SBSMR 20004 Revision D - Response to RFI

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  

   
   
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
  
    

  
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STORMWATER 900 x 900 CONCRETE STORMWATER 900 x 900 900 x 900 CONCRETE
INSPECTION PIT OUTLET PIT HEADWALL PIT 18 PIT 1A INSPECTION PIT OUTLET PIT OUTLET PIT — HEADWALL PIT 24
5006 UPVC J DETENTION J 3008 UPVC PIPE 300¢ UPVC PIPE [2250 UPVC PIPE 5006 UPVC | DETENTION 300¢ UPVC PIPE 3008 UPVC PIPE 3000 UPVC PIPE
TANK TANK
BASIN 1 BASIN 1 BASIN 2
1600 ORIFICE 1600 ORIFICE
PLATE \ PLATE \
ee ILA =I
ro ro 4
|
DATUM RL 70.00 DATUM RL 70.00
26 = = 2 e 2 2. = = 2 2 2
3a = = = 3 = = Ba = = = 3 = =
eds s s Z g 3 s Sade s s g g g 28
saan a a “i 6 nS + San a a a 6 + ~
2a ~ ~ ~ ~ ~ ~ ~ 2a ~~ ~ ~ ~ ~ ~ ~
= 7000 18500 22100 14150 = 7000 18500 14100 16700
3 mK Ss aK
SCALE : 1 IN 250 HORIZONTALLY SCALE : 1 IN 250 HORIZONTALLY
1 IN 125 VERTICALLY 1 IN 125 VERTICALLY
900 x 900 OVERFLOW PIT ovERe.ow PI
"ABOVE-DESIGN’ FLOWS SPILL EXTENDED DETENTION
INTO FIELD ENTRY PIT. DESIGN FLOWS POND IN EXTENDED FUNCTIONAL VEGETATION SUPPORT NUTRIENT
DETENTION ZONE INCREASING REMOVAL AND MAINTAINS POROSITY OF SOIL.
FENCE. ————____—_> VOLUME OF STORMWATER THAT IS CONCRETE HEADWALL CARPARK SLAB 74.80 (VARIES)
STONE CLADDING TO CAPTURED AND TREATED. 7
BLOCK WALL WHERE EXPOSED — \ yp
— JOP OF WALL RL 74.2000 900 SERIES BLOCK WORK —— DRIVEWAY SLAB
RETAINING WALL AS PER DETAILS
NATURAL GROUND SURFACE RL 73.60 ‘| | / | / | BOD SUP PPE NE
nnn. onoa smc re 8) Ty fa WL
NET VERT RL 7320 PW Wi} _ [hy 5 =~ INLET INVERT RL_73.20_
TREATED FLOWS AND T See Se eas $ =t g
_ OUTLET PIT L726 _ OVERFLOWS TO = <7 > 7 -*Remesrie fi > 0 DR YE 7 5 TOP OF WALL RL 74.2 200 SERIES BLOCKWORK
RECEIVING WATERS. ne BASE [email protected]% TOWARDS PIT . s STONE CLADDING TO FULLY GROUTED CORES
: UNDER-DRAINS re CIEANOUT RISER R = ay cee cones BLOCK WALL WHERE EXPOSED
FLTER CLOTH UNER DRAINAGE LAYER (FINE. AGGREGATE) ease UNSLOTIED STANDPIPE FOR fle
TRANSITION LAYER (COARSE SAND) “ DRAINAGE PIPE CLEANOUT. as ; BIO RETENTION BIO RETENTION
ge NI6 @ 200 VERTICALLY FILTER MEDIA FILTER MEDIA N16 @ 200 VERTICALLY
FILTER MEDIA (SANDY LOAM) 3|S mr00 wax
ORTHOPHOSPHATE CONTENT < 60mg/kg 3ls N16 @ 400 HORIZONTALLY. —ESat_ " @ N16 @ 400 HORIZONTALLY
=[5 MINIMUM GROUND LEVEL
BIO RETENTION BASIN 1 DETAIL wane Bo ea IE |
SCALE 1:50 <4
NI6 @ 200 STARTERS i NI6 @ 200 STARTERS
600 LAP WW Vey Vy TV Vy ZI 800 LAP
900 x 900 OVERFLOW PIT PUN IONAL an —
x FUNCTIONAL VEGETATION SUPPORT NUTRIENT pee prey
"ABOVE-DESIGN’ FLOWS SPILL REMOVAL AND MAINTAINS POROSITY OF SOIL.
INTO FIELD ENTRY PIT. EXTENDED DETENTION | | | |
DESIGN FLOWS POND IN EXTENDED CONCRETE HEADWALL ©=——, STONE CLADDING T0 | |
DETENTION ZONE INCREASING BLOCK WALL WHERE EXPOSED 900 900
FENCE VOLUME OF STORMWATER THAT IS | je Loo TOP BT | fef-__ too TP a eT
CAPTURED AND TREATED. R6 LIGS @ 1000 CRS. R6 LIGS @ 1000 CRS.
WALKWAY SLAB — CARPARK SLAB 74.80 (VARIES) | | | |
200 SERIES BLOCKWORK VA ss -T [\ Be
RETAINING WALL AS PER 7 3008 SW UPVC PIPE
DETAILS |__| INLET INVERT RL 74.20 ©
LN g 450
TREATED FLOWS AND Ey a a ep oa =~s
_ OUTLET PIT IL 73.60 _ __ ovERFLOWS 10 _§ S77 ~~ TARE) Fest eed tel TEST el ee deel el deel Vel, Teele] to
RECEIVING WATERS. BASE [email protected]% TOWARDS PIT S -
oe-ans A ean a g SECTION OF WALL AT BIO BASIN BIO RETENTION BASIN RETAINING WALL DETAIL
FILTER CLOTH LINER DRAINAGE LAYER (FINE AGGREGATE) OO e ee PIPE ‘ UNSLOTTED STANDPIPE FOR
5% SLOPE. DRAINAGE PIPE CLEANOUT.
TRANSITION LAYER (COARSE SAND)
FILTER MEDIA (SANDY LOAM)
ORTHOPHOSPHATE CONTENT < 60mg/kg
SCALE 1:50
5 07221] dL APPROVED SCALE AS SHOWN | JOB DESCRIPTION DRAWING TITLE
TaN ena tan} NEIL McKENZIE & ASSOCIATES PTY. LTD. RAW a NOOSA YOUNGCARE STORMWATER DRAINAGE
3 noa2t | dl. CONSULTING ENGINEERS CHECKED NN 32 VIEWLAND DRIVE LINE 1 & LINE 2 LONG SECTION
2 ee VIE AIL RPEQ 2097, NPER 3 14/699a SANDGATE ROAD DESIGNED tN NOOSA HEADS
1 te0921 | ae CLAYFIELD, QLD 4011 APPROVED wu cE Suwa
THIS DRAWING REMAINS THE PROPERTY OF PHONE: (07) 3862 1886 AW REVISION
arson ET bw | NEIL MCRENGIE. dr agsocatES CO) Copyroht Pa yy Seon 1587 OnE ART DELUCA DEVELOPMENT & CONSTRUCTION | uwaer Q20-004-C01.1 NUMER

 

 
Log in to download the original file

SBSMR 20004 Revision D - Response to RFI.pdf · 3.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗