 Not Applicable - Table 2 of the SEQ Regional Plan Implementation Guideline No 7 for WSUD is
     not applicable given the very low density of proposed development.
     07Within the Shire Business Centre site, as         57. 1 Development complies with the
     shown on Map SBC-                                   water quality standards in Table 2 of the

     b) drainage lines are only used for final polishing   Guideline No. 7 for Water Sensitive Urban
     of run-off.                                           Design.
     Compliance
     S7.1 Not Applicable - Table 2 of the SEQ Regional Plan Implementation Guideline No 7 for WSUD is
     not applicable given the very low density of proposed development.
     Town water supply connections                        58.1 A suitable backflow prevention device
     O8Backflow devices or similar systems ensure         is installed to protect the potable water
     water reuse facilities have no impact on the       i within the reticulated water supply in
     quality of the town mains water.                     accordance with AS/NZS 3500:2003
                                                          Plumbing and Drainage.
     Compliance
     08 Not Applicable - The development is for an infill subdivision and water storage devices will be
     included as part of future development.
E    Use ofnatural treatments and systems              S9. 1 & 510.1 Development complies with
     09 Natural treatment strategies, including grass the water quality standards in Table 2 of the
     swales and bio-retention systems, vegetated      SEQ Regional Plan Implementation
     filtration strips and gross pollutant traps, are Guideline No. 7 for Water Sensitive Urban
     used wherever practicable;                       Design.
    AND
    010 Within the Shire Business Centre, as shown
    on Map SBC- where necessary, drainage lines
    are ecologically enhanced to ensure that the
    water quality polishing functions are of high
    standard.
     Compliance
     09-10 Not Applicable - The development is for an infill subdivision and water storage devices will be
     included as part of future development.




                                           BRSS6220.000 Report for Lodgement                           59

Page 62

    LANDPARTNERS




    Water Supply & Sewerage Reticulation Code

     column 1                                            column 2

     Specific Outcomes                                   Probable solutions (if code assessable}

     14.164 Design and construction (water)
     01 Water supply infrastructure-                     S1. 1 Water supply infrastructure is
     a) meets the needs of the users;                    designed in accordance with PSP6 -
     b) is designed to be compatible with existing       Engineering Design Standards - Water and
     infrastructure; and                                 Sewerage and As Constructed data
     c) is designed using materials that are suitable    submitted in accordance with PSP6-
     for the use, durable, easy to maintain and          Engineering Design Standards - Water and
     cost effective, taking into account the whole of    Sewerage.
     life cycle cost and Council's maintenance
     inventory.
7    Compliance
     S1.1 Complies - The water supply infrastructure will be constructed in accordance with PSP6
     Engineering Design Standards - Water and Sewerage and As Constructed data will be submitted in
     accordance with PSP6 - Engineering Design Standards - Water and Sewerage.
     02 Water supply infrastructure is constructed-  S2.1 Water supply infrastructure is
                                                     constructed in accordance with PSf1S -
     standards; and                                   Engineering Design Standards - Water and
     b) to minimise adverse environmen/alimpacts.    Sewerage,-
                                                     AND
                                                      52.2 Erosion and sediment control
                                                     measures are designed and implemented in
                                                     accordance with the Institution of Engineers
                                                     Australia (Queensland Division) Soil Erosion
                                                      and Sediment Control - Guidelines for
                                                      Queensland Construction Sites.
     Compliance
     S2.1 Complies - The water supply infrastructure will be constructed in accordance with PSP6
     Engineering Design Standards - Water and Sewerage.
     S2.2 Complies - Erosion and sediment control measures will be designed and implemented in
     accordance with the Institution of Engineers Australia (Queensland Division) Soil Erosion and
     Sediment Control - Guidelines for Queensland Construction Sites. Given the small scale of the
     development this can be appropriately developed.
     03 Water supply infrastructure is proven to be      No solution provided.
     suitable for its use prior to Council accepting the
     dedicated asset.
     Compliance
     03 Complies - The water supply infrastructure will be in accordance with Council requirements.
     04 Water supply infrastructure is provided with     No solution provided.
     all suoooiting technical documentation
     Compliance
     04 Complies - This can be appropriately conditioned.
     05 Where buildings or other structures are in     55. 1 The footing of any building or structure
     proximity to State or Council's water supply      is located clear of the zone of influence but
     infrastructure, provision is made to protect the  no closer than 1.5m (measured horizontally)
     infrastructure from physical damage and to allow  from infrastructure including sewers, water
     ongoing maintenance by Council                    mains and stormwater structures;
                                                       AND
                                                       55.2A registered easement in favour of
                                                       Council is created over all underground
                                                       infrastructure located in private property;
                                                       AND




                                           BRSS6220.000 Report for Lodgement                            60

Page 63

IANDPARTNERS


                                                     55.3 The width of the easement is the
                                                     greater of 3m or the width of the zone of
                                                     influence;
                                                     AND
                                                     55.4 The easement is centred over the
                                                     centreline of the infrastructure.
 Compliance
 05 Not Applicable - No building is proposed as part of the development.
 O6Alignment of water supply infrastructure        56.1 Infrastructure is designed and
 allows for easy access for the ongoing              constructed on the preferred alignments in
 maintenance by Council.                             accordance with PSP6 Engineering Design
                                                     Standards - Water and Sewerage.
 Compliance
 06.1 Complies - The provision of infrastructure will be designed and constructed on the preferred
 alignments in accordance with PSP6 Engineering Design Standards - Water and Sewerage.
 O7Any alterations or repairs to infrastructure as 57.1 Any alterations or repair to
 a result of the development are made at no cost   infrastructure as a result of the development
 to Council.                                       are completed at the developer's expense.
 Compliance
 S7.1 Complies - Any alterations or repair to infrastructure       a result of the development
 completed at the developers expense.
 Table 14-63 Sewerage reticulation
 14.165 Design and construction (sewer)

 a) meets the needs of the users;                    designed in accordance with PSP6
 b) is designed to be compatible with existing       Engineering Design Standards - Water and
 infrastructure; and                                 Sewerage.
 c) is designed using materials that are suitable
 of the use, durable, easy to maintain and cost
 effective, taking into account the whole of life
 cycle cost and Council's maintenance
 inventory.
 Compliance
 S8.1 Complies - Sewer reticulation infrastructure is designed in accordance with PSP6.
 09 Sewerage reticulation infrastructure is           S9.1 Sewerage reticulation infrastructure is
 constructed-                                         constructed in accordance with PSP6 -
 a) in accordance with appropriate engineering         Engineering Design Standards - Water and
 standards; and                                       Sewerage and As Constructed data
 b) to minimise adverse environmental impacts         submitted in accordance with PSP6 -
                                                      Engineering Design Standards - Water and
                                                      Sewerage;
                                                      AND
                                                      S9.2 Erosion and sediment control
                                                     measures are designed and implemented in
                                                     accordance with the Institution of Engineers
                                                     Australia (Queensland Division) Soil Erosion
                                                     and Sediment Control - Guidelines for
                                                     Queensland Construction Sites.
Compliance
S9.1 Complies - Sewerage reticulation infrastructure is constructed in accordance with PSP6 -
Engineering Design Standards - Water and Sewerage and As Constructed data submitted in
accordance with PSP6 - Engineering Design Standards - Water and Sewerage.
S9.2 Complies - Erosion and sediment control measures can be conditioned as part of the approval.
010 Sewerage reticulation infrastructure is        No solution provided.
proven to be suitable for its use prior to Council
accepting the dedicated asset.
Compliance
010 Complies - Sewer infrastructure will be constructed to Councils standards.
011 Sewerage reticulation infrastructure is         No solution provided.




                                       BRSS6220.000 Report for Lodgement                             61

Page 64

IANDPARTNERS
  ..awnw•m e••wun^




 provided with all supporting technical
 documentation.


 Compliance
 01 1 Complies - All required supporting technical documentation will be provided.
 012 Where buildings or other structures are            S12.1 The footing of any structure or
 developed adjacent to Council's sewerage               building is located clear of the zone of
 reticulation infrastructure, satisfactory provision is influence but no closer than 1.5m (measured
 made to protect the infrastructure from physical       horizontally) from infrastructure including
 damage and to allow ongoing maintenance by             sewers, water mains and stormwater
 Council.                                               structures;
                                                        AND
                                                        S12.2 A registered easement in favour of
                                                        Council is created over all underground
                                                        infrastructure located in private property;
                                                        AND
                                                        S12.3 The width of the easement is the
                                                        greater of 3m or the width of the zone of
                                                        influence;
                                                        AND
                                                        512.4 The easement is centred over the
                                                        centreline of the infrastructure.
 Compliance
 S17 1 Not      Applicable

 Si 2.2 Complies - An easement will be provided over any Council infrastructure.
 512.3 Complies - The width of the easement will be compliant with S 12.3.
 Si 2.4 Complies - The easement will be centred over any underground infrastructure.
 013 Alignment of sewerage reticulation             513.1 Infrastructure is constructed on the
 infrastructure is to allow for easy access for the preferred alignments in accordance with
 ongoing maintenance by Council.                    PSP6 -Engineering Design Standards -
                                                    Water and Sewerage.
 Compliance
 13.1 Complies - Infrastructure is constructed on the preferred alignments in accordance with PSP6.
 014 Any alterations or repairs to infrastructure     514.1 Any alterations or repair to
 as a result o the development are made at no         infrastructure as a result of the development
 cost to Council,                                     are completed at the developer's expense.
 Compliance
  S14.1 Complies - Any alterations or repair to infrastructure as a result of the development are
I completed at the developer's expense.



Biodiversity Overlay Code

 columns 1                                           column2

 Specific Outcomes                                   Probable solutions (if code assessable)


 13.9 Vegetation retention and conservation

 Environmental Protection Area &                     Si. 1 An Ecological Assessment Report
 Environmental Enhancement Area                      prepared in accordance with Planning Scheme
 Vegetation & Riparian Buffer Area                   Policy 18 - Ecological Assessment Guidelines
 01 Vegetation of local origin local origin on       demonstrates that the flora on the premises
 premises identified as-                             does not constitute Environmental Protection
 a) Environmental Protection Area or                 Area or Environmental Enhancement Area
 Riparian Buffer Area on the Biodiversity            vegetation.
 Overlay Maps OM1.1 to OM9.1, is                     OR
 retained and conserved in its present               S1.2Where constructing a Detached House;




                                      BRSS6220.000 Report for Lodgement                           62

Page 65

    form or improved to ensure its ongoing                or Community residence interference with
    contribution to the natural resources and             vegetation does not extend beyond-
    biological diversity of the former Noosa              a) 30m of a building or 1 Om of a structure on
    Shire; and                                            lots greater than l Oha; or
    b) Environmental Enhancement Area 10 on               b) 1 Om of a building or structure on lots 1 Oho
    Biodiversity Overlay Maps OM1.I -                     or less but more than 0.3ho; or
    OM9.1, is protected from the impacts of               c) 3m of a building or structure on lots 0.3ha
    development by-                                       or less.
    i. avoiding edge effects;
    ii. avoiding fragmentation; and
    iii. maintaining vegetation in manageable and
    viable configurations.
    AND
    Compliance
    Sl.1 Performance Solution - The attached Vegetation Assessment identifies the EPA overlay as
    containing a low ecological value for the following reasons;
            it does not form a intact floral community
            it there is no contiguous canopy
            there is no linkage to other vegetation
            the area is highly modified
            it is very close to dwellings
            the trees are unlikely to be used for roosting or nesting
            the species have a low to modest source of food for birds and other animals

        •   With the existing land management it is probable the endemic trees would be displaced
         •  by exotic flora as they die from natural causes
    The proposed development recommends a substantial amount of replanting totalling 26 trees. This is
    considered a vast improvement to the existing situation.
    Si .2 Not Applicable - The application is for an infill subdivision.
    02 For the purpose of Reconfiguring a Lot             52. 1 Where interference with vegetation on
    new lots are only created where they minimise         the premises is for the purpose of
    the fragmentation and maximise the retention of
    existing vegetation.                                  Reconfiguring a Lot-

                                                          a) new boundaries to lots do not transect
                                                          and fragment existing vegetation;
                                                          b) new lots are created to allow for suitable
7                                                         house site areas or other future buildings
                                                          and works to be located within existing
                                                          cleared areas or areas of low ecological
                                                          value; and
                                                        1 c) building envelopes are designated for each lot.
    Compliance
    S2.1 Performance Solution - The new boundaries are acknowledged to transect the EPA overlay
    however as identified within the attached Vegetation Assessment this area contains a low ecological
    value. This area is identified to contain four tree species. Two of these species are exotic species
    planted for landscaping purposes. The proposed lots are suitably sized to support the future
    construction of residential dwellings.


    03 Interference with vegetation only occurs           53. 1 No solution provided
    where-
    a) no other suitable cleared or partially
    cleared area is available on the
    premises;
    b) the development minimises the total
    footprint within which all activities,
    buildings, structures, driveways and
    other works are contained; and
    c) the development is located in areas of




                                          BRSS6220.000 Report for Lodgement                             63

Page 66

     LANDPARTNERS



      low ecological value over other areas, to the
      greatest extent practicable.


      Compliance
      03 Complies - The attached vegetation assessment identifies the EPA overlay has containing a low
      ecological value and has proposed dwelling contains significant additional replanting. The proposal
      is for a reconfiguration and no building is proposed. The proposed allotments will achieve access via
      the existing driveway.
       Wetlands                                             S4. 1 A minimum separation distance of 100m
       04 Wetlands are protected from removal or            is provided between a wetland and any adjacent
      degradation and any adverse impacts on                development or use.
       wetlands are prevented, minimised or
      mitigated by-
      a) maintaining adequate separation between
      the wetland and any adjacent
      development or use 12;
      b) minimising any modification of the natural
      characteristics of the wet/and, including
      the topography, surface and groundwater
      hydrology, water quality and flora and
      fauna species;
      c) preventing any new development within
      wetlands;
      d) minimising access to the wp//nnri,
      e) minimising impacts associated with pest
      insect control and invasion by undesirable
      plant species; and
      f) providing for the rehabilitation and replanting
      of degraded wetlands.
      Compliance
      S4.1 Complies - The development is not within 100m from a wetland.
      Riparian Buffer Area                              55.1 No new development occurs on, or partly
       05 The biodiversity and ecosystem values         on, premises indicated as Riparian Buffer Area
      of watercourses, drainage lines, wetlands and     on Biodiversity Overlay Maps OM 1.1 to
      adjacent riparian zones are protected by-         OM9.1, except for-
      a) avoiding any new development in the            a) temporary use of the land; or
      riparian buffer area;                             b) infrastructure which provides access to a
      b) retaining aquatic and terrestrial habitat      watercourse for recreational purposes;
11
      in riparian zones;                                OR
      c) maintaining wildlife corridors along           55.2 Where constructing a Detached house
       watercourses and drainage lines for              or Community residence and on an allotment
      native fauna movement;                            situated wholly within the Riparian Buffer Area,
      d) avoiding edge effects and incompatible         a) fronting the Noosa River - development
      uses in riparian zones;                           is setback a minimum of 40m from mean
      e) maintaining bank stability by minimising       high water spring or as otherwise
      bank erosion and slumping;                        prescribed by the Environmental
      f) maintaining water quality by filtering         Protection Agency's Erosion Prone Area
      sediments, nutrients and other                    Maps; 13
      pollutants; and                                   b) not fronting the Noosa River -
      g) removing undesirable plant species and         development is located outside the
      replacing them with vegetation of local origin;   riparian zone and setback a suitable
                                                        distance from the watercourse having
                                                        regard to the development constraints of
                                                        the property and the need to protect
                                                        environmental and riparian values;
                                                             OR
                                                             55.3 For Animal husbandry on premises in
                                                             the Rural Zone-
                                                           I a) stock proof fencing is installed along




                                            BRSS6220.000 Report for Lodgement                            i•:

Page 67

jjjLk,nl!ARTNERS



                                                          watercourses at a distance of no less

                                                         than 10m from the top of the bank;

                                                         b) stock watering points are located no less
                                                         than 15m away from the top of the bank
                                                         of watercourses; and
                                                         c) stock crossing points across
                                                         watercourses are defined and controlled
                                                         with stock proof fencing,
                                                         to prevent stock from damaging riparian
                                                         vegetation or banks to watercourses;
                                                         OR
                                                         55.4 Recreational facilities (including
                                                         playgrounds, pergolas, barbeques etc) are
                                                         setback a minimum of 30m from the top of the
                                                         bank of a watercourse and 1 Om from the top of
                                                         the bank of a drainage line;
                                                         OR
                                                         55.5 For Forestry uses the cultivated area is
                                                         separated from watercourses by a distance not
                                                         less than the distances identified below,
                                                         measured from high water mark or the top of
                                                         the bank, whichever is the greater distance-
                                                         Feature Distance
                                                         Stream order 1 or 2 5 m
                                                         Stream order 3 or 4 10 m
                                                         Stream order greater than 4 20 m
                                                         AND
                                                         55.6 Where Forestry is carried out on that
                                                         part of premises indicated as Riparian Buffer
                                                         Area and outside the separation distances
                                                         specified in 55.5-
                                                         a) species planted are of local origin and are
                                                         harvested through sustainable harvesting;
                                                         and
                                                         b) any undesirable plant species are replaced by
                                                         vegetation of local origin.
     Compliance
     05 Not Applicable - The site is not within a riparian buffer area.
     Koala Habitat Areas 14                               S6. 1 and S7. I Koala sensitive development
     06 Development is designed, constructed              design and measures are implemented in
     and operated to avoid adverse impacts on             accordance with Section 6 Policy 1 - Koala
     koalas and koala habitat and includes                sensitive design as contained in the Nature
     measures to assist the survival of koala             Conservation (Koala) Conservation Plan 2006
     populations in the area.                             and Management Program 2006 - 2016.
    AND
     Compliance
     06 Not Applicable - The site is not within a Koala Habitat Area.
    O7Development provides for koala                     56. 1 and 57. 1 Koala sensitive development
    movement across the landscape through its            design and measures are implemented in
    design and layout by incorporating koala             accordance with Section 6 Policy 1 - Koala
    sensitive development                                sensitive design as contained in the Nature
                                                         Conservation (Koala) Conservation Plan 2006
                                                         and Management Program 2006 - 2016.
    Compliance
    07 Not Applicable - The site is not within a Koala Habitat Area.
    Open space networks & wildlife corridors            58. 1 Vegetation is enhanced through
    08 Open space networks and wildlife                 revegetation and vegetation maintenance in




                                          BRSS6220.000 Report for Lodgement                             65

Page 68

LANDPARTNERS
w+.M ++.•rwrwwl wwwwMYwL




  corridors are maintained and embellished to           areas indicated in Schedule 5 on Map 4 - Open
  provide for viable connectivity between               Space Networks.
  vegetation by protecting and replanting               AND
  vegetation of local origin-                           58.2 Existing wildlife corridors are retained and
  a) along watercourses, drainage lines and             embellished to a minimum width of 100m.
  ridgelines; and
  b) as linkages between areas of remnant
  vegetation, including-
  i. across property boundaries;
  ii. to areas of national park, conservation park,
  State forest or reserve; and
  iii. into adjoining local government areas.
  Compliance
  08 Not A pp licable - To this a pp lication.
  Scenic amenity                                        S9. 1 and 510.1 Vegetation is retained and
  O9The scenic amenity and vegetated                    enhanced-
  character of the locality and its watercourses,       a) within 30m of prominent ridgelines and
  drainage lines, sloping land and ridgelines is        hillslopes;
  retained and enhanced;                                b) in gullies;
  AND                                                   c) along watercourses and drainage lines;
  010 Vegetation which makes a positive                 and
  contribution to the streetscape or major road
  network is retained.                                  d) within l Om of road reserves.

  Compliance
  S9.1 & 510.1 Complies - The site is not situated on a prominent ridgeline or hillslope, gully or along
  a watercourses and drainage line. No vegetation is proposed to be removed within I Om of the road
  reserve.
  Habitat trees                                       511. 1 No clearing of koala habitat trees
  011 Habitat trees (including dead trees) and        greater than 4m in height or with a diameter
  recruitment habitat trees are protected for native  greater than 100mm at 1.3m above the
  fauna habitat, where practicable.                   ground;
                                                        AND
                                                        S11.2 No clearing of other habitat trees or
                                                        recruitment habitat trees.
  Compliance
  Si 1 .1 Not Applicable -No clearing of koala habitat trees is proposed.
  S1 1 .2 Not Applicable - No clearing of other habitat trees or recruitment habitat trees.
  Lake Macdonald                                        No solution provided.
  012 Vegetation within 400m of the full
  ponded water within Lake Macdonald is
  retained.
  Compliance
  012 Not Applicable - To this application.

  Steep slopes                                          No solution provided.
  013 Vegetation on steep slopes is retained
  and managed to avoid erosion and landslide
  and to protect natural resources and values.
 Compliance
 013 Not Applicable - The subject site is not identified as a steep slope containing a longitudinal
 gradient of approximately 1:1 1 m.


 Engineering and site works                             514.1 Works, including roads, driveways,
 014 Development is sited and designed to-              fences, sewer lines and other infrastructure-
 a) provide adequate separation distance                a) do not transect areas of vegetation; or
 between the vegetation to be protected                 b) are co-located within a combined utility
 and the development to avoid                           corridor; and
 disturbing, destabilising and                          c) provide for fauna underpasses, speed




                                          BRSS6220.000 Report for Lodgement                           66

Page 69

LANDPARTNERS



 deoxygenbting any tree or altering the                reduction devices and associated
 drainage;                                             fencing, lighting and warning signs,
 b) avoid traversing or fragmenting                    where appropriate;
 vegetation or habitats for significant flora          AND
 and fauna species; and                                514.2 Development within or adjacent to
 c) avoid creating barriers to faunal                  areas of vegetation, incorporate fauna friendly
 movement.                                             fences;
                                                       AND
                                                       514.3 Vegetation is protected from
                                                       interference resulting from clearing or
                                                       construction activities by-
                                                       a) clearly marking vegetation to be retained with
                                                       flagging tape;
                                                       b) installing protective fencing around the
                                                       dripline of the vegetation and avoid
                                                       filling and excavation in these fenced
                                                       areas; and
                                                       c) ensuring stock piling, storage and
                                                       vehicle parking occur outside the
                                                       identified vegetation areas;
                                                       AND
                                                        14.4 Low impact construction techniques are
                                                       used around vegetation to minimise
                                                       interference with the vegetation.
 Compliance
 514.1 Complies -All services will be located within a trench in the existing access driveway. No fences
 are proposed as part of this development. No roads are proposed as part of this development.
  S14.2 Complies - The development is for an infill subdivision and fauna friendly fences can be
 conditioned as part of any development approval.
 S14.3 Complies - Vegetation to be retained will be clearly marked, protected by fencing and no
 stockpiling/storage will occur outside the identified vegetation area.
 Si 4.4 Not Applicable - The proposal is for an infill subdivision.


 Filling and excavation                                No solution provided.
 015 Vegetation is not adversely impacted
 upon by earthworks and changes to the
 hydrological regime, including changes to
 7round water levels, flooding levels, run-off
 and tidal hydraulics.
 Compliance
 015 Not Applicable - No filling or excavation proposed.


 13.10 Vegetation management
 Replanting and rehabilitation                         516.1 Landscaping complements and
 016 Vegetation is enhanced through the                supports important habitats by-
 following measures:                                   a) utilising native plants of local origin;
 a) siting landscaped areas to complement              b) utilising suitable plant species identified
 and enhance existing vegetation;                      in PSP3 - Landscaping Plants and
 b) removal of all species likely to displace          Guidelines;
 native flora species or degrade fauna                 c) replicating adjacent remnant habitats,
 habitat;                                              including understorey vegetation;
 c) replanting and rehabilitating 15 degraded          d) creating or enhancing linkages between
 habitat; and                                          existing habitats;
 d) replacing any vegetation removed with              e) avoiding the use of Undesirable Plant
 suitable replacement vegetation of local              Species listed in Table 9.1 of PSP3
 origin.                                               Landscaping Plants and Guidelines; and
                                                       f) planting riparian zones to filter
                                                       stormwater run-off and provide for
                                                       wildlife habitat;




                                         BRSS6220.000 Report for Lodgement                              67

Page 70

    LANDPARTNERS


                                                          AND
                                                          516.2 Vegetation removed is replaced with-
                                                          a) the equivalent number of trees or plants
                                                          of local origin; or
                                                          b) twice the number of trees or plants of
                                                          local orlin.
     Compliance
     S16.1 Complies - The attached vegetation assessment includes replanting recommendations
     including;
          •  plant six Pondanus pedunculats
          •   plant 20 Casuarina equisetiflia
          •   plants are to be well established specimens in 200mm pots with a minimum height of
             500mm
         •   plants are to be sourced from endemic (local) seed stock if this is practical
         •   plants are to be protected by plastic trees sleeves with three timber stakes and mulched for a
             diameter of 100cm
         •   prickly pear and asparagus vine is to be removed in the area 20m each of the east
             boundary.
     S16.2 Complies -The proposal recommends replanting 26 trees which is well in excess of the
     requirements.
     Fire management                             No solution provided
     017 Fire management measures are
     adopted based on ecological principles,

     a) maintain and enhance biodiversity;
     b) minimise threat of fire to the natural
     environment, life and property; and
     c) provide for effective use and
     maintenance of buildings and structures.
     Compliance
     017 Complies - The attached Bushfire Assessment identifies the site as being low risk from both
     internally risk and external risk.



    Natural Hazards Overlay Code

     Column 1                                             col=12
n    Specific outcomes                                    Acceptable solutions (if self.ossessable)
                                                          Ptobabre solutions (iif code assessable)
     13.32 Effects of use
     General                                              51.1 The proposed development is not
     01 Development is located to ensure it does not      located in a landslide hazard area as
     compromise the safety of people, property or         indicated on Overlay Maps OM1.3-0M9.335;
     hazardous materials manufactured or stored in        OR
     bulk by increasing risk of landslide;                51.2 The development site is not subject to
     AND                                                  landslide, either internally or from sloping
                                                          land above the site {eg. slopes are less than
                                                          1 in 10 (10%)
                                                          AND
                                                          51.3 Development, including necessary
                                                          earthworks within Precinct F of the Nooso
                                                          Springs site, improves the stability of any
                                                          non-natural landform so it is not at risk from
                                                          landslide either on the site or from sloping
                                                          land above the site.
     Compliance
     Si .1 Not Applicable - The proposal complies with 51.2
     Si .2 Complies - A Slope Stability Assessment (Appendix E) has been included within the report which
     identifies the site as low risk of landslip. This assessment uses the Guidelines for Landslip Risk




                                          BRSS6220.000 Report for Lodgement                            68

Page 71

LNRPARTNERS


   Management Framework as provided by the Australian Geomechanics Society. The report also
   includes Hazard Mitigation - Construction Recommendations for the future development of the
   proposed allotments.
   S1.3 Not Applicable - The subject site is not within precinct f of the Noosa Springs Site.
   02 Development, including accessways is               52. 1 No solution provided
   designed and constructed to-
   a) minimise impacts on the natural landform;
   b) minimise risk to people and property from
   landslide;
   c) avoid any potential instability and associated
   problems, including long term stability of the site
   and long term stability of the development.
   Compliance
   02 Complies - The development is for a residential subdivision and does not impact on the natural
   landform. The attached slope stability report includes construction recommendations for the future
   development of the proposed lots.
   Protection of Infrastructure and Community          53.1 Community Uses and Infrastructure
   Uses                                                Uses are not located in a landslide hazard
   03Community Uses and Infrastructure Uses            area as indicated on Overlay Maps OM1.3-
   including that identified below, are able to        OM9.3;
   function                                            OR
   effectively during and immediately after landslide  S3.2The community infrastructure
   events-                                             development-
   r,)                                                                     t in any new building
   b) Hospitals;                                         work other than an addition to an
   c) Education Type 4 uses, including stores for        existing building;
   valuable records or items of historic or cultural     b) does not involve vegetation clearing;
   significance; and                                     and
   d) Service and utility uses, including electricity    c) does not alter ground levels or
   substations, major electrical depots and water        stormwater conditions;
   treatment plants.                                     OR
                                                         S3.3The development includes measures
                                                         that ensure-
                                                         a) the long term stability of the site;
                                                         b) access to the site will not be impeded
                                                         by a landslide event; and
                                                         c) the community infrastructure will not
                                                         be adversely affected by landslides
                                                         originating on sloping land above the
                                                         site36.
   Compliance
   03 Not Applicable - No Community Uses and Infrastructure Uses are proposed by the development.
   Table 13.9 Bushfire hazard areas
   13.33 Effects of use and works
   New Uses                                              54. 1 The use is sited on land that is not in a
   04 The proposed use does not compromise               Medium or High Bushfire Hazard Area38;
   the safety of people or property from bushfire.       OR
                                                         54.2 The use is sited on land that is determined
                                                         as low bushfire risk by a site specific bushfire
                                                         hazard assessment.3
   Compliance
   04 Not Applicable - The proposal is for a Reconfiguration of a Lot.
   Protection of Infrastructure and Community            55.1 Community Uses and Infrastructure
   Uses                                                  Uses are not located in a High or Medium
   05 Community Uses and Infrastructure                  Bushfire Hazard Area identified on Overlay Maps
   Uses, including that identified below, are able       OM 1 .4 to OM9.4;
   to function effectively during and immediately        OR
   after bush fire events-                               S5.2 Building work will not involve more than an
   a) Emergency service facilities;                      additional 20m2 of gross floor area to an




                                           BRSS6220.000 Report for Lodgement                               69

Page 72

     b) Hospitals;                                          existing
     c) Education Type 4 uses, including stores             building;
     for valuable records or items of historic or           OR
     cultural significance; and                             55.3Where located in a High or Medium
     d) Service and utility uses, including                 Bushfire Hazard Area identified on Overlay
     electricity substations, major electrical              Maps OM1.4 to OM9.4, uses are designed to
     depots and water treatment plants.                     function effectively during and immediately after
                                                            bushfire events40,
     Compliance
     05 Not Applicable - No community uses and infrastructure uses are proposed.
     Hazardous materials                             S6. 1 Hazardous materials are not manufactured
     06 Public safety and the environment are not    and stored on the site
     adversely affected by the detrimental impacts
     of bushfire on hazardous materials
     manufactured or stored in bulk.
     Compliance
     S6.1 Not Applicable - No hazardous materials are stored on the site.
     13.34 Siting, design and construction
fl   07Uses and works including building works              57.1 Uses and works including building works
     are sited, designed and constructed to-                are sited-
     a) minimise the number of people and                   a) on lots greater than 2500m2;
     property subject to bushfire risk; and                 i) in locations of lowest hazard within
     b) maximise the protection of people and               the lot (Figure 13.5 provides
                                                            guidance): and
     front.                                                 ii) to achieve setbacks from hazardous
                                                            vegetation of 1.5 times the
                                                            predominant mature canopy tree
                                                            height or 1 Om whichever is the
                                                            greater; and
                                                            iii) 10m from any retained vegetation
                                                            strips or small areas of vegetation;
                                                            and
                                                            iv) so that the elements of the
                                                            development least susceptible to
                                                            fire are sited closest to the bushfire
                                                            hazard;
                                                            b) on lots 2500m2 or less - to maximise
                                                            setbacks from hazardous vegetation37
     Compliance
     07 Not Applicable - No buildings are proposed a         art of this development.
      13.35 Water supply for fire fighting
     O8An adequate and accessible water supply              58. 1 For premises not in a water service area-
     is provided for fire fighting purposes.                each lot has an accessible dam, swimming pool
                                                            or water tank accessible by the fire brigade that
                                                            contains at least 5000 litres of water
     Compliance
     S8.1 Complies - The site is in a water service area.
     13.36 Vehicle access and fire trails
     Firebreaks and fire access tracks                      S9. 1 Firebreaks are provided by-
     09 Firebreaks or fire access tracks provide-           a) a cleared road reserve not less than 20m
     a) adequate access for fire fighting and               wide located around the perimeter of the
     other emergency vehicles; and                          development;
     b) adequate width to minimise the risk of              OR
     fire crossover.                                        b) fire access tracks between the
                                                            development and surrounding vegetated
                                                            lands that-
                                                            i. are a minimum cleared width of 6m;
                                                            ii. have a maximum grade of 1 in 8
                                                            (12.5%) ;




                                           BRSS6220.000 Report For Lodgement                              70

Page 73

    IAND^^:RtriERS


                                                              iii. have a formed pavement;
                                                              iv. have access at each end and in other
                                                              locations where necessary;
                                                              v. have passing areas and turning areas;
                                                              vi. have clearly identified access points
                                                              for emergency vehicles; and
                                                              vii. are located on public land or within
                                                              access easements that are granted in
                                                              favour of the Sunshine Coast Regional
                                                              Council and the Queensland Fire and
                                                              Rescue Service.
     Compliance
     59.1 Not Applicable - Refer to S 1 1.1.
     13.37 Reconfiguring a Lot
     General                                                  510. 1 The proposed lots are not located on land
     010 The safety of people and property are                that is subject to Medium or High Bushfire
     maintained by                                            Hazard on overlay maps OM1.4-0M9.442;
     a) Locating house site areas and other                   OR
C    sensitive uses on that part of the land                  510.2 The proposed lots are sited on land
     least affected by the bushfire hazard;                   determined as low bushfire risk by a site specific
     and                                                      bushfire hazard assessment.43
     b) fire mitigation methods are used that are             AND
     adequate for the Potential Bushfire                      S10.3Additional lots are not created where their
     Hn7nrd rating of th individual site.                     only vehicular access route is through a Medium
     having regard to -                                       or High Bushfire Hazard area shown on overlay
     i. vegetation type;                                      maps OM1.4-OM9.4
     ii. slope;
     iii. aspect;
     iv. on-site and off-site fire hazard
     implications of the development;
     v. bushfire history;
     vi. conservation values of the site; and
         on)oing mainte nance.

     Compliance
     S10.1 Not Applicable - The proposal complies with S10.2.
     510.2 Complies - The subject site is located within the Medium Bushfire Hazard overlay map. A
     Bushfire Assessment has been undertaken which identifies the potential bushfire risk as very low due
     to the extensive development in the Sunshine Beach area and the narrow foreshore reserve. As
     assessment against the SPP 01 /03 provides a methodology for ground truthing the Potential Bushfire
     Hazard of any site and immediate surrounds. As this site is not carrying any assessable vegetation, it
     therefore scores less than 2 and no further assessment is required.
     S10.3 Complies - The proposed lots achieve vehicle access via the existing handle which is outside
     the bushfire overlay. Furthermore the attached Bushfire report identifies the site as being a very low
     risk. Based on this it is clear vehicles can exit safely the site in the unlikely event of a bushfire.




                                             BRSS6220.000 Report for Lodgement                                71

Page 74

LAN l!A!TNERS



 Firebreaks and fire access tracks                   511.1 Firebreaks are provided by-
 011 Firebreaks or fire access tracks provide-       a) a cleared road reserve not less than 20m
 a) adequate access for fire fighting and            wide located around the perimeter of the
 other emergency vehicles; and                       subdivision, between the created lots and
 b) adequate width to minimise the risk of           surrounding vegetated lands;
 fire crossover.                                     OR
                                                     b) fire access tracks (may be in the form of an
                                                     access easement) between the created
                                                     lots and surrounding vegetated lands
                                                     that-
                                                     i. are a minimum cleared width of 6m;
                                                     ii. have a formed pavement;
                                                     iii. have access at each end and in other
                                                     locations where necessary;
                                                     iv. have passing areas and turning areas;
                                                     v. have clearly identified access points for
                                                     emergency vehicles; and
                                                     vi. are located on public land or within
                                                     access easements that are granted in
                                                     favour of the Sunshine Coast Regional
                                                     Council and the Queensland Fire and
                                                     Rescue Service.

 Compliance

 considered appropriate. Furthermore a Bushfire Hazard Assessment identifies the site as very low risk
 and states that bushfire is not a limiting factor for the proposed subdivision.
 Road network                                       512. 1 Culs-de-sacs or no-through roads are not
 012 Roads provide for the safe and effective       used in the street network unless-
 evacuation of users of premises and access by      a) a perimeter road reserve with a minimum
 Emergency services.                                reserve width of 20m and a formed width of not
                                                    less than 6m is provided; or
                                                    b) cul-de-sacs or no-through roads are
                                                    provided with fire trails or access
                                                    easements, capable of being navigated by
                                                    conventional vehicles, that link to through
                                                    roads (see Figures 13.3 and 13.4);
                                                    AND
                                                     512.2 Roads have a maximum grade of 1 in 8
                                                     (12:5%).
Compliance
012 Not Applicable - No roads are proposed as part of this development application.
Lot design                                       513.1 Each residential Iot-
013 Lot design and building siting minimises     a) includes a house site area, identified on the
bushfire hazard to people and property having    plan of subdivision;
regard to slope, aspect, existing vegetation and b) is of sufficient size and dimensions to
adequate separation from hazardous               accommodate a dwelling and ancillary
                                                 buildings and use areas;
                                                 c) for lots more than 2,500m-
                                                 i. conform with the principles for house
                                                 site numbers 1, 2 or 3 shown in Figure
                                                 13.5; and
                                                 ii. are separated from hazardous
                                                 vegetation for a distance the minimum
                                                 of 1.5 times the predominant mature
                                                 canopy height or 10m, whichever is the
                                                 greater; and
                                                 d) for lots less than 2,500m2, maximise
                                                 separation of buildings from hazardous
                                                 vegetation




                                     BRSS6220.000 Report for Lodgement                              72

Page 75

      LANDPARTNERS


                                                             S13.2 Residential lots are designed so that their
                                                             size and shape allow for efficient emergency
                                                             access to buildings for fire fighting appliances
                                                             (e.g. by avoiding long narrow lots with long
                                                             access driveways).
                                                             Figure 13.5-House sites in bushfire hazard
                                                             areas
       Compliance
       13.1 Performance - The proposed allotments are suitably sized to ensure future houses can be
       constructed. The Bushfire Assessment identifies the site as being very low risk and consequently there
       will be no bushfire requirements for the sitting of future dwellings.
       Table 13.10 Flood Hazard areas
       Compliance
       Not Applicable - To this application.
       Table 13.12 Acid sulfate soil areas
       Compliance
       Not Applicable - To this application.



      Natural Resources Overlay Code

       column 11                                             cotumr 2

                                                             Probable solutions (if code a nwaN d

       Table 13.17 Coastal Protection Areas
       016 The siting and design of development and     516.1 A mix of native landscaping, such as
       materials used within the Coastal Protection     ground covers, shrubs and trees, is provided for
       Area, as identified on the Natural Resources     a width of 5m from the seaward or rear
       Overlay Maps, do not cause any significant       boundary of the site to provide adequate
       adverse impacts on the coastal resources of the  landscape buffering to protect the coastal dune
       location nor interrupt the natural cycles of     system.
       erosion and accretion of foreshore areas and
       beaches. AND
       Compliance
       516.1 Complies - The development is for a reconfiguration and this can be included as part of any
       future development.

1-1
       077 Buildings, structures and works within the        517.1 A mix of native landscaping, such as
       Coastal Protection Area that are visible from the     ground covers, shrubs and trees, is provided for
       beach-                                                a width of 5m from the seaward or rear
       a) are designed to protect the character of the       boundary of the site to provide adequate
       beachfront when viewed from the water                 landscape buffering to protect the character of
       and integrate with the surrounding natural            the beachfront.53
       landscape and skyline vegetation (see
       Figure 13.6); and
       b) are finished predominately in colours and
       hues of the surrounding natural landscape
       Compliance
       S17.1 Complies - The development is for a reconfiguration and this can be included as part of any
       future development.


       018 Buildings and other structures including          S18. 1 No solution provided.
       swimming pools and retaining walls do not
       extend seaward of the coastal building line51
       except-
       a) uncovered and unenclosed cantilevered
       balconies that do not extend greater than
       3m seaward of the coastal building line;




                                               BRSS6220.000 Report for Lodgement                           73

Page 76

    UINDPARTNERS


    and
    b) are setback a minimum of 6m from the
    seaward boundary (See Figure 13.7).
    AND
     Compliance
     018 Not Applicable - The proposal is for a reconfiguration.


     019 Where a coastal building line does not exist
     on properties fronting the beachfront or a reserve
     adjoining the beachfront- buildings, other
     structures and retaining walls are setback a
     minimum of 6m from the seaward boundary of
     the site
    AND
      Compliance
     019 Not Applicable - The proposal is for a reconfiguration.


    020 Rear fences adjacent to the beachfront            520.1 Rear fences adjacent to the beachfront
C   within the Coastal Protection Area are designed       within the Coastal Protection Area incorporate
    and sited to be sympathetic with the visual           the following-
    amenity of the beachfront and do not degrade          a) no more than 1.2m in height; and
    the natural beachfront character.                     b) open construction (ie at least 50%
                                                          transparent);
                                                          c) lightweight materials lie timber); and
                                                          d) dark colours to blend with the natural
                                                          landscape.
                                                          AND
                                                          520.2 Gates are not installed in fences to gain
                                                          direct access to the beachfront.
    Compliance
    020 Not Applicable - The proposal is for a reconfiguration.




E




                                          BRSS6220.000 Report for Lodgement                            74

Page 77

       LANDPARTNERS




     Appendix B : Proposed Plan
     Prepared by LandPartners Limited




is




C




                                        BRSS6220.000 Report for Lodgement   75

Page 78

                                                                                                                                                                                                                                                                                               CLIENT

                                                                                                                                                                                                                                                                                                ASTRONOMER PTY LTD
                                                                                                                                                                                                   LEGEND                                N/A    EXISTING CAR PARKING
                                                                                                                                                                                                                                                                                               PROJECT
                                                                                                                                                                                                             SITE BOUNDARY              TBA     PROPOSED NOMINAL
                                                                                                                                                                                                                                                CAR PARKING (Refer toLandPartners                               PROPOSED
                                                                                                                                                                                                     N/A     STAGE BOUNDARY
                                                                                     2                                                                                                                                                          Small Lot Plan BR- -.000-M)                                 RECONFIGURATION
   60 s                                                                           APISf1IJ                                                                                                          F----l   EXISTING BUILDING
                                                                                                                                                                                                       --    (To be removed)
                                                                                                                                                                                                                                         N/A    PROPOSED STORM WATER
                                                                                                                                                                                                                                                                                                           OF LOT 2 ON RP 234161
                                                                                                                                                                                                                                                DETENTION AREA

H                                          61
                                                                                                                                                                                                    -----

                                                                                                                                                                                                     N/A
                                                                                                                                                                                                             DRAINAGE LINE

                                                                                                                                                                                                             EXISTING DAM
                                                                                                                                                                                                                                         N/A    LAND DEDICATED FOR
                                                                                                                                                                                                                                                COMMUNITY PURP OSES
                                                                                                                                                                                                                                                                                                ^^^ SUNSHINE TCOAST REGIONAL COUNCIL
                                g                                                                                                                                                                            Q100 FL000UNE                                                             I                      NOOSA DISTRICT
                            V                                                                                                                                                                        NIA                                        PROPOSED
                                                                                                                                                                                                                                                RESIDENTIAL LOTS                           I   NOTES
                                p                                                                                                                                                                                                                                                               (i) This plan was prepared or the purpose and exclusive use of
     602                        %                                                                                                                                                                    N/A     EXISTING EASEMENT                                                                  ASTRONOMER PTY L TD t o accompany an app l ca t ion t o            SUNSHINE

    Ae4812                                          `3A^         Fq                                                                                                                                                                                                                             COAST REGIONAL COUNCIL for approval to reconfigure the land
                                                                                                                                                                                                                                                                                                described in the plan andsnottobcuscdforany Other purpose of by
                                                        f9^- ,        `11A -                                                                            /                                                    PROPOSED                                                                          any other person or corporation.
                                                                                                                                                  RP151243                                                   ACCESS EASEMENT
                                                                                                                                                                                                             ()                                                                                LandPanners Limited accepts no responsibility for any Ion or damage
                                                                                                                                                                                                                                                                                               suffered howsoever arising to any person or corporation who may use
                                                                                                                                                                                                                                                                                               or rely on(i this plan in contravention of the terms of the clause or
                                                                                                                                                                                                                                                                                               clauses (il),tlll) or (rv) hemof.
                                                                                                                                                                                                                                                                                                                          hCrcof


                                                        W34161                                                                                                                                                                                                                                 (r i ) Th e contours shown i n the plan are su it able on l y b r the purposes of
                                                                                                                                                                                                                                                                                                this applcafion. The accuracy of ft contours hr nor been verified and
                                                                                                                                                                                                                                                                                               no rohence should be placed upon such contours for any other purpose
                                                                                                                               I                                                                                                                                                               other than the purpose of the appficaton for reconfigurabah,
                0

             aLrP5615                                                                                                                                                                                                                                                                          00 Tlq dmamions, areas. number of bit. Brae and location of
                                                                                                                           _         -`                                                                                                                                                        -orovemaNS B flood ntormaton (d shown) are approximate only and
                                                                                                                                                                                                                                                                                               may vary.

                                                                                                                                                                                                                                                                                               (n) The pion may not be coped unless these notes are rlduocd


                                                                                                                                                                                                                                                                                               STAGE No OF                NEW ROAD               AREA OF               TOTAL
                        0                       9                                       f /i                                                                       I                                                                                                                                 LOTS                                           PARK               AR A

                                                                                                                                                                         0/17                                                                                                                  TOTAL           3                  -                     -           0.2653 ha



                                     599                                                  r y                                        1                                                       Ir
                                    RP16112                                         (             • 1a               W
                                                                                                                     O               ;   I        r ^              ^ ,^                      r^l




                                                      598                                                                                                                                                                                                                       Ille            5m            0                                    15                        25m
                                                     9^If2                                                                                    ,         aj>


                                                                                                                                                                                                                                                                                                                   SCALE 1:500 @ A3
                                                                                                                                                   = _ -80 m 2
                                                                        597                                                                                                                                                                       159
                                                                       Rwerrz                                                                                      _l                                                                           aaQa9ree                                                           ^

                                                                                                                                                                                                                                                                                                                              LANDPARTNERS
                                                                                                                                                                                                                                                                                                                       It built environment consultants


NOTE:
SURROUNDING                                                                                                 596                                         3m 2
INFORMATION IS DCDB                                                                                         RPaeru                                                                           "S                                                                                                 o,uwncma
                                                                                                                                                                                                                                                                                                     Kay t^^                            t0n642 • zn
                                                                                                                                                                           24844                                                                                                                v n ao aaa                              (07)3W 130
                                                                                                                                                                                                                                                                                                  Sox 3918                            a mo(g^rardDarrers;a-^.
CONTOUR INFORMATION DERIVED                                                                                                                                                                                                                                                                     Sm,ingnsbra3CQ.f'         T                    , owrsc.                ..,
FROM DETAIL SURVEY BY
                                                                                                                                                                                 9
KINM O RLEY & A SSOC . PTY LTD                                                                                                                                                                                                                                                                 LEVEL DA T UM ASSUMED
DRAWING NO . 05072-a                                                                                                                                                                 s'y
                                                                                                                            595
DATED 24/ 06/ 2005.                                                                                                                                                                                                                                                                            BASE ORIGIN                DETAIL SURVEY AY
                                                                                                                           RP48112                                                                                                                                                                                        K IMMO RL Y. y A s0 Pr LT
                                                                                                                                                                                                                                                                                                                          Drawing o. 050 Y2a % ated 24/06/2ofi5
                                                                                                                                                                                                                                                                                               CONTOUR INTERVAL
PROPOSED RETAINING WALL                                                                                                                                                                                                                                                .
L OC ATION, INF O RMATI O N REFER T O                                                                                                                                                                                                                                                          CO MP UTER FILE
PLANNING REPORT APPENDIX E                                                                                                                                                                                                                                                                                                               622000A0
SLOPE STABILITY ASSESSMENT                                                                                                                                                                                                                                                                     DRAWN                   nA                DATE                3n2/2otf
PREPARED BY SCG CONSULTING
ENGINEERS 22 NOVEMBER 2011.                                                                                                                                                                                                                                                                    CHECKED                                   DATE
                                                                                                                                                  594
                                                                                                                                                  eeverz                                                                                                                                       APPROVED                                  DATE


                                                                                                                                                                                                                                                                                               PLAN NUMBER                                                               REV

                                                                       ^:bl_^ ^     v_       " , ' 1 + .1                a Lq^VQr^           ^__ '            ^^       ' ;kb1   1^ti6n^QUIRc ^+ rS cnaL ' 7D^EM[N r OF'UR F PLANSr',   THE DEPT OPEN /RON4yfN/&RE.SOURCEMANAGEMENT                             BRSS 6220 . 000-01                                            A

Page 79

       LANDPARTNERS




     Appendix C : Title Documents
     Lot 2 on RP234161




r.




                           BRSS6220.000 Report for Lodgement   76

Page 80

                         CURRENT TITLE SEARCH
                  ENVIRONMENT AND RESOURCE MANAGEMENT, QUEENSLAND
 R c.luest No: 12909570
Search Date: 13/12/2011 11:42                         Title Reference: 18010158
                                                          Date Created: 09/08/1990


Previous Title: 14869209


REGISTERED OWNER


Dealing No: 707151471 03/11/2003

ASTRONOMER PTY LTD A.C.N. 050 412 907
                             TRUSTEE
      UNDER INSTRUMENT 707151471

ESTATE AND LAND

 Estate in Fee Simple

 LOT 2       REGISTERED PLAN 234161
             County of MARCH              Parish of WEYBA
             Local Government: SUNSHINE COAST

EASEMENTS, ENCUMBRANCES AND INTERESTS



     1.   Rights and interests reserved to the Crown by
          Deed of Grant No. 11805207 (POR 28)


     2.   MORTGAGE No 713049609 11/02/2010 at 11:29
          NATIONAL AUSTRALIA BANK LIMITED A.B.N. 12 004 044 937


ADMINISTRATIVE ADVICES - NIL
UNREGISTERED DEALINGS - NIL




CERTIFICATE OF TITLE ISSUED - No

Caution - Charges do not necessarily appear in order of priority


                         ** End of Current Title Search **


COPYRIGHT THE STATE OF QUEENSLAND (ENVIRONMENT AND RESOURCE MANAGEMENT) [2011)
Requested By: D APPLICATIONS ABR




                                                                          Page 1/1

The text continues on page 81.

Used in these records

About this file

File size
24.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 Application Forms REC11_0145.pdf · 24.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.