Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Attachment C - Copy of 2019 Approval - Decision Notice · MCU19/0049.01

of 15

Text shows just the words. Original shows the document exactly as it was published.

      Dedication
7.    Prior to the issue of any Development Permit for Operational Works or the sealing of any
      survey plan associated with the development approval, whichever occurs sooner, a two (2.0)
      metre wide strip extending across the full length of the frontage to Hospital Lane is to be
      dedicated to Council as ‘Road’.
8.    Any proposed window hoods/eaves must not encroach more than 600mm onto dedicated
      land.
      Performance Bond
9.    Security in the form of a cash bond or trading bank guarantee to the sum of $25,000 must
      be submitted to Council, to secure performance of all conditions of this approval, prior to the
      issue of a Development Permit for Operational Works. The cash bond or trading bank
      guarantee will be returned on performance of the conditions of approval less any costs
      incurred by Council in respect of enforcing performance of this permit. Council reserves the
      right to call upon the bond or guaranteed sum to effect compliance with conditions.
      Safety and Security
10.   All pathways must have grades not exceeding 1 in 20, with paths having hard, slip resistant
      surfaces.
11.   The building entrance and reception area must be clearly visible and identifiable from the
      street. Alternatively, signage and lighting must be provided at strategic locations to direct
      people to the building entrance.
      Building Appearance
12.   All mechanical equipment and other service infrastructure located on the site must be:
      a.    located not less than 2 metres from a property boundary;
      b.    fully enclosed or screened such that they are not visible from the street frontages nor
            adjoining properties. Where screened by landscaping, landscaping beds must be at
            least 1.5 metres wide.
13.   No part of the site may be used for outdoor storage of materials unless specified on the
      Approved Plans or the conditions of this Decision Notice. Materials stored outside of the
      building must not exceed 4 metres in height or half the height of the building, whichever is
      the greater.
14.   Roof materials must be non-reflective and designed with colours and styles to minimise the
      visual impact of the development in accordance with the Materials Board plan dated
      19.09.2019.
15.   Weather boarding shown as ‘white’ on Plan no. DA060, Material Board, (as annotated by
      Council) must be a muted tone or off white colour so as to blend with the colour palette so
      as to soften the appearance of the building.
16.   Undercroft skirting or screening (eg. timber battens) must be provided to the full height of
      any undercroft areas at the north western car park.
      Protection of Privacy
17.   To ensure privacy is protected to adjoining properties, all windows and glass doors located
      on the upper level of the northern and southern building face must either:
            have a minimum window sill height or 1.5 metres above floor level
            be fitted with translucent glazing
            be fitted with a fixed external screen




                                                                                       Page 3 of 15

Used in these records

About this file

File size
451 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment C - Copy of 2019 Approval - Decision Notice.pdf · 451 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.