Council archive · source document
3365 261022 report · RAL19/0014.01
Plate 2 – Pomona Infill Sewerage Scheme letter – 23/1/2013
The once off capital contribution and annual unconnected access fees for the last 13
years have been paid. The landowner has paid $10k to Unity Water for a service
that is not connected.
The development proceeding, by virtue of Council approving an extension to
currency, will enable connection to the extended main.
Without an extension to currency, the house will require connection to the sewer.
Trees between the house and sewer connection point will need removal so a house
drain can be installed.
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3365 261022 report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.