Council archive · source document
000A88A4.11C.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
¢ » Cardna . MBK 5.0 SEWAGE TREATMENT AND DISPOSAL Cardno MBK were provided with a brief to develop a sewerage system that would adequately service the proposed development and clearly meet the environmental goals of the Noosa North Shore Eco-Tourism Portal. These goals in the most generic form focus on the design and - consirucition of a fit for purpose sewerage system that would be integrated within the site’s physical and environmental constraints. The detailed design phase will place major emphasis on meeting these objectives. An analysis of the expected equivalent tenement (ET) that will be generated by the proposed Noosa North Shore Eco-Tourism Portal was carried out. The final layout and composition of the Noosa North Shore Eco-Tourism Portal will be determined at Development Permit stage. The following assessment is based on the layout option presented in the illustrative plans included in the Noosa North Shore Eco-Tourism Portal Development Code. Table 5.1 below provides an indication of the equivalent population that is expected from the proposed development of the western and eastern areas. The following assumptions have been adopted for the calculation of the equivalent population levels. A conversion rate of 0.5 ET per Eco-Cabin. A conversion factor of 0.33 ETs per Lodge room. An assumption of 3 ET for each of the Interpretive Centre and Café facilities has been adopted for this report. A conversion factor of 3.2 EPs per ET has been used. ON = a The proposed conversion rate for the eco-cabins is deemed to be representative of the type and nature of this development and the expected realistic occupancy rates that the Noosa North Shore Eco-Tourism Portal will generate. Table 5.1 : Equivalent Population Calculation Eco-Cabins 90 cabins 0.5 ET/cabin 144 Ledge 80 rooms 0.33ET/room 5 85 Accommodation | retive Centre 140 sq. metres 10 Café 130 sq metres 10 TOTAL EP 249 in order to ensure that there is an element of conservatism in the estimation of expected equivalent population, the sewerage system and the proposed treatment plant will be conceptually designed for a capacity of 350 EPs. Therefore should Nocsa Council request higher conversion factors, these will be accommodated by the additional capacity design. Table 5.2 details the corresporiding sewage flows that will be generated from the proposed development. The following assumptions have been taken into consideration in the calculation of the sewage flows. i. Average Dry Weather Flow Rate (ADWF) -180 L/EP/day 2. Peaking factor ADWF — Peak Wet Weather Flow (PWWVF) of 5 It should be noted that the traditionally adopted ADWF rate of 225 L/EP/day is more indicative of a typical residential lot with established gardens, which will not be the case in this proposed PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Portal September 2003 LA7296-03\ReporliFINAL REPORT ~ 18Sept03.doc Commercial in Confidence Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.11C.tifRelated documentApplication case desk ↗
About this file
- File size
- 91 KB (small file)
- File type
- TIF
No other editions are linked here.