Negotiated Decision Notice - 010.2008.00000749.001 [As Published] · 142008.749

of 6

Text shows just the words. Original shows the document exactly as it was published.

                                                                                        2008/749




3     RELEVANT PERIOD OF APPROVAL
This Development Permit lapses if the development has not happened by 30 January 2011 unless
application to extend the relevant period is approved by Council.

4     ASSESSMENT MANAGER CONDITIONS

1.    The development shall be carried out in accordance with the approved plans listed below or as
      modified herein.
2.    Rock scour protection shall be placed across the spillways and the outlet paths for each dam.
      The rock scour protection shall extend downslope from the toe of the batter and be of sufficient
      size to eliminate scouring of the dam wall and to reduce the velocity of the outlet waters prior to
      entering the existing waterways.
3.    All disturbed and exposed areas of proposed dams 1 & 2 shall be suitably stabilised by the
      planting of local native species, turfing or grass seeding.
4.    All disturbed areas of the dam 3 are to be suitably stabilised by the planting of local native
      species, at separation distances of 5m between stems, within 20m of the full ponded level of the
      southern dam on the lot, excluding 3m wide access tracks and dam walls. The plantings are not
      to affect the structural integrity of the dam.
5.    Within the designated planting area of proposed dam 3 , the area is to be kept free of
      undesirable species (as per the Noosa Plan Planning Scheme Policy 3 - Landscaping Plants
      and Guidelines) for a period of no less than a year from the date of the operational works permit
      approval.
      All plantings are to be kept free of grass species within a 200mm radius of each stem.
6.    Sediment and erosion control measures shall be placed and maintained on site in accordance
      with current best practice guidelines (the Manual for Erosion and Sediment Control version 1.2
      prepared by Sunshine Coast Regional Council). The measures shall be maintained on site until
      the area has been suitably stabilised by the establishment of local native species, turfing or
      grass seeding
7.    Deleted.
8.    The dams, spillways and downstream drainage paths shall be suitably maintained to ensure the
      structural stability of the dams and to prevent erosion of the spillways and the outlet drainage
      paths.
9.    The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure that
      any sub contractors also have the appropriate insurance and public liability documentation.
10.   Council standards shall apply to these works unless otherwise modified herein.
11.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply, sewerage,
      footpaths, kerbing, landscaping, street furniture etc.) are protected against any damage or
      interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its Consultants
      or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out
      the engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager-
      Land Development and shall forthwith rectify the damage to that property or facility at its cost
      and to the satisfaction of the Manager-Land Development, prior to the release of any bonds or,
      alternatively, the Applicant may request the Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to the Council prior to the release of any
      bonds, provided that in the case of emergency the Council shall be entitled to rectify such
      damage at the cost of the Applicant, such cost being paid prior to the release of any bonds.

                                                                                           2 of 6

Used in these records

About this file

File size
54 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice - 010.2008.00000749.001 [As Published].pdf · 54 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.