GENERAL COMMITTEE MEETING AGENDA 9 FEBRUARY 2015
Page 11 of 20
Noosa Heads - Noosa Parade Stop 28 65,000 65,000 320 0.49%
Noosa Junction Transit Centre - improve 40,000 40,000 0 0.00%
Peregian Beach - David Low Way Stop 87 125,000 125,000 3,036 243%
Sunrise Beach - Wollomia Way Stop 11 40,000 40,000 1,171 2.93%
Whole of Shire - bus shelter DDA 20,000 20,000 18,706 93.53%
Noosa Bus Station Safer Streets Program 175,500 117,900 2,067 1.75%
Noosa Heads - Noosa Parade Translink 700596 0 40,000 480 1.20%
Noosa Heads - Noosa Parade Translink 700584 0 50,000 932 186%
Tewantin - Butler St Translink 700490 0 50,000 1,957 3.91%
Tewantin - Butler St Translink 700491 0 35,000 2,054 5.87%
Noosaville - Weyba Rd Translink 700585 0 40,000 812 2.03%
Noosaville - Weyba Rd Translink 700521 0 65,000 273 0.42%
Noosaville - Weyba Rd Translink 700522 0 40,000 1,111 2.78%
Noosaville - Weyba Rd Translink 700456 0 50,000 1,710 3.42%
Noosaville - Weyba Rd Translink 700523 0 40,000 1,824 456%
New Noosa Bus Shelters - Design 0 50,000 17,564 35.13%
Total Public Transport Infrastructure 695,500 1,097,900 136,764 12.46%
Sealed Roads Network
Annual Sealed Road Renewal & Rehabilitation Program 0 0 23,658 0.00%
Sealed Road Pavement surveys and Investigations 0 51,600 567 1.10%
Whole of Shire - pavement surveys 60,000 60,000 0 0.00%
Whole of Shire - reseal and rehab 5,000,000 5,553,610 1,004,877 18.09%
Noosa Heads - Noosa Parade Master Plan 100,000 100,000 0 0.00%
Noosaville - Eumundi Noosa Road corridor 20,000 79,085 0 0.00%
Emergent all infrastructure renewal 2,951,898 2,545,350 11,640 0.46%
Total Sealed Roads Network 8,131,898 8,389,645 1,040,742 12.41%
Sports Ground and Facilities
Girraween Sports Ground irrigation 28,000 14,000 16,884 120.60%
Girraween Sports Complex Lighting 0 10,000 0 0.00%
Total Sports Ground and Facilities 28,000 24,000 16,884 70.35%
Stormwater Drainage
Daintree Estate - Flood Mitagation Planning and Design 0 0 4,423 0.00%
Gympie Terrace Pipe Rehabilitation - Investigation & Design 0 11,300 0 0.00%
Rifle Street Pomona - Flood Mitigation Planning and Design 0 0 0 0.00%
Seaview Ck - open drain civil works 0 44,700 43,011 96.22%
Gympie Terrace pipe rehabilitation 200,000 200,000 0 0.00%
Re-lining of Ben Lexcen stormwater 50,000 50,000 202 0.40%
Whole of Shire - stormwater CCTV 10,000 10,000 739 7.39%
Whole of Shire - stormwater structures 150,000 150,000 0 0.00%
Whole of Shire - Flood mitigation stage 2,802,970 2,802,970 245,617 8.76%
Total Stormwater Drainage 3,212,970 3,268,970 293,993 8.99%
Streetscapes and Road Corridors
Forward Planning for Streetscape and Road Corridor improveme 0 1,715 4,959 289.17%
Peregian Beach - precinct planning 50,000 50,000 0 0.00%
Total Streetscapes and Road Corridors 50,000 51,715 4,959 9.59%
Transport and Infrastructure Management
Eenie Creek Road / Langura Street Intersection safety upgrad 0 16,503 16,503 100.00%
Eenie Creek Road / Walter Hay Drive Intersection safety upgr 0 109,100 21,210 19.44%
Weyba Road Reef Street Intersection Improvements - PIP 0 118,500 3,152 2.66%
Noosa Junction Disabled Parking CBA Frontage 0 20,000 6,426 32.13%
Whole of Shire - On Road Cycle Network 125,000 0 0 0.00%
Sunrise Beach - Ben Lexcen Dr school 70,000 80,000 10,888 13.61%
Whole of Shire - Road Directional Signs 40,000 40,000 0 0.00%
Cooroy Noosa Road - Beckmans Rd Intersec 110,000 110,000 25,071 22.79%
Total Transport and Infrastructure Management 345,000 494,103 83,250 16.85%
Waste Management
Noosaville Landfill - bio basin 446,900 446,900 9,012 2.02%
Noosaville Landfill - sediment control 297,000 297,000 8,107 2.73%
Noosaville Landfill - stormwater 50,000 0 2,367 0.00%
Total Waste Management 793,900 743,900 19,486 2.62%
Grand Total 22,676,868 24,893,093 5,167,854 20.76%
Page 11 of 20See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.