Skip to the record
The gold standard in government transparency.

Council archive · source document

3365 261022 report · RAL19/0014.01

of 19

Text shows just the words. Original shows the document exactly as it was published.

Plate 2 – Pomona Infill Sewerage Scheme letter – 23/1/2013


The once off capital contribution and annual unconnected access fees for the last 13
years have been paid. The landowner has paid $10k to Unity Water for a service
that is not connected.

The development proceeding, by virtue of Council approving an extension to
currency, will enable connection to the extended main.

Without an extension to currency, the house will require connection to the sewer.

Trees between the house and sewer connection point will need removal so a house
drain can be installed.




                                           7

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

3365 261022 report.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.