Council archive · source document
3365 261022 report · RAL19/0014.01
1 Grounds for Extension to Currency Period 1.1 SUBSTANTIALLY COMMENCED The development has substantially commenced with considerable costs met. Civil design is complete and an operational works approval was issued by Council as recently as August this year. This approval OPW26/0033 was included in the report by the Development Assessment Manager to the General Committee Meeting on 6/10/26. Minutes show that the report was unanimously carried. Fauna Management Plan completed and approved by Council with the OPW Flora Survey Report complete and Flora Exempt Clearing acknowledgement issued. Underground Services detection Topographic survey of upgraded Pottery Street surface, Red Street intersection, underground infrastructure, sewer inverts and subject property site. Cadastral survey of property boundaries and stake out of development Vegetation Management Plan for APZ, including Fire Break Trail Tree Retention. Tree Protection Plan for Pottery Street Road verge, including tree survey. Landscape Design Plan completed and approved by Council with the OPW Covenant Rehabilitation Management Plan completed and approved with OPW Weed removal commenced and ongoing. Unity Water Service Advice Notice Sewer Network Analysis submission to Unity Water Road Naming Application to Noosa Council Bushfire Management consulting regards Fire Break Trail The applicant can furnish receipts showing expenses between RAL approval 27/10/21 and today on the development total very close to $100k. 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3365 261022 report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.