Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 4 - Layout Plans Stages 1-3 · 132005.638.06

of 3

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                     IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                                                 CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                             C                                                                                                                  AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                                   ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                                                     COMMENCEMENT OF EXCAVATION

                                                                                                                                                                                            HES B
                                                                                                                                                                                                   ASIN
                                                                                                                                       CLEANAWAY
                                                                                                                                                                                                                                                                                                                            STAGE TRAFFIC LEGEND
            STAGE 3                                                                                                                      DEPOT                                                                                                                                                                             STAGE TRAFFIC FOR GENERAL WASTE
                                                                                                                                                                                                                                                                                           FUTURE CONCRETE CRUSHING
        THE AREA BESIDE                                                                                                                                                                                                                                                                                                    STAGE TRAFFIC FOR GREEN WASTE
                                                                                                                                                                             GRAV                                                                                                          AREA WITH C&D SORTING AREA
     EUMUNDI-NOOSA ROAD                                                                                                                                                           E
                                                                            FUTURE BUILDINGS                                                                                CLEA L HARDST                                                                                                                                  STAGE TRAFFIC FOR COMMERCIAL
    IS TO BE REHABILITATED                                                                                                                                                      NAWA          AND,
                                                                                                                                                                              PARK Y VEHICL
                                                                                                                                                                                    ING A       E                                             CURRENT GREEN                                                                APPROVED TREE CLEARING AREAS
                                                                                                                                                                                          REA
                           SITE ENTRANCE                                                                                                                                                                                                       WASTE AREA

                                                                                                                                          REVIVA                                          ACCOUNT CUSTOMER
                                                                                                                                          CENTRE                                          WEIGHBRIDGE (2WB)
                                                                                                                                                                                                                                         ENTRY AND EXIT TO
                                                                                                                                                                                                                                         GRAVEL HARDSTAND
                                                                                                                                                                                                                                                                           CURRENT GREEN
                                                                                                                                                                                                                                             PARKING
                                                                                                                                                                                                                                                                            WASTE AREA

                                                                                                                                                                                                                                    UP




                                                                                        STAGE 3
                                                                                     NEW TRANSFER
                                                                                        STATION                                                                                                           COMPOST FACILITY AREA


                                                                                         STAGE 3                                                                                                                                                        LOADOUT
                                                                                     WEIGHBRIDGE WB1                                                                                                                                                    COMPOST
                                                                                      USED ONLY FOR
                                                                                                                                                                                                                                                                                                                         FUTURE
                                                                                       KERSIDE AND                                                                                                                                                                                                                      LANDFILL
                                                                                       COMPOST OUT                                                                                                                                                                                                                       CELL 3.1
                                            EUMUNDI-NOOSA ROAD




                                                                                                                                                                                                        END OF PROPOSED
                                                                                                                                                                                                          SEALED ROAD
                                                                                       FUTURE BUILDING
                                                                                                                                                         D A
                                                                                                                                                        RO
                                                                                                                                                     SS
                                                                                                                                                   CE
                                                                                                                                                   AC




                                                                                                                                                             EXISTING LEACHATE/GAS BUILDING, TANK
                                                                                                                                                           STORAGE. PROPOSED FUTURE EXTENSION TO                                                                                                                                                                                  FUTURE
                                                                                                                                                              NORTH EAST OF EXISTING STRUCTURE                                                                                                                                                                                   LANDFILL
                                                                                                                                                                                                                                                                                                                                                                                 CELL 3.2




                                                                                                                                                                                                                                                                                             EXISTING
                                                                                                                                                                                                                                                                                             LANDFILL

                                                                                                                                                                                                                                                                                                                                                      SCALE 1:1000 (A1) - 1:2000 (A3)

                                                                                                                                                                                                                                                                                                                                                Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                                Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                                Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                                Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                                the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                                services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                                contractor prior to commencement of works.

                                                                                                                                                               Approved
Checked -    CJT                                                                                                                                                                                                  Drawing title -                             Project -   DOONAN RESOURCE               Site -                                 Project No.     244035       Sheet No.               C056
Design -    CJT        Drawn -    LMc
                                                                                                                                                                                                                  LAYOUT PLAN STAGE 3                                     RECOVERY REDEVELOPMENT        561 EUMUNDI-NOOSA ROAD,                Digital Ref :   C056 LAYOUT PLAN STAGE 3   Issue :      C
                                                                                                                                                                                                                                                                                                        DOONAN
                                                                 C   21.09.2026   STAGE 3 RRA PAD AMENDED ABOVE                 LMc
Scales -    AS SHOWN                                             B   18.09.2026   STAGE 3 TRAFFIC, NOTES AND TREE CLEARING ADDED LMc                           COVEY ASSOCIATES PTY LTD
                                                                                                                                                               ABN 59 137 305 992
                                                                                                                                                                                          124 DUPORTH AVENUE
                                                                                                                                                                                          PO BOX 16
                                                                                                                                                                                                                                                              Client -
                                                                                                                                                                                                                                                                          NOOSA SHIRE COUNCIL                                                   This Document is copyright and shall not be copied
                                                                                                                                                                                                                                                                                                                                                without written approval, nor shall it be used except
                       PRELIMINARY
                                                                 A   8.09.2026    PRELIMINARY ISSUE                             LMc
Document Stage -                                                                                                                                               (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                                                 for the Development and the Site Specified.
                                                                 Issue Date                     Description                     By                             [email protected]
       C:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C056 LAYOUT PLAN STAGE 3.dwg                                                                                                                                                                                                                   Plot 21 September 2026 - 4:58 PM

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4 - Layout Plans Stages 1-3.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.