SBSMR 20004 Revision D - Response to RFI
4.3 CONCEPT STORMWATER MANAGEMENT LAYOUT Runoff from the buildings is collected via a piped drainage system. This piped system will be connected into the new stormwater infrastructure. A detention tank will be installed to reduce peak runoff to below pre-construction runoff. The lawful point of discharge for the site has been undertaken as follows: Areas of the landscaping which are well below the ability of the stormwater infrastructure to collect will be allowed to flow as overland flow to the rear south-western corner of the property into a soakage pit. We have estimated that the area of landscaped site discharging to this location will be 450m2. An existing grated inlet exists at the lower corner of 28 Viewland Drive to pick up this flow. Most of the pre-development flow would have discharged to this point. We are, therefore, substantially reducing discharge to this location. The areas of the site which can be picked up by the development’s stormwater infrastructure will be discharged by a new piped stormwater network running down viewland drive and connected into the existing stormwater gully at the corner of Viewland Drive and The Quarterdeck. The area discharging to this gully will be 2655m2. Runoff will be limited to below pre-development flows by the installation of a detention tank with orifice plate. Neil McKenzie & Associates Drawings No. 20-004- C01 Issue 4 Stormwater Layout C01.1 Issue 5 Stormwater Long Sections C01.2 Issue 2 Stormwater Catchment Plan C02 Issue 2 Stormwater Long Sections NMA-SBSWMR-20004 Noosa Youngcare 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.