2015-02-09 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
General Committee
Meeting
Monday, 9 February 2015
commencing at 10am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Tony Wellington (Chair), Bob Abbot, Sandy Bolton,
Joe Jurisevic, Frank Pardon, Noel Playford, Frank Wilkie
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 11 sections
Section 2
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
PRESENTATIONS -
Nil.
ITEMS REFERRED FROM INFRASTRUCTURE & SERVICES COMMITTEE -
Nil.
ITEMS REFERRED FROM PLANNING & ORGANISATION COMMITTEE -
3 NOOSAVILLE NIGHT MARKET TRIAL
(Previously distributed in Planning & Organisation Committee Agenda, Page 10)
Reason for referral: Significance of issue
7 PROPOSAL TO ADOPT MODEL LOCAL LAWS AND PROPOSAL TO MAKE
SUBORDINATE LOCAL LAWS
(Previously distributed in Planning & Organisation Committee Agenda, Page 81)
Reason for referral: Significance of issue
8 SUNDALE GARDEN VILLAGE
– PLANNING & ENVIRONMENT COURT APPEAL NO. D215/2012
(Previously distributed in Planning & Organisation Committee Agenda, Page 92)
Reason for referral: Significance of issue
REPORTS DIRECT TO GENERAL COMMITTEE 3
1 FINANCIAL PERFORMANCE REPORT - JANUARY 2015 3
CLOSED SESSION 12
2 KIN KIN QUARRY - PROPOSED
BEACH ACTION TC 1899 12
Page 2 of 20
Section 3
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
REPORTS DIRECT TO GENERAL COMMITTEE
1 FINANCIAL PERFORMANCE REPORT - JANUARY 2015
Author Director Corporate Services, Michael Shave
Corporate Services Department
Index ECM / Subject / 22.09 – Monthly Exception Report
Attachments 1. Statement of Comprehensive Income
2. Capital Works Schedule
EXECUTIVE SUMMARY
Overall financial performance for the 6 months to 31 December 2014 shows a favourable year-to-
date variance against budget, and the actual results will form the basis of a thorough review of the
budget forecast through until 30 June 2015.
Summary YTD Financial Performance
Current
Budget Actual Variance
YTD YTD YTD
$ $ %
Operating Revenue 74,682,106 74,625,029 0.1%
Operating 47,767,265 45,125,279 5.5%
Expenditure
Operating Result 26,914,841 29,499,750 9.6%
Capital Revenue 2,402,153 2,577,081 7.3%
Net Result 29,316,994 32,076,831 9.4%
Capital Works Program
YTD Actual $5,167,854
YTD Actual
Expenditure Expenditure
Remaining Capital $19,727,239 20.76%
Expenditure
Full Year $24,895,093
Budgeted
Remaining
Expenditure Capital
Expenditure
79.24%
RECOMMENDATION
That Council note the report by the Director Corporate Services to the General Committee Meeting
dated 9 February 2015 providing the January 2015 monthly financial performance report.
Page 3 of 20
Section 4
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
REPORT
1. Operating Position
The year to date actual operating position is favourable compared to the YTD budget forecast. The
operating surplus for the 7 months to date is $29.5m compared to a forecast of $26.9m, as depicted
in the graph below where the actual position (red line) has remained above the budget position
(blue line).
The significant YTD surplus is as expected given the issuing of the January rate levy and
recognition of the associated revenue during the January period. The accumulated operating
position (i.e. the blue line in the graph) is still forecast to result in an approximate breakeven
operating position for the 2014/15 financial year, however the December quarter budget review
adjustments are yet to be finalised and will be brought before Council for consideration in March.
30,000 35,000
25,000 30,000
25,000
20,000
20,000
15,000
15,000
$,000
10,000
10,000
5,000
5,000
0
0
-5,000 -5,000
-10,000 -10,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Budget Actual Accum Budget (RHS) Accum Actual (RHS)
2. Operating Revenue
Overall operating revenue is in accordance with YTD budget forecasts, however with some cross
subsidy occurring between the various revenue categories. Detailed commentary for significant
items appears below:
40,000 120,000
35,000 100,000
30,000
80,000
25,000
60,000
$,000
20,000
40,000
15,000
20,000
10,000
5,000 0
0 -20,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Budget Actual Accum Budget (RHS) Accum Actual (RHS)
Note: Includes internal revenue which nets off to expenditure
Page 4 of 20
Section 5
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
Rates and Charges – Current YTD revenue has achieved 99% of the full year budget
forecast, following the second rate run in January. The December quarter budget review will
include an adjustment for prepaid rates (to reflect revised accounting treatment requested by
the audit office), which was included as a revenue item in the original budget.
Fees and Charges – Fees and charges earned totals 69.5% of the full year budget (compared
to the YTD benchmark 58.3%). Development related activity, parking infringements, holiday
park fees and search fees remain ahead of forecasts, although general waste disposal fees
remain below forecast. All areas will be subject to review and possible adjustments to
budgets in the next budget review.
Interest Received – remains ahead of forecasts due to higher levels of cash available for
investment (adjustment to be included as part of the December quarter budget review).
Grants and Subsidies – will continue to be monitored with adjustments to be made as part of
the December quarter budget review.
Other Revenue – generally in accordance with budget predictions, with sale of waste
recyclables continuing to show a favourable variance.
3. Operating Expenses
YTD operating expenditure is currently 52.4% of full year budget spend compared to the YTD
benchmark of 58.3%, a positive variance of $2.6 million. Detailed commentary for significant items
appears below:
14,000 120,000
12,000 100,000
10,000 80,000
8,000 60,000
$,000
6,000 40,000
4,000 20,000
2,000 0
0 -20,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Budget Actual Accum Budget (RHS) Accum Actual (RHS)
Note: Includes internal expenditure which nets off to revenue
Employee Costs – YTD actuals are below budgeted figures, with variances to be considered
with the December quarter budget review.
Materials and Services – contract services expenditure is below budgeted levels, and will
continue to be monitored against service delivery outcomes for possible review if required.
Finance Costs – generally in accordance with budget, although the actual interest rate on
2013/14 borrowings was less than originally forecast and adjustments will be included in the
December quarter budget review.
Depreciation expenses are currently running in accordance with the budget forecast,
however, with revaluation impacts of road and bridge assets (undertaken in 2013/14) there
will now be adjustments included in the December quarter budget review.
Other Expenses – generally in accordance with budget.
Page 5 of 20
Section 6
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
4. Capital Works Program
Year to date capital expenditure is $5.2 million against a YTD budget of $8 million. This equates to
approximately 21% completion of the current program.
10,000,000 30,000,000
8,000,000
25,000,000
6,000,000
20,000,000
4,000,000
2,000,000 15,000,000
0
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 10,000,000
-2,000,000
5,000,000
-4,000,000
-6,000,000 0
Budget Actual Accum Budget (RHS) Accum Actual (RHS)
Works have commenced internally to expedite the delivery of the capital works program for the
remainder of the year, including the streamlining of procurement processes including greater
collaboration with Localbuy. A review of the ability to deliver the current capital works program has
been undertaken, with adjustments to be made to the program as part of the December quarter
budget review.
Detailed discussion of progress in the delivery of the capital works program is provided periodically
to the Infrastructure and Services Committee. The attached schedule of capital works shows the
specific financial performance for each program.
5. Cash Management and Investment Performance
Council funds are invested in accordance with the adopted Investment Policy. Total cash on hand
as at 31 January 2015 was $50.4 million, with the portfolio split across 5 institutions. Actual interest
revenue for the month was $153,239, with YTD interest revenue on cash balances at $1.3 million.
The graph on the right shows the current risk profile using industry credit ratings.
BENDIGO CBA A1 4%
SUNCORP 4% 14% A2 4%
4%
NAB
16%
A1+
(Other)
30% A1+ (QTC)
62%
QTC
62%
The current investment portfolio mix complies with Council’s investment policy parameters.
Page 6 of 20
Section 7
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
Previous Council Consideration
Nil.
Finance & Risk
Ongoing review of all areas of Council’s budget occurs on a monthly basis to ensure that overall
financial sustainability targets are not compromised.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Departments/Sections Consulted:
x Community Services x Planning & Infrastructure
Disaster Management & Public Order Building & Plumbing Services
Waste & Environmental Health DA Planning
Community Facilities Strategic Land Use Planning
Cultural Facilities Asset Design & Investigations
Asset Planning
Civil Operations
Environment
x Executive Office x Corporate Services
Community Engagement Finance
Customer Service ICT
Executive Support Procurement & Fleet
Governance Property & Facilities
Human Resources Revenue Services
Page 7 of 20
Section 8
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
ATTACHMENT 1
Page 8 of 20
ATTACHMENT 1
Noosa Council
Statement of Comprehensive Income
For the Year Ended 30 June 2015
As at 31-Jan-2015
Budget Budget Actual Percentage
2015 YTD YTD Annual Budget
$ $ $ %
Revenue
Recurrent Revenue
Rates, levies and charges 60,515,037 61,145,037 59,915,184 99%
Fees and charges 9,525,517 5,859,280 6,616,735 69%
Dividend income 2,065,092 - - 0%
Interest received 4,467,000 2,364,167 2,614,580 59%
Tax equivalents 775,526 281,831 181,813 23%
Other income 3,138,151 1,849,170 2,054,945 65%
Grants, subsidies, contributions and donations 5,484 054 3,182,622 3,241,771 59%
85,970,377 74,682,106 74,625,029 87%
Expenses
Recurrent Expenses
Employee benefits 27,908,265 15,920,843 15,008,085 54%
Materials and services 38,033 683 19,989 345 18,349,535 48%
Finance costs 2,524,711 1,574,314 1,476,781 58%
Depreciation and amortisation 17,526,115 10,223,567 10,223,567 58%
Other expenses 84,000 59,196 67,312 80%
86,076,775 47,767,265 45,125,279 52%
Operating Result (106,398) 26,914,841 29,499,750
Capital Revenue
Capital contributions and donations 1,843,100 1,075,142 1,289,104 70%
Grants, subsidies, contributions and donations 2,810,000 1,133,928 1,187,178 42%
Other capital revenue 427,000 193,083 100,799 24%
Capital Expenses
Capital Expenses - - -
Net Result 4,973,702 29,316,994 32,076,831
Other Comprehensive Income
Increase / (decrease) in asset revaluation surplus - - -
Other Comprehensive Income - - -
Total Other Comprehensive Income - - -
Total Comprehensive Income 4,973,702 29,316,994 32,076,831
Page 8 of 20Section 9
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
ATTACHMENT 2
Page 9 of 20
Noosa Council ATTACHMENT 2
Capital Works Schedule
As at: 31-Jan-2015
Capital Acq Commercial Properties Oo 0 201 0.00%
Total oO 0 201 0.00%
Forward design for bridge rehab program 0 10,500 10,500 100.00%
Noosa Parade Munna Point Bridge - Investigations and interim 0 185,100 6,913 3.73%
Whole of Shire - annual bridge inspect 20,000 20,000 17,344 86.72%
Noosaville - Munna Point Bridge Stage 2 1,401,000 1,401,000 7,059 0.50%
Total Bridges 1,421,000 1,616,600 41,815 2.59%
David Low Way, Beach Access 49 refurbishment 0 0 400 0.00%
Gympie Terrace and William Street Revetment wall and pathway 0 37,100 15,658 42.20%
Munna Point Holiday Park Bank Protection - Design 0 0 885 0.00%
Noosa Dog Beach SEMP Coastal monitoring 0 0 0 0.00%
Noosa Waters revetment walls - Stage 2a 0 47,000 46,910 99.81%
Noosaville - Gympie Tce / Williams St 40,000 60,000 14,252 23.75%
Sunshine Beach - beach access 35 65,000 65,000 36,249 55.77%
Teewah Beach - southern dunal restore 20,000 20,000 15,001 75.01%
Noosaville - Gympie Tce Foreshore 80,000 80,000 138 0.17%
Noosa Main Beach - Sand pumping pipe 50,000 50,000 590 1.18%
Noosa Waters - scour protection stage 2b 1,250,000 1,400,000 1,131,253 80.80%
Munna Point Foreshore Stabilisation 0 60,000 16,893 28.15%
Total Coastal Canals and Waterways 1,505,000 1,819,100 1,278,227 70.27%
Pomona Cemetery - niche wall 7,500 7,500 3,936 52.48%
Tewantin Cemetery - concrete beam 5,500 5,500 3,290 59.82%
Total Cemeteries 13,000 13,000 7,226 55.59%
Peregian Beach Land Acquistion 0 750,000 789,738 105.30%
Rufous St Precinct Redevelopment 0 0 211 0.00%
Total Commerical Land and & Property 0 750,000 791,849 105.58%
Peregian Surf Club Public Amenities - Planning & Design 0 14,800 0 0.00%
Noosa Leisure Centre — design and detail 10,000 10,000 3,766 37.66%
Kookaburra Park Public Amenities 55,000 55,000 945 1.72%
Mill Place Boiler House - stage 2 100,000 100,000 2,520 2.52%
Noosa Aquatic Centre - pool cleaner 20,000 13,352 13,352 100.00%
Noosa Leisure Centre - concertina door 25,000 25,000 0 0.00%
Noosa Library and NLC Plumbing 40,000 40,000 0 0.00%
Sunshine Beach Skate Park - block wall 22,500 22,500 27,533 122.37%
Whole of Shire - community light poles 155,000 155,000 0 0.00%
Whole of Shire- public toilet / sewerage 35,000 0 0 0.00%
Cooroy Butter Factory - condition assess 5,000 5,000 0 0.00%
Noosa Leisure Centre -upstairs flooring 60,000 60,000 0 0.00%
Noosa Regional Gallery - access 45,000 45,000 7,960 17.69%
Noosa Respite Centre - internal refurb 150,000 150,000 6,986 466%
Noosa Heads - lifeguard storage survey 75,000 75,000 0 0.00%
Tait Duke House - relocation 80,000 80,000 6,444 8.06%
Noosa Aquatic Centre 50m Pool Blanket Winch 0 7,710 9,457 122.66%
Cooroy Library Tactile Marker Placement 0 9,339 O 0.00%
Tewantin Spray Park Shade Sail 0 0 1,443 0.00%
Total Community Facilities 877,500 867,700 80,406 9.27%
Tewantin Admin Building - Chambers Fitout 0 0 687 0.00%
Tewantin Council Office - roof rehab 30,000 30,000 Oo 0.00%
Noosaville Depot - replace generator 60,000 60,000 0 0.00%
Total Corporate Buildings 90,000 90,000 687 0.76%
Purchase of Biodiversity Land 0 0 145 0.00%
Cudgerie - Cedar Gully Pk water feature 22,000 22,000 49,332 224.24%
Noosa Trail Network 4 - bridge refurbish 40,000 40,000 Oo 0.00%
Page 9 of 20Section 10
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
Page 10 of 20
Noosa Trail Network 4 - Ringtail Creek 7,000 7,000 697 9.96%
Weyba Creek - bank erosion restoration 220,000 20,000 2,542 12.71%
Total Environmental Assets, Bushland, Tracks and Trails 289,000 89,000 52,716 59.23%
Fleet - Plant Replacement
Whole of Shire - replace council fleet 1,735,000 1,735,000 402,623 23.21%
Total Fleet - Plant Replacement 1,735,000 1,735,000 402,623 23.21%
Gravel Road Network
Whole of Shire - gravel resheeting 410,000 410,000 186,981 45.61%
Total Gravel Road Network 410,000 410,000 186,981 45.61%
Holiday Parks
Capital Acq Boreen Point Holiday Park 0 0 115 0.00%
Noosa Nth Shore Holiday Park - Upgrade Septic treatment 0 11,700 8,764 74.90%
Boreen Point Campground - wastewater 60,000 60,000 64,788 107.98%
Noosa River Holiday Pk- Internal refurb 75,000 75,000 467 0.62%
Boreen Point Tennis Courts Renewal Stage | 0 30,000 21,379 71.26%
Cooroy RV Stopover 0 0 419 0.00%
Total Holiday Parks 135,000 176,700 95,932 54.29%
Information Technology
IT Major Projects 0 128,100 97,258 75.92%
Whole of Shire - Tech One HR module 167,500 132,500 33,440 25.24%
Whole of Shire - Mobile Mapping 220,000 220,000 194,478 88.40%
Whole of Shire - corporate website 125,000 125,000 12,239 9.79%
Whole of Shire - replace failed UPS 12,600 12,600 754 5.99%
Civil Engineering Design Software 0 15,019 15,019 100.00%
Total Information Technology 525,100 633,219 353,189 55.78%
Parks & Playgrounds
Gympie Terrace Park Furniture Renewal program 0 0 133 0.00%
Noosa Lions Pk- Rehab Shower Facilities 0 0 0 0.00%
Noosa Botanical Gardens- Pathway renewal 10,000 10,000 1,867 18.67%
Noosaville - Munna Pk basket ball court 6,000 0 0 0.00%
Noosaville -Gympie Tce Foreshore BBQs 55,000 43,942 46,509 105.84%
Noosaville Lions Park- Pirate Playground 100,000 160,000 3,101 1.94%
Peregian Beach - Victory Park table 3,000 3,000 2,967 98.89%
Peregian Beach Pk - 3 phase switchboard 12,000 12,000 12,433 103.61%
Tewantin - Martin Park skate facility 60,000 60,000 67,417 112.36%
Whole of Shire - BBQ renewal 18,000 18,000 14,781 82.11%
Whole of Shire - park shelters 40,000 40,000 40,599 101.50%
Whole of Shire - playground renewal prog 20,000 30,000 5,570 18.57%
Whole of Shire - playground softfall 10,000 20,000 0 0.00%
Botanical Gardens Park Furniture Renewal 0 24,500 0 0.00%
Total Parks & Playgrounds 334,000 421,442 195,378 46.36%
Pathways & Enabling Facilities
Pomona State School Station Street Pathway improvements 0 0 1,696 0.00%
Weyba Creek Boarwalk Rehab Stage 1 0 19,600 0 0.00%
Gibson Road (Eumindi Noosa Rd to Thomas St) - On road cycle 0 430,800 25,333 5.88%
Sunshine Beach State School Safety Improvements2 0 20,700 19,387 93.66%
Tewantin - pathway upgrade and lighting 270,000 270,000 5,494 2.03%
Noosa Heads - Park Road boardwalk design 200,000 200,000 1,650 0.83%
Noosa Heads - Main Beach boardwalk 500,000 0 0 0.00%
Noosa Heads - Park Rd boardwalk stage 3a 850,000 0 5,421 0.00%
Eenie Creek Pathway Stage 1 Signage 0 40,000 336 0.84%
Wallace Park Shared Path Construction 0 400,000 12,165 3.04%
Cooroy Noosa Road Corridor Improvement 0 230,000 12,400 5.39%
Total Pathways & Enabling Facilities 1,820,000 1,611,100 83,883 5.21%
Planning Scheme
Noosa Design Manual 115,000 115,000 0 0.00%
Standards Review - Standard Drawings 50,000 25,000 0 0.00%
Whole of Shire Traffic Study 100,000 100,000 663 0.66%
Noosa River Flood Mitigation Strategy 0 50,000 0 0.00%
Noosa River Hydraulic Model 0 300,000 0 0.00%
Total Planning Scheme 265,000 590,000 663 0.11%
Public Transport Infrastructure
Bus Shelter, Sunshine Beach Rd, Noosa Junction 0 0 15 0.00%
Electric Bus Feasibility Study 100,000 100,000 75,662 75.66%
Noosa Heads - Noosa Parade Stop 114 50,000 50,000 1,383 2.77%
Noosa Heads - Noosa Parade Stop 26 40,000 40,000 2,814 7.04%
Noosa Heads - Noosa Parade Stop 27 40,000 40,000 2,814 7.04%
Page 10 of 20Section 11
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
Page 11 of 20
Noosa Heads - Noosa Parade Stop 28 65,000 65,000 320 0.49%
Noosa Junction Transit Centre - improve 40,000 40,000 0 0.00%
Peregian Beach - David Low Way Stop 87 125,000 125,000 3,036 243%
Sunrise Beach - Wollomia Way Stop 11 40,000 40,000 1,171 2.93%
Whole of Shire - bus shelter DDA 20,000 20,000 18,706 93.53%
Noosa Bus Station Safer Streets Program 175,500 117,900 2,067 1.75%
Noosa Heads - Noosa Parade Translink 700596 0 40,000 480 1.20%
Noosa Heads - Noosa Parade Translink 700584 0 50,000 932 186%
Tewantin - Butler St Translink 700490 0 50,000 1,957 3.91%
Tewantin - Butler St Translink 700491 0 35,000 2,054 5.87%
Noosaville - Weyba Rd Translink 700585 0 40,000 812 2.03%
Noosaville - Weyba Rd Translink 700521 0 65,000 273 0.42%
Noosaville - Weyba Rd Translink 700522 0 40,000 1,111 2.78%
Noosaville - Weyba Rd Translink 700456 0 50,000 1,710 3.42%
Noosaville - Weyba Rd Translink 700523 0 40,000 1,824 456%
New Noosa Bus Shelters - Design 0 50,000 17,564 35.13%
Total Public Transport Infrastructure 695,500 1,097,900 136,764 12.46%
Sealed Roads Network
Annual Sealed Road Renewal & Rehabilitation Program 0 0 23,658 0.00%
Sealed Road Pavement surveys and Investigations 0 51,600 567 1.10%
Whole of Shire - pavement surveys 60,000 60,000 0 0.00%
Whole of Shire - reseal and rehab 5,000,000 5,553,610 1,004,877 18.09%
Noosa Heads - Noosa Parade Master Plan 100,000 100,000 0 0.00%
Noosaville - Eumundi Noosa Road corridor 20,000 79,085 0 0.00%
Emergent all infrastructure renewal 2,951,898 2,545,350 11,640 0.46%
Total Sealed Roads Network 8,131,898 8,389,645 1,040,742 12.41%
Sports Ground and Facilities
Girraween Sports Ground irrigation 28,000 14,000 16,884 120.60%
Girraween Sports Complex Lighting 0 10,000 0 0.00%
Total Sports Ground and Facilities 28,000 24,000 16,884 70.35%
Stormwater Drainage
Daintree Estate - Flood Mitagation Planning and Design 0 0 4,423 0.00%
Gympie Terrace Pipe Rehabilitation - Investigation & Design 0 11,300 0 0.00%
Rifle Street Pomona - Flood Mitigation Planning and Design 0 0 0 0.00%
Seaview Ck - open drain civil works 0 44,700 43,011 96.22%
Gympie Terrace pipe rehabilitation 200,000 200,000 0 0.00%
Re-lining of Ben Lexcen stormwater 50,000 50,000 202 0.40%
Whole of Shire - stormwater CCTV 10,000 10,000 739 7.39%
Whole of Shire - stormwater structures 150,000 150,000 0 0.00%
Whole of Shire - Flood mitigation stage 2,802,970 2,802,970 245,617 8.76%
Total Stormwater Drainage 3,212,970 3,268,970 293,993 8.99%
Streetscapes and Road Corridors
Forward Planning for Streetscape and Road Corridor improveme 0 1,715 4,959 289.17%
Peregian Beach - precinct planning 50,000 50,000 0 0.00%
Total Streetscapes and Road Corridors 50,000 51,715 4,959 9.59%
Transport and Infrastructure Management
Eenie Creek Road / Langura Street Intersection safety upgrad 0 16,503 16,503 100.00%
Eenie Creek Road / Walter Hay Drive Intersection safety upgr 0 109,100 21,210 19.44%
Weyba Road Reef Street Intersection Improvements - PIP 0 118,500 3,152 2.66%
Noosa Junction Disabled Parking CBA Frontage 0 20,000 6,426 32.13%
Whole of Shire - On Road Cycle Network 125,000 0 0 0.00%
Sunrise Beach - Ben Lexcen Dr school 70,000 80,000 10,888 13.61%
Whole of Shire - Road Directional Signs 40,000 40,000 0 0.00%
Cooroy Noosa Road - Beckmans Rd Intersec 110,000 110,000 25,071 22.79%
Total Transport and Infrastructure Management 345,000 494,103 83,250 16.85%
Waste Management
Noosaville Landfill - bio basin 446,900 446,900 9,012 2.02%
Noosaville Landfill - sediment control 297,000 297,000 8,107 2.73%
Noosaville Landfill - stormwater 50,000 0 2,367 0.00%
Total Waste Management 793,900 743,900 19,486 2.62%
Grand Total 22,676,868 24,893,093 5,167,854 20.76%
Page 11 of 20Section 12
GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
CLOSED SESSION
2 KIN KIN QUARRY - PROPOSED
BEACH ACTION TC 1899
DOCUMENT IN FOR MATI ON
Author Manager, Planning & Environment
Planning & Infrastructure Department
Index ECM/ Application/ TPC 1899
REASON FOR CLOSED SESSION
This report was considered in closed session in accordance with Section 275 (1) of the Local Government
Regulation 2012, which permits the meeting to be closed to the public for business relating to the
following:
(f) starting or defending legal proceedings involving it
Page 12 of 20