and hydraulic calculations that detail the drainage network and the capacities of the various
surface flow regimes shall be submitted to the Council for approval prior to obtaining a
Development Permit for Operational Works. Where flows are in excess of 100 litres/second
then a hydraulic grade line analysis will be required.
53. Stormwater is to be disposed of on site so as to cause no scouring, no damage to adjoining
properties, and no risk of causing slope instability to the reasonable satisfaction of the
Manager- Land Development. A Development Permit for Building Works shall not be granted
until a Development Permit for Operational Works has been issued in regard to the drainage
scheme.
54. The design plans are to show how Stormwater runoff within and from the site is to be controlled
both during construction and permanently. The plans are to indicate measures to be taken to
prevent erosion, slope instability and the export of sediment from the site and will embrace the
principles set out in the Institution of Engineers Australia Engineering Guidelines for
Queensland Soi! Erosion and Sediment Control, June 1996.
Environmental
55. The applicant shall submit a botanist report by a qualified and experienced individual, which
gives a detailed account of the plant species and vegetation community structure of the site in
conjunction with the operational works. The botanist report should specifically search for any
Rare or Threatened flora species. Retention of these Species is a requirement of the
development. :
56. A Vegetation Management Plan (VMP) shall be submitted for Council approval for the site that
addresses weed removal and control, rehabilitation of existing vegetation communities and
revegetation strategies for degraded areas of the site, which is to be undertaken by the
applicant. The works required in each stage by the VMP shall be completed prior to the
endorsement of the Survey Plan for that stage, with the exception of the park areas. The works
in the park areas required by the VMP shall be completed prior to commencement of Stages 3
& 4 of the development.
57. All mapped vegetation communities shall be afforded long-term protection through park
dedication and covenants as depicted on the approved plans.
58. An environmental maintenance period of 2 years shall commence after all declared and
environmental weeds have been removed from the property and Council's Vegetation
Management Officer shall sign the maintenance period on and off after successful eradication.
To this extent the Vegetation Management Officer has the discretion to pause the maintenance
period if work has not been carried out as instructed or if lengthy time delays occur.
59. — if there is any cleared vegetation it shall be suitably processed by one of the following methods
and removed from the site:
59.1. Processing through a wood-chipper or shredder. The resulting mulch-is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum
of 10 metres between edges of heaps.
59.2. Disposal for firewood.
59.3. Disposal for landscaping purposes.
59.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit far Operational Work. The Applicant is advised that
other methods may be considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
60. To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with any
Development Permit for Operational Works. Site contro] measures such as silt fencing,
controlled gravel access to the site and controlled disposal of waste, may be necessary.
Page 7 of 11 Print Date: 29 October 2018, 3:45 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
court appeal.pdfRelated documentApplication case desk ↗
About this file
- File size
- 582 KB (small file)
- File type
No other editions are linked here.