Original source · versioned page text
SBSMR 20004 Revision D - Response to RFI
TABLE D.15 MEDIA FILTRATION NODE ASSESSMENT CHECKLIST (REFER TO SECTION 4.8.3) MEDIA FILTRATION SYSTEM (CHECK REPORTING TABLE C15) COMMENTS/ISSUES TO FOLLOW UP Is the extended detention depth consistent with plans? ls the surface area consistent with plans? Is the exfiltration rate set to zero? If an exfiltration rate has been used, has the secondary drainage link been used to return the exfiltrated flows to the model? (Section 4.1) |s the filter area consistent with plans? \s the filter depth consistent with plans? Is the filter media particle diameter consistent with manufacturer information? Is the saturated hydraulic conductivity consistent with manufacturer information? Is the depth below underdrain consistent with plans? Have the K and C* values been retained as default values or otherwise justified? TABLE D.16 OVERALL APPROVAL ASSESSMENT CHECKLIST aad ets COMMENTS/ISSUES TO FOLLOW UP (CHECK REPORTING TABLE C16) Have all water quality objectives been met? ls the MUSIC model approved? J MUSIC MODELLING GUIDELINES Version’ 3.0 - 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.