Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

2017-07-04_Request Extension to Currency Period_FINAL · 152006.1999.2

Attached to the e-mail Request for Extension to Currency Period - 152006.1999.2 - 191 Hollett Rd, Noosaville.

of 17

Text shows just the words. Original shows the document exactly as it was published.

  DEOs                                                              Comments
            affordable housing, that specifically caters for the            to meet the expectations of Noosa Shire’s
            current and projected demographic, economic and                 population to have access to a broad range of safe,
            social profile of the community;                                secure and affordable housing, that specifically
       iii) the expected character and amenity for the                      caters for the current and projected demographic,
            particular locality;                                            economic and social profile of the community;
       iv) the landform, natural environmental and climatic            iii) is compatible with the character and amenity for
            conditions of the locality;                                     the particular locality;
       v) energy efficiency and water conserving design                iv) has been designed around existing landform,
            principles;                                                     natural environmental and climatic conditions of
       vi) convenience and accessibility to urban services                  the locality;
            employment and infrastructure; and                         v) will ensure any subsequent dwelling house on each
       vii) suitable separation from incompatible land uses.                allotment will be designed to meet relevant energy
                                                                            efficiency and water conserving design principles;
                                                                       vi) is conveniently located with access to urban
                                                                            services employment and infrastructure; and
                                                                       vii) is consistent with adjoining and surrounding land
                                                                            uses.
  l) INFRASTRUCTURE AND SERVICES
       i) The efficient provision and use of services such as       l) (i) – (iii) Complies. All relevant infrastructure and services
            water, sewerage, power, telecommunications and          for the rural residential development will be provided to a
            waste disposal caters for the needs of residents        suitable standard to meet the needs of the proposed land
            and visitors, relative to their location within Noosa   use. These have been appropriately conditioned on the
            Shire.                                                  existing development approval.
       ii) The ongoing viability of existing infrastructure
            services and facilities are protected from the          Reference is made to the specific Civil Engineering
            impacts of future development.                          conditions of approval 18 to 37.
       iii) Existing and future bulk water infrastructure and
            corridors are protected from development that
            would compromise the corridor integrity, and the
            efficient delivery and functioning of the
            infrastructure. Bulk water supply infrastructure is
            protected from encroachment from sensitive uses.

DIVISION 15 OVERALL OUTCOMES FOR TEWANTIN AND DOONAN LOCALITY
 Overall Outcomes                                             Comments
 12.7.1 The overall outcomes are the purpose of the Tewantin & Doonan Locality Code.
 12.7.2 The overall outcomes sought for the Tewantin & Doonan Locality are the following—
 a) New uses and works are located, designed and managed      a) Complies. The development has been located, designed
 to—                                                          and managed:-
         i)   be compatible with other uses and works;            i)       To be compatible with other uses and works
         ii) maintain the safety of people and works;                      through appropriate design layout including
         iii) avoid significant adverse impacts on the                     road network design compatible with adjacent
              amenity enjoyed by users of other premises                   and surrounding uses;
              including acoustic and visual qualities; and        ii)      To appropriately cater for the safety of people
         iv) avoid significant adverse effects on the natural              and works and is consistent with current
              environment, including native habitat removal,               standards including bushfire management (refer
              fragmentation and attrition;                                 conditions 57 to 62), flooding requirements
                                                                           (refer conditions 68 to 73);
                                                                  iii)     To ensure no adverse impacts on amenity of
                                                                           adjoining or surrounding premises as vegetation
                                                                           buffers will be retained which will maintain
                                                                           visual qualities. It is noted that proposed
                                                                           allotments adjoining Walter Hay Drive will be
                                                                           provided with acoustic attenuation through
                                                                           mounding and landscaping treatments.




JFP Ref: M1775 REV. A                                                                                                           Page 6

Used in these records

About this file

File size
880 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-07-04_Request Extension to Currency Period_FINAL.pdf · 880 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.