Council archive · source document
2017-07-04_Request Extension to Currency Period_FINAL · 152006.1999.2
Attached to the e-mail Request for Extension to Currency Period - 152006.1999.2 - 191 Hollett Rd, Noosaville.
DEOs Comments
affordable housing, that specifically caters for the to meet the expectations of Noosa Shire’s
current and projected demographic, economic and population to have access to a broad range of safe,
social profile of the community; secure and affordable housing, that specifically
iii) the expected character and amenity for the caters for the current and projected demographic,
particular locality; economic and social profile of the community;
iv) the landform, natural environmental and climatic iii) is compatible with the character and amenity for
conditions of the locality; the particular locality;
v) energy efficiency and water conserving design iv) has been designed around existing landform,
principles; natural environmental and climatic conditions of
vi) convenience and accessibility to urban services the locality;
employment and infrastructure; and v) will ensure any subsequent dwelling house on each
vii) suitable separation from incompatible land uses. allotment will be designed to meet relevant energy
efficiency and water conserving design principles;
vi) is conveniently located with access to urban
services employment and infrastructure; and
vii) is consistent with adjoining and surrounding land
uses.
l) INFRASTRUCTURE AND SERVICES
i) The efficient provision and use of services such as l) (i) – (iii) Complies. All relevant infrastructure and services
water, sewerage, power, telecommunications and for the rural residential development will be provided to a
waste disposal caters for the needs of residents suitable standard to meet the needs of the proposed land
and visitors, relative to their location within Noosa use. These have been appropriately conditioned on the
Shire. existing development approval.
ii) The ongoing viability of existing infrastructure
services and facilities are protected from the Reference is made to the specific Civil Engineering
impacts of future development. conditions of approval 18 to 37.
iii) Existing and future bulk water infrastructure and
corridors are protected from development that
would compromise the corridor integrity, and the
efficient delivery and functioning of the
infrastructure. Bulk water supply infrastructure is
protected from encroachment from sensitive uses.
DIVISION 15 OVERALL OUTCOMES FOR TEWANTIN AND DOONAN LOCALITY
Overall Outcomes Comments
12.7.1 The overall outcomes are the purpose of the Tewantin & Doonan Locality Code.
12.7.2 The overall outcomes sought for the Tewantin & Doonan Locality are the following—
a) New uses and works are located, designed and managed a) Complies. The development has been located, designed
to— and managed:-
i) be compatible with other uses and works; i) To be compatible with other uses and works
ii) maintain the safety of people and works; through appropriate design layout including
iii) avoid significant adverse impacts on the road network design compatible with adjacent
amenity enjoyed by users of other premises and surrounding uses;
including acoustic and visual qualities; and ii) To appropriately cater for the safety of people
iv) avoid significant adverse effects on the natural and works and is consistent with current
environment, including native habitat removal, standards including bushfire management (refer
fragmentation and attrition; conditions 57 to 62), flooding requirements
(refer conditions 68 to 73);
iii) To ensure no adverse impacts on amenity of
adjoining or surrounding premises as vegetation
buffers will be retained which will maintain
visual qualities. It is noted that proposed
allotments adjoining Walter Hay Drive will be
provided with acoustic attenuation through
mounding and landscaping treatments.
JFP Ref: M1775 REV. A Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-07-04_Request Extension to Currency Period_FINAL.pdfRelated documentApplication case desk ↗
About this file
- File size
- 880 KB (small file)
- File type
No other editions are linked here.