Council archive · source document
Development Application part 2 Application Forms REC11/0145
Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Step 2: Assessment of slope
A3.15 Studies have shown that fires burn more quickly and with greater intensity up slopes,
generally doubling every 10 degrees of slope. Also, the steeper the slope the more
difficult it is to construct ring roads, firebreaks and provide access for emergency crews.
Trees situated downhill from structures will have their crowns close to the structures. This
presents buslitire hazards particularly for exposed structures such as timber decks. Fable
A3.2 presents the hazard scores for different categories of slope.
Table A3.2: Hazard scores for slope
Gorges and mountains (>30%) 5
Steep Hills (>200.%o to 30%) _ 4
Rolling Hills (>10% to 20%) 3
Undulating (>5% to 10%) 2
Plain (0°%o to 5%) 1
['Vote: For site-specific assessment of Mesh/ire hazard, i/'the site is downhill from the hazard, the slope
effect may be taken as zero as the f re intensity will he less. However, burning heavy /irels may roll downhill
and tires may fall down, so recommended setbacks from the hazard still need to be observed.]
Step 3: Assessment o aspect
A3.16 Aspect affects bush tire hazard due to the effects that exposure to direct sunlight has on
different vegetation communities, including the drying rates of fuels. Aspect also
correlates closely with exposure to low humidity winds that increase bushfire intensity. In
extremely broken country where there is a variety of aspects, the predominant aspect
should be used.
A3.17 As aspect has only a minor influence on flatter land, aspect is not considered to be
significant on land with a slope less than 5%. Table A3.2 lists the hazard score for
different aspects and Figure A3. I illustrates the compass degree ranges for each aspect
category.
P Table A3.2: Hazard score for aspect
North to North-Wes
North-West to West 3
West to South
North to East 1
East to South and all land under 5" ,% slope
si
See Appendix LO for the methodology for calculating slope.
SPP Guideline 1/03 June 2003
46
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.