Council archive · source document
2017-07-04_Request Extension to Currency Period_FINAL · 152006.1999.2
Attached to the e-mail Request for Extension to Currency Period - 152006.1999.2 - 191 Hollett Rd, Noosaville.
Specific Outcomes Probable Solutions Comments
a) is responsive to the natural with a slope greater than 1 in 4 (25%);
topography of the site and minimises cut AND
and fill (eg. by stepping down the slope S94.2 Buildings present no more than 2
of the site or using suspended floor storeys at any one point;
construction); AND
b) does not visually dominate the hill S95.1 On properties with a slope
slope or interrupt the skyline; and exceeding 1 in 4 (25%) or located on
c) is integrated with the natural site ridgelines visible from the major road
characteristics including vegetation; network the roofline of buildings do not
AND protrude above the ridgeline or tree
O95 The landscape character and visual canopy.
amenity quality of hill slopes and Advisory Note
ridgelines are retained. On visually prominent hill slopes or
ridgelines buildings should be
predominantly finished in colours and
materials that blend well with the
colours and hues of the surrounding
vegetation and landscape without
causing glare or reflection. Shades in the
violet, blue, green and yellow green side
of the spectrum as well as greys or
browns should be appropriate with
whites or bright colours restricted to
trimmings.
Incompatible uses
O96 New dwelling units are to provide No solution provided O96 - Not Applicable.
for sufficient buffer area between the
premises and existing Industrial
business uses on other premises to
avoid any potential adverse amenity
impacts on residents.
12.40 Open space, environment and conservation
Environmental values
O97 The environmental values of land No solution provided O97 - The environmental values of
are protected from adverse impacts as a the site will be protected from
consequence of development in or adverse impacts through dedication
adjacent to that land. of 52.757 hectares to parkland.
Further vegetation outside
dedication will also be protected
through the implementation of
vegetation covenants. It is noted
that stormwater management will
require to be implemented to
ensure appropriate water quality
measures are implemented.
Open space network
O98 Land within the Rural Zone forms No solution provided O98 - Complies. The open space
part of an open space network between network within the locality will be
Lake Weyba and the Tewantin State further enhanced through significant
Forest and sub-coastal escarpment. dedication of 52.757 hectares of
parkland.
JFP Ref: M1775 REV. A Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-07-04_Request Extension to Currency Period_FINAL.pdfRelated documentApplication case desk ↗
About this file
- File size
- 880 KB (small file)
- File type
No other editions are linked here.