Council archive · source document
Development Application part 2 Application Forms REC11/0145
Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
14.189 Infrastructure
015 Each lot is capable of being serviced by 515. 1 All lots are connected to power supply and
appropriate levels of- telecommunications services;
a) water supply; AND
b) reticulated sewerage;
c) stormwater drainage;
d) power supply; and
e) telecommunications;
AND
Compliance
S15.1 Complies - The proposed allotments can achieve connection to power supply and
telecommunication services
016 The design and provision of public services 516.1 For lots in urban settlements-power
and utilities, including sewerage, water, supply and communications infrastructure are
electricity, provided underground;
street lighting and telecommunication services- OR
a) meets the needs of users; 516.2 For lots elsewhere-power supply
b) ensures health, safety and convenience of the and communications infrastructure are
community; provided underground unless-
c) protects the natural environmental values of a) located in the Rural Zone or Rural
the site and surrounds, including visual Settlement Zone and where not in a
amenity and native vegetation; Bushfire Hazard Area as defined on
d) are cost effective over their life cycle; Overlay Maps OM 1.4-OM9.4;
e) minimises adverse impacts to the b) new low voltage lines can be strung
environment (including the amenity of the from poles carrying existing high
local area) in the short and long term; and voltage lines; or
f) ensures that the existing systems are c) no extensions to the existing
upgraded or relocated to be capable of reticulation network is necessary; or
supporting the proposed development; d) it is necessary to cross a body of water;
AND
516.3 Street lighting is provided in
accordance with Section 3.19 of PSP5
Engineering Design Standards - Roads,
Drainage and Earthworks;
AND
516.4 For lots not within a sewerage service
C area-the lot has sufficient area and other
attributes to ensure sustainable on-site sewerage
disposal;
Compliance
S16.1 Complies - Services will be provided underground along the easement.
516.2 Not Applicable - The subject site is within an urban settlement.
S16.3 Not Applicable - The development is an infill development and street light will not be
proposed.
S16.4 Complies - The proposed allotment will achieve connection to the reticulated sewer service.
F0/7 Essential public utilities are available and 517.1 Components of the infrastructure that
maintain their function during flood events up to are likely to fail or may result in contamination
a 1% AEP(1:100 year AR4 flood event. are-
a) located above the level of a 1 % AEP
(1 :100 year AR4 flood event; or
b) designed and constructed to exclude
water inundation or infiltration and resist
hydrostatic and hydrodynamic forces as a result
of inundation.
Compliance
517.1 Not Applicable - To this application.
BRSS6220.000 Report for Lodgement 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.