This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
4... ‘APPLICATION FORMS: 7 OT,” oe Cy
4.1. Form 1 PartA
1.1.1. Ensure that the form is fully compieted. vO
4.1.2. In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 Ifthe owner of the land is a company, either ACN No. or Company Seal required.
1.2. Formt Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms 8-O are attached.
1.1.2.4. Ensure that each of Forms B-O which are attached are fully completed. [7]
2, REFERRALINFORMATION.”” 2 7 ne A
2.4 Ensure that items 1-23 have been checked and/or completed with regard to referrals. [=]
3. ~ ENVIRONMENTALLY RELEVANT ACTIVITIES”
3.1. Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
"FORM 2.- REQUEST TO CHANGE APPROVAL ~~~ wy
4.4. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5... PLANS ¥- .
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa!
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6. SUPPORTING INFORMATION 0. weer ve a
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
Se
cama gerne a emer ee ee
7. -FEE OS Oe See we oe Teme ae
7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form.
cate... Wulear vesteneeeeeneeeee
Having completed this form and accepted the @pplication, please deliver both to the following IDAS Application Receiving
trays:-
«If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
«Ifthe application is for an Material Change of Use & Reconfiguration - AOP‘1’s desk in the Land Use Section.
«Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
« {nall other circumstances — AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
Receiving Officer
SEP! g:\antorms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 20 pages
Page 2
OS Nov 2007 15:54 Artech 7 Pro-tilt FACSIMILE TRANSMISSION Attention: Trish Sweeney Company: Noosa Council Fax Number: 07 5447 1062 From: Ian Olifent Date: 5 November 2007 Pages: 3 os 8362 1S55 p-1 elaatein| Ola Mes ARTECH PROPERTIES PTY LTD PROPERTY DEVELOPERS LICENCED BUILDERS REGISTERED AGENTS 37 KING WILLIAM ST KENT TOWN SA _ 5067 E [email protected] T 08 6362 1555 F 08 8362 1955 ABN 33 169 024 894 If this transmission ia not received in full, pleasa contact us on the above telaphone number. This document and any following pages are intended solely for address, and we shail gladly refund your costs in full. Thank you. the named addressee, are confidential and may contain lagelly privfeged infomation. The capying or distribution of them o7 any Information they contain, by anyone other than the addresses, is prohibited. ff you recelve this document In error, please advise us by telephone, ratum by mall to the above Dear Trish, RE: DEVELOPMENT APPLICATION FOR 46 ELIZABETH STREET NOOSAVILLE I refer to the development application in respect of the above property, which I have lodged with the Council. Please find attached a copy of IDAS - Common Details Part A signed by the land owners of 46 Elizabeth Street Noosaville. Yours faithfully, Tan Olifent @ Managing Director ARTECH PROPERTIES PTY LTD M 0414 866 717 E [email protected] NoosaCC Fax2007 1105
Page 3
QOS Nov 2007 15:54 Artech ¢ Pro-tilt os 8362 1955 p.2
65/11/2887 13:41 754439665 MARSH AND KANE PAGE @1/02
02/11/2007 11:68 9952226996 FOODHWORKS PAGE 61/82
WITROAATED PLanttnes AoT 1007 Pen A, Varman 2.4 29 Mey 2008
c eI SLONOLA RITE MIeT? nee
Common details aA
on Pen A & peanetatony for A rund be eco ‘eoarpiete C IDAS Assowsmrent Chacieet &
‘arta 5) or yee Sse fendacfamecenna Feeow oom eyes totes
penne bree amen ——— tha fot ming toler © Giddis f:
hand . fh. Strat address:
i See .
_ Name of walt body oF wasersours, dfn wich the davelopmont proposed: Wgaail ,
{
_ Ubon plan desotiption rig Zar ster APARNA oppress
‘Peco ons. [ Lot2, AP 78262 _|
che: Potenctariat 4 _ Tha shvedenctiion je tor, act johns bef ‘i
«priocmtd does mad ige ay O* ween
Ar creumat ty, 0 weber BY
Tas "Lal aeril es web ho Ka eid 1 San mn mya
[Noosa Shire Counct _
Tb. Port euttantty or the etratagte port land or siratagio port land Ge area an which tho
mr at devekiprcontia proposed: ae Aur a‘dtdom Pot cf Reeth We weby
Ded fo ont. For wae. f ;
Propessldetaiie 40, | Leo of een an’ Woe Niwah, S09 Ate). . .
tran vrai ana ww | os {-
coat ner riawrmaro eye. .
. : .. Proponnd use of the bad: Ag Forel aractoey Se
1 a PORE 9 Bea we 17 COR ON ranks w!
Seernnalate aia aRoon .
roves torThem heehee ma ea vf
ven sat of Fon 4 may pp rile te ws os .
Applica, 4 Lye. ABs: Comagl persone! _—
waghemernes, | | [tan Oftent J)
Meecaerienant foe ie mencatca = 114. Contd number | 18. . Fenaime numnberfa-mat actdress:
Waterborne beeen : [one Bee 717 |.» [oaesez 155 ee |
erm ate RTCA 47. ‘Pasta address: : .
maamre os OWT : _ {ig Won Sasa et Tavs WAST |
mami be Powe, ae . . 10. Ota’
Page 4
OS Nov 2007 15:54 Artech ¢ Pro-tilt 08 8362 1955 p-3
65/11/2087 13:41 . 068754499666 MARSH AND KANE PAGE 2/82
02/11/2807 11:58 0382226336 FOODWORKS PAGE 682/02
INTEGRATED PLANNING AGT 1857. ce “Pam, Version 24, 2 May 008
Lead owner's conann wrqtany | 20, Lend.omnere,consent ic fhe raking of this epphoation:
Bectan 1.1/9 d be PA emecrap fe dn 7] toe Signature Dee
Peromnarnosemenerenaen :
ini . 6 Muay Chae Retertnon
seme cape ti noe a oases searsremmenserecenase cope
Cerrurve ertteneet Desmond? a, Ter pl yes Ruin yc. aug rm ar
Seaenitierowiensan eee: 6s Gone fitter! ragoaurt Aa 106
seamen wvrrart on sheen tor wppicaters hut;
wha dqrensites Rae mente =: . -
Saosin om PA rai it R. Ths appicenen weccompatadcy eaidocs: mtagneeted
{U:{) of the gitee atin of ‘dian tUnramnt fo, ad pesos - sited emitmce owe O70
‘Ow ll iy fe dnt ei ty owe ome .
on of, of erpiamesit td, the resource - 90
. Ba tracted invade che dpatnentadrtnstedng tron i ated
came ton ae
aor:
_ (bone dan ens athe Sayiviaia
nlcterin th rasource A”
2
Assecenant tigger ae a Paw Ps ee aiees an
YES : (O..NO ~o aapnasnann nemo ney rete by ecran fos apical 7 Fe
e@ ws stee dee aoeremade at . cola ae
—= -
PLEAGE NOTE: The esseserend aunaces may pefisn 1 eoompt an ape cation Dat at he Bree of tosigemient, full to prove sl aaphoxble inheraion mqaired by PETA
04 pay coher ratevent pan of Fern 1.
Page 5
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
Form 1 Development PNysior oy
Common details 2!
The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.aid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land 4. Street address: fretudinghouse number, street name, suburbfocality name & postcode) (if applicable)
All land the subject of the application, must be . .
ened However, destin of on srl [ 46 Elizabeth Street Noosaville
eee eon Acaay en 2. Name of water body or watercourse, within which the development is proposed: /fapolicable)
Advice for completing Q2 - Q2 applies if
development is proposed within a water body or L M14 .
watecourse. 3. _Loton plan description (ag. Lot 123 0n RP 4567)! GPS coordinates:
Advice for completing Q3- Mast land can be
ientted by alt on plan description. These details | Lot 2, RP 78252 |
Fane ined from le documents ortouah Be | 4 The above description is for: ck applicable box)
However, ifthe tand on which the devetopment is KX] (i) the land on which the development is proposed; or
Foor a nan (Gi) the land adjoining the water body or watercourse, within which the development is
watercourse) provide — proposed; or
the lot on plan description far the nr
OO a egoent ee (1 (iii) the water body or watercourse.
i) GPS coordi there i
a molar gfadacent ton, og. in Mareton Bay). §. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (a? or ha):
Advice for completing Q7 - Q7 does not apply if the
development is within a water body or watercourse. | L [
Adve forcomoletna oe C8 spies, __{8. Local government area in which the land is situated: (eg. Est; Hervey Bay, Woocoo et) ft applicable)
Note: Areas below high waymark oe not within a [ Noosa Shire Council |
focal government's area unless, fed for under the
Local Government Act 1993, 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 - Q9 applies if i . 5 -
espe rgetcae tege development is proposed: /eg. Port of Brisbane, Port of Townsville) (if applicable)
port land, a. Fogmore Hecefer to Guide 11
epee
osatdetails 10. Existing use of the land: (eg. vacant single house, shop etc)
7 ete aitadle, ¢ [ Site hase
RECE] VE i 11. Proposed use of the land: eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
~5 NOV 2007 =
[Stage fimse ]
Loge.
oh rf icablp parts of Fon , 7 |42. Other parts of Form 1 completed as part of this application: (eg. Part D, Part, etc)
sustamen te aconpseen(eies | (Aas Dot rays coe cus
2 part of Form. may-appfy refer to Guide 1
Applicant detaifs* 4 —" 13. Applicant's name: 15. Contact person:
Clearly identify who is making the application. The ,
applicant need not be the owner of the land. [tw Out FAA | lan Olifent _|
When signing and lodging this application 14. Contact number: 16. Facsimile number/e-mail address:
The applicant ts responsible fc ring the
Inoomaon pov Is come. Te assessment [0414 866 717 ~] [08 8362 1955
anager, ferral & the Chief Executive
fwhere apotzeie wil lyon thisinfomaton when | 17. Postal address:
assessing and deciding the application. 7" .
Ifthe applicant Is a company - a contact person [37 King William Street Kent Town SA 5067 ]
musi be shown, 18. Signature: =“ S~—~_ 19. Date: .
Lala
Wi
GF
Page 6
INTEGRATED PLANNING ACT 1997
a
br
EINE ‘
ssessable
Ys
Cr
“
Material change of use
against a local government's planning scheme
Part D, Version 2.0, 4 October 2004
es ¥
Cr =~"
Compitiy ofAll applicable questions on Part D is mandatory for all applications involving assessment of a
dy! OV faterial change of use (MCU) assessable against a local governments planning scheme.
Nature of the application 4. This application is for: (tick 1 or both if applicable)
A development Permit authorises ii CO Preliminary approval for a material change of use of premises including conceptual
seer ta sep h Gs enproval process design for any associated works that require approval under the planning scheme (ie.
and does not authorise development to occur. consideration of the proposal concep!)
AND,/ OR
A development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of “grass floor area” go to
the planning scheme against which the ATIVCHED R2rAirs Zon Roa haat. |
application will be assessed.
3. Existing gross floor area: (if applicable) [ AnrxX_[ba~~ ]
4. “ano any existing easements on the land?
NO
(YES - attach plans of the location and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
vacant land fo industry (tyre manufacturing) etc.)
[ RID UEE Sersnn% AE Witt AW far~e |
6. Number of employees: | —_ |
7. Operating days and hours: | - |
Associated building works details (if Site cover: 2 ‘
applicable) 8. 252. 7— Sf
For the definition of ‘site cover’, “gross floor r . [yats (/ pey) |
area’ and “storey* go to the planning scheme 9. Gross floor area: uD
against which the application will be . .
aeceseed, Pen 10. Number of on-site car parking spaces: | “Ke
11. Number of storeys / maximum height above natural ground: al €:(m— Fo
13. Hours and days the use will operate |
Associated operational works details | 14. Details of associated operational works (eg. fandscaping, cut and fill, drainage, road works etc.)
(if applicable)
La:
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY {applicable to assessment manager)
DATE RECEIVED
S)utey
REFERENCE
NUMBER/S
On| 2244
Page 7
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
Land owner’s consent (i agpfcable} 20.
Section 3.2.1(3) of the [PA prescribes that an
application must contain, or be supported by, the
written consent of the land owners, if the application
involves:
() amaterial change of use;
(i) reconfiguration of a lot;
(i) work on land below high-water mark & net within a
canal as defined under the Coastaf Protection and
Management Act 1995 0r
(iv) work on rail corridor land defined under the
Transport Infrastracture Act 190.
Section 3.8.4(2}(a) of the IPA provides that
landowners consent is not required for a mobile or
temporary ERA.
For more information refer to Guide 1.
Land owner's consent to the making of this application:
Name Date
(i) Murray Charles Richardson Jo As fosna?p Cra ,
(ii) | Sandra Joy Richardson
Signature
Resource entitlement (applicable) 21,
Section 3.2.1(5) of the IPA requires evidence of
resource enittement be given for appkcations that
involve a prescribed State resource.
Section 3.2.1(10){a)(i of the IPA prescribes that an
appfication cannot be taken to be properly made 22.
without evidence of the resource entitlement.
Advice for completing Q21 & 22
Refer to schedule 10 of the /nfegrated Planning
Regulation 1998 that prescribes the nature of evidence
required by the State in support of the lodging of this
development application.
Advice for completing Q23 23.
The information in (I) - (v) is mandatory if evidence is
required under Q22 (ii) of (ii) above.
‘The official stamp of the Department of Natural
Resources, Mines and Water Is mandatory where the
application involves any water or riverine quarry
material under the Water Act 2000,
Section 3,2.1{5A) allows the resource manager to limit
the time the evidence may be used, Q23 (vi) must be
completed if the evidence is time limited.
Assessment triggers 24.
This checklist does not apply if the application requires
the completion of Parts A and B of the Form only, It
must be completed for afl other applications.
Does this application involve a State resource prescribed under a regulation fother than involving
TWO ‘on State coastal land under the Coastal Protection and Management Act 1995f?
NO - 90 to 024 [YES - go to azz
This application is accompanied by evidence: (tick applicable box)
CQ) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(v)
C (i) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource - go
to Q23
D (ii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to 023
Evidence of the resource entitlement:
(i) Resource entitlement / authority details (vil) Official stamp of the department
administering the resource /i/
applicable}
(ii) Name of — officer
{iii) Position of — officer
{iv} Signature of delegated officer
{v) Date
(vi) pe date of evidence Cee
he IDAS Assessment Checklist completed and attached to this application?
YES
[J NO - te assessment manager may refuse to accept this application on the
grounds that the application has not been properly made
Plans | drawings / reports 25.
An application should be accompanied by details to
‘support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
Notification to understand the scope of the proposal
and any potential impact.
Plans/drawings/reports accompanying this application:
Plan / Drawing / Report Number
PLEASE NOTE: The assessment manager may refuse to accept an application that, al the time of lodgement, fails to provide all applicabte information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (agpticabee to assessment managers)
DATE RECEIVING OFFICER'S |D REFERENCE
[FEE GS | RECEIVED SJ le} NAMEIS IPS Aree on | NUMBERIS | {224 ! |
Notification of Engagement of Private Certifier (Optionat forme} |
To, Counc. | have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement / /
Accreditation Number:
Name:
Signature:
Page 8
INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 15.0, 18 November 2005
a i Peo a
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist}
IMPORTANT NOTE FOR ALL APPLICANTS:
4, This checklist was formerly referred to as the "Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
"Referrals Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe its function,
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (¢.9. Environmental Protection
Agency, Dept. of Natural Resources and Mines, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queenstand State entity and may also assist the applicant to
determine the assessment manager’ for the application.
Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
It is the responsibility of the applicant to accurately complete this checklist.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
‘The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?,
To assist you in answering the following questions a series of guides are available free from www.ipa.qid.gov.au.
9. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au.
10. Section 2 provides advice about the referrals that can be required for applications for building work assessable against the Standard Building Regulation 1993 (SBR).
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Standard Building Regulation 1993 (SBR).
NOaAS
=
Environmentally relevant activity 1, The application involves: (tick applicable box/es)
For more information refer to Guide 4, (1 (i)_ an environmentally relevant activity (ERA) for which a code for environmental compliance
Se a ree voces has not been made - complete Part G of Form 1
administering authority®, C1 (ii), a mobile or temporary ERA for which a code of environmental compliance has not been
It an entity, other than the fr ihe apple authen is / made - complete Part G of Form 1
the assessment manager for the application, the a8
administering authority is a concurrence agency for (iii none of the above
the apptication in retation to this matter.
Nota: An application involving ERA 19 and/or 20 will
also require completion of Parl Ky of Form 1 for
approval where an allocation under the Water Act
2000 is required.
State-controlled road matters 2. The application involves: (tick applicable box/es)
evened noe athe ov! woz, ne| _E2() development on land contiguous to a State controlled road and for -
ee eR) referral ote Denatment a C (a) material change of use assessable against the planning scheme;
In certain circumstances DMR will be an advice O (b) reconfig uring alot unless -
agency, while in other circumstances DMR will be a « the total number of lots is not increased; and
chet pete e slton wil asst you'o « the total number of lots abutting the State-controlled road is not increased;
determine where DMR is an advice or concurrence (1 (c) operational work (not associated with a material change of use assessable against the
agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)-
associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
4 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule BA of the IPA.
2. For additionat information refer to Guide 6 ‘Does my application trigger the referral coordination process?"
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).
4° Land contiguous to a State-controlied road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controiled road; or that is part of a future State-
controlled road.
Page 1
Page 9
r
INTEGRATED PLANNING ACT 1997
State-contralled road matters (cont)
IDAS Assessment Checklist, Version 15.0, 18 November 2005
CH (ii) development on land not contiguous to a State-controlled road and -
O(a) material change of use -
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
CO (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
C1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
ii none of the above
Clearing vegetation
For mose information refer to Guide 12.
Unless you answered “none of the above" to Q3, the
application requires assessment by the Departmen}
of Natural Resources and Mines (NR&M).
If an agency other than NR&M is the assessment
Manager for the application, NR&M is a concurrence
agency for the application in relation to this matter.
The application involves: (tick applicable boxes)
C1 (i) material change of use ~
(a) assessable against the planning scheme;
{b) on a lot containing -
¢ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
e if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
(ii) reconfiguring a lot -
{a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
C1 {il) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
¥ (iv) none of the above.
Strategic port land
For more information refer to Guide 11.
If you ticked (i} - the relevant Post Authority is the
assessment manager for ihe application.
If you ticked (ii) Queensland Transport is a
concurrence agency for the application.
The application involves:
(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1
U (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part f of Form 1
A iii)
none of the above
Acid sulfate soils
For mora information refer to Guide 10.
Unless you answered “none of the above” to QS, the
application requires assessment by Department of
Natural Resources and Mines (NR&M).
If an agency other than NR&Mis the assessment
manager for the application, NR&M is an advice
agency for the application in relation to this matter.
The application involves development on land situated in an identified5 local government area
and where the surface of the land is: (tick epplicable box)
LJ (i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or
LO (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material
win none of the above
5 The identified locat government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Cabooiture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Rediand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
6 Australian Height Datum (AHO).
Page 2
Page 10
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 15.0, 18 November 2005
Major hazard facilities or possible 6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities majoy hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more information refer to Guide 17.
If you answered “YES” to Q6, the application NO
requires assessment by the Department of .
routes assessment ee (YES - complete Part L of Form 1
Ian agency other than DES is the assessment
manager for the application, DES is a concurrence
‘agency for the application in relation to this matter.
Water related development under the |7. The application involves:
Water Act 2000 CJ (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
For more information about items (a) — (0), refer to (tick applicable box/es)
Guide 15. For more information about item (e), . .
refer to Guide 14 Does my application involve C1 (a) ina watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
assessment of a referable dam? @ pump, gravity diversion, stream redirection, weir or dam) - complete Part K2, Ks, Ks, Ke, or Ks of
Unless you answered ‘none of the above" to Q7, the Form 1 whichever is applicable;
application requires assessment by the Department . .
of Natural Reso urces and Mines (NR&M). (J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
If an agency other than NR&M is the assessment Ky of Form 1;
manager for the application, NR&M is a concurrence . ¥
agency for the application in relation to this mater. (J (c) for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part K of Form 1;
(J (d) for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K; of Form 1;
1 (e) for constructing a referable dam® or that will increase the storage capacity of a
referable dam by more than 10% - complete Part Ks of Form 1; OF
(C1 (f) for taking or interfering with overland flow water - complete Parts Ks and G of Form 1
| (ii) none of the above.
Removal of quarry material from a 8. Does the application involve development for the removal of quarry material from a watercourse?
watercourse reqyring an allocation notice under the Water Act 2000?
For more information refer to Guide 16. NO
\f you answered “YES" to Q8, the application
requires assessment by the Department of Naturat (2 YES - complete Parts K, and G of Form 1
Resources and Mines (NR&M).
if an agency other than NR&Mis the assessment
manager for the application, NR&M is a concurrence
agency for the application in relation to this matter.
Note: Part G of Form 1 is required to be completed
as the activity of removing quarry material from a
watercourse is also an Environmentally Relevant
Activity (ERA).
Operational works in a tidal areaor |9. The application involves operational work that is: ( tick the applicable box/es)
coastal management district
For more information refer to Guide 18. For more
information about prescribed tidal work in tocal
government tidal areas refer to Guide 24.
Unless you answered ‘none of the above" to Q9, the
application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPA is a concurrence
agency for the application in relation to this matter.
Local government is the assessment manager for all
prescribed tidal work.
C1 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; or
Oi)
tidal work that is prescribed tidal work"! other than in a canal’? -complete Part P of Form 1; oF
D iii
carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to {i) befow are ticked.
C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal' intended to be connected to tidal waters;
constructing an artificial waterway;
teclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wail to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
(iv) none of the above.
Ob)
Ot)
Od)
Oe)
OW
O@)
0 (h)
Dw
7 The declared ground water areas are listed in
Guide 13 Development in 2 declared:
8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA.
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
Page 3
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)
mark . . (J (i): tidal work*3 as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For more + . A
information about prescribed lidat work in local Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
Government Sal areas refer to Guile 24 (ii) tidal work that is prescribed tidal work"* - complete Part P of Form 1; 0
Unless you answered ‘none of the above" to Q10, - . wae oo.
the application triggers referrat to Queenstand C1 (iii) carried out within a coastal management district's under the Coastal Act and for -
Transport {QT} (Maritime Safety Otd) as a . . 7 . ope ge
concurrence agency. LC (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager for all M of Form 1;
prescribed tidal work. aa .
wo (b) reclaiming land under tidal water - complete Part M of Form 1; or
(J (c)_ constructing a canal’s, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
din none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
he more information refer to Guide 16. (i) amaterial change of use assessable under a planning scheme involving operational
inless you answered ‘none of the above” to Q11, “ + 5 ctrit5
the application requires assessment by the work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). C1 (i) a material change of use assessable under a planning scheme involving building
Hf an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
manager for the application, EPA is a concurrence : .
agency for the application in relation to this matter. « the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2
C1 (il) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
Oi (iv) reconfiguring a Jot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® - complete Part M of Form 1
aw none of the above
Development within the limits of a 12. Does the application involve development below high water mark’? and within the limits of a port
port unger the Transport Infrastructure Act 1994?
For more information refer to Guide 18. For NO
information about prescribed tidal work refer to
Guide 24. (11 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
tf you answered “YES” to Q12, the application
triggers referral to the Port Authority,
The Port Authority is a concurrence agency if the
development is ~
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port
© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, ancharage or spoil
grounds;
© within 1000m of a planned port facility identified
in aland use plan approved under the Transport
Infrastructure Act 1994.
4n all other situation the Port Authotity is an advice
agency.
Marinas 13. Does the application involve operational work that is tidal work for a marina” with more than 6
For more information refer to Guide 18. For vesgel berths?
information about whether a marina is prescribed AN
tidal work refer to Guide 24. The tocal govemment NO
i for all prescribed tidal
ise assessment manager for al prescribed hi LL YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work
Ifyou answered "YES" to 013, the application
triggers referral to Queenstand Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tidal] 14. Dogs the application involve tidal works within a strategic port land tidal area?"?
areas
For more information refer to Guide 18.
Unless you answered “NO” to 014, the relevant Port
Authority is the assessment manager for the
application and the Environmental Protection
Agency {EPA} and Queensland Transport (Q7) are
concurrence agencies for the application.
NO
(21 YES - complete Part M of Form 1
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastat Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 Canal means canal as defined under the Coastal Protection and Management Act 1995
17 GFA is defined in sch 14 of the IPA to mean the gross fioor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
18 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificiat waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
49 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
Page 4
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005 Heritage 15. Does the application involve development in a heritage registered place as defined under the For further information refer to Guide 19, Queénsiand Hentage Act 1992? Kyou answered “YES to Qi5, the application NO biggers refercal to the Queensland Heritage Council as concurrence agency for the application. Oo YES - complete Part C of Form 1 Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and For more information, including a list of the dectared involves: (tick the applicable box/es) catchment areas within Queensland, refer to Guide . . . . . 13, _ (4) reconfiguring a ot, if any lot resulting from the reconfiguration is less than 16 hectares; mess you answered “none of the above’ to a6, Li (ii) development assessable against the planning scheme involving the establishment or Ceol Neha Rosaaces oe Mines expansion of a waste water disposal system, other than a disposal system for carrying (NREM), out an environmentally relevant activity under the Environmental Protection Act 1994; If an agency other than NR&M is the assessment ad ae Manager for the application, NR&M is a concurrence (ii) none of the above agency for the application in relation to this matter. Contaminated land 17. The application involves: (tick the applicable box/es) Applications involving material change of use and / 7 7 ji it i: - of reconfiguting aot may tigger lis referral, Ow reconfiguring @ fot for which all of part of the premises are For more information refer fo Guide §. (a) premises mentioned in the IPA, schedule 8, part 1, table 2 - Unless you answered ‘none of the above" to Q17, « item 5, including the exemption otherwise provided for by paragraph (d); the application requires assessment by the « item 6, including the exemption otherwise provided for by paragraph (e); or Environmental Protection Agency (EPA). If an P ‘ ; i : ided f ai ii ) ‘agency other than EPA is the assessment manager * item 4, including the exemption otherwise provided for a mining activity or petroleum for the application, EPA will be a concurrence activity; or agency for the application in elation fo this matter. b) in an area for which an area management advice has been given for unexploded 9 g p ordnance - complete Part N of Form 1 LD (ii) a material change of use - (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or (b) assessable against the planning scheme and if all or part of the premises is in an area for which an area management advice has been given for unexploded ordnance - complete Part N of Form 1 oi none of the above Electricity infrastructure 18. The application involves: (tick the applicable box/es) For more information refer to schedule 2of the IP Regulation. Untess you answered "none of the above" to 018, the application triggers referral to he agency to which the easement is granted in favour of as advice agency. C1) reconfiguring a fot where any part of the lot is - subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; or « situated within 100m of a substation site; a material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if — any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; and « any structure or work that is the natural and ordinary consequence of the use is, or will be, located wholly or partly in the easement; a material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if any part of the premises is situated within 100m of a substation site; LJ (iv) operational work that is filling or excavation assessable against the planning scheme, not associated with reconfiguring a lot, if - any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the work is located wholly or partly in the easement; the work is located wholly or partly within 10m of a substation site; none of the above. OG) Di of 24 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
Page 13
INTEGRATED PLANNING ACT 1997
Land designated for community
infrastructure
Applications involving development on land
designated for community infrastructure may trigger
this referral.
For more information refer to schedule 2 of the IP
Regulation.
If you answered “YES” to Q19, the application
fequires assessment by the chief executive of the
department administering the Act authorising the
development for the designated purpose.
If an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this matter.
IDAS Assessment Checklist, Version 15.0, 18 November 2005
19. Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
{ii), other than development —
(a) for the designated purpose; or
he carried out by, or on behalf of, the designator.
NO
EJ YES
SEQ Regional Plan
For more information refer to schedule 2 of the !P
Regulation.
Unless you answered ‘none of the above" to 020,
the application requires assessment by the Office of
Urban Management (OUM).
20. The application involves a material change of use of premises in the SEQ Region22 for: (tick the
applicable box/es}
C1 (i) urban activities23, other than where the premises are zoned for urban activities under a
planning scheme in a rural village or the Mt Lindesay/North Beaudesert Study Area, for
which all or part of the premises, the subject of the development, is in the -
(a) Regional Landscape and Rural Production Area;
(b) Rural Living Area;
(c) Investigation Area; or
(d) MtLindesay/North Beaudesert Investigation Area.
C (ii) rural residential purposes?5 where the premises are not zoned for rural residential
purposes and the premises are in the —
(a) Regional Landscape and Rural Production Area;
{b) Investigation Area; or
{c) MtLindesay/North Beaudesert Investigation Area;
ad {iii) none of the above
Fisheries matters
For more information refer to schedule 2of the IP
Requiation,
Unless you answered “none of the above” to Q21,
the application requires assessment by the
Department of Primary Industries and Fisheries
(OPI&F).
Hf an agency other than DPI&F is the assessment
manager for the application, OPI&F is a concurrence
agency for the application in relation to items (i) -
(iv) and an advice agency in relation to item (v}.
21. The application involves: (tick the applicable boxes)
(CU (i) anassessable material change of use for aquaculture - complete Part O; of Form 1;
C(ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;
CU (ii) assessable operational work completely or partly within a declared fish habitat area-
complete Part Oz of Form 1;
Li (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
C1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
of, declared fish habitat area;
(vi)
none of the above.
22 Local Governments within the SEQ Region are identified in the South East Queensland Regional Plan as Beaudesert Shire, Boonah Shire, Brisbane City, Caboolture Shire, Caloundra City, Esk Shire,
Gatton Shira, Gold Coast City, Ipswich City, Kilcoy Shire, Laidley Shire, Logan City, Maroochy Shire, Noosa Shire, Pine Rivers Shire, Redcliffe City, Redland Shire and Toowoomba City.
23 Urban activity means urban activity as defined in schedule 2, Part H Regulatory Provisions, South East Queensland Regional Plan. The term includes some facilities and purposes and excludes soma
purposes. A single residential dwelling on a lot is not included in urban activity.
24 Rural village means rurat village as defined in schedule 2, Pari H Regulatory Provisions, South East Queenstand Regional Plan.
25 Rural residential purpose means rural residential purpose as defined in schedule 2, Part H Regulatory Provisions, South East Queenstand Regionat Plan.
Page 6
Page 14
INTEGRATED PLANNING ACT 1997
Integration of Jand use and public
transport
For moe information refer to Guide 23, schedule 8A
of the [PA, & schedule 2 of the IP Requiation,
Unless you answered ‘none of the above’, the
application tiggers referral to QT as a concurrence
agency.
IDAS Assessment Checklist, Version 15.0, 18 November 2005
22. The application involves: (tick the applicable box/es)—
CO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
CO (ii) reconfiguring a lot—
O(a) onland that is completely or partly within a public transport corridor, and the
total number of lots increases;
(J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
C1 (c) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
C1 (d) for a residential purpose within the 25 ANEF contour for an airport;
C1 (e) for a residential purpose resulting in 100 or more allotments.
(J (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
CJ (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(2 (b) _ will result in work that encroaches into an airport's operational airspace.
ds (iv}
none of the above.
Railway safety and efficiency
For more information refer to Guide 23, schedule 8A
of the IPA & schedule 2 of the IP Requlation.
Unless you answered “none of the above’, the
application triggers referral to QT as a concurrence
agency.
23. The application involves: (tick the applicable box/es)—
(i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
LD (ii) reconfiguring a fot—
(1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,
(1 (©) __ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(1 (d) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(1 (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
LJ (f) for a residential purpose resulting in 100 or more allotments.
O. (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on land that—
CJ (a) __ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
C1 (b) _ is completely or partly within future railway tand, or a railway tunnel easement;
C1 (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
in none of the above.
Referral coordination
An information request requires referral coordination
if the application invalves —
{i} 3. or more concurrence agencies; or
(ii) a facitity or area assessable under a
planning scheme and prescribed in
schedule? or 8 of the IP Regutation; or
(iii) development which is subject to an
application for preliminary approval
mentioned in $3.1.6 of the IPA.
For more information go to Guide2 and Guide 6.
24, Doeg the application trigger referral coordination?
ro
(YES, as the application: (tick the applicable box/es)
C1 (i) _ triggers 3 or more concurrence agencies;
O (ii) _ involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;
O (ili) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;
C1 (iv) _ is for a preliminary approval mentioned in $3.1.6 of the IPA
Page?
Page 15
IDAS Assessment Checklist, Version 15.0, 18 November 2005 INTEGRATED PLANNING ACT 1997 Referral agency responses priorto | 25. Did a referral agency give a referral agency response under s3.3.2 of the IPA before the lodgement application was made to the assessment manager? Under 53.3.2 of IPA a referral agency may give a dw NO referral agency response on a matter within its jurisdiction about a proposal before an application . forthe proposals mace tothe ass (DYES - attach a copy of the referral agency/s response/s manager. This is commonly the case where an application tequires referral to a building referral agency (eg. Qkd Fire and Rescue Service). PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the completed DAS Assessment Checklist (if applicable). OFFICE USE ONLY (applicable to assessment manager) i DATERECEIVED | [REFERENCE NUMBERS | Page 8
Page 16
cat INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005 SECTION 2 - BUILDING REFERRALS (completion not mandatory) Note: Below is a list of the referrals that can apply to an application for buiding work assessable against the Standard Building Regulation 1993 (SBR)}. This section of the IDAS Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an application for building work assessable against the SBR only. Fire safety For more information go to schedule 2 of the IP Regulation 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work the subject of the application requires the installation of a fire safety system. Fire safety for budget accommodation /2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the Fer more formation go to schedule 2 ofthe [P building work the subject of the application requires the installation of a fire safety system for a budget accommodation building. Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a Fe informatie to schedute 2 of the IP i lication i i i inti fey slaon on gore seweusees concurrence agency if the application involves a workplace incorporating spray painting. Retail meat premises 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application For more information go to schedule 2 of the IP i | i R vatation 9 M involves a retail meat premises. Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the For more information go to schedule 2 of the IP application involves a private health facility. Requiation Workplace area less than 2.3m? 6. An application may trigger referral to the Department of industrial Relations (DIR) as an advice For more information go to schedule 2 of the IP agency if the application involves a work place area less that 2.3m?. Regulation Land contiguous to a State-controlled|7. An application may trigger referral to the Department of Main Roads as a concurrence agency or road advice agency if the application involves land contiguous to a State-controlled road. For more information go to schedule 2 of the iP Regulation Pastoral workers accommodation 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a Fox more information go to schedule 2 of he IP concurrence agency if the application involves pastoral workers accommodation. Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency For more information go to schedule 2 of the IP if the application involves a childcare centre. Regulation Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a Fox more information go to schedule 2 ofthe 1P concurrence agency if the application involves land completely or partly seaward of a coastal building line26. Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the fat mare information go to schedule 2 ofthe IP application involves a heritage registered place. Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries For more information go to Schedule 2 of the IP (DPI&F) as a concurrence agency if the application involves assessable building work in a feast declared fish habitat area; or as an advice agency if the application involves assessable building work on land that adjoins a declared fish habitat area. Integration of land use and public 13, An application may trigger referral to Queensland Transport as a concurrence agency if the transport application involves existing or future public transport corridors, or airport operational airspace?”. For more information go to schedule 2 of the IP Regulation Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the For more information go to schedule 2 of the IP Regulation application involves future railway land. % Coastal building lines are prescribed under the Coasta! Protection and Management Act 1995. 2 Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities". Page 9
Page 17
ELIZABETH STREET SITE 507.42sq.m bound GROUND FLOOR 231.60 sq.m ouncary COVERED DECK 22.10 sq.m TOTAL GROUND 252.70 sq.m (50% SITE COVER) FIRST FLOOR 155.50 sq.m TOTAL BUILDING AREA 408.9 sq.m (80.6% PLOT RATIO) SOFT LANDSCAPE 102 sqm 20% DRIVEVAY S3YANO1 NAS BUILDING WALL SUN LOUVRES GARAGE SET BACK OUYRES = & LOUNGE ~ COVERED DECK DINING Rev.| Date | Description + [00.00.00] - a] mi mun KITCHEN SK100 - CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY pensar ‘THES DRAINING BS FO BE READ IV COMJUNCTION ISTH RELATED DRAWINGS AND STRUCTURAL & SERVICE ENGINEERS ORAWINGS. Drawn Job Dee PB . BOOT artech | zocmms i boundary j PROPERTY al F (08) 8962 1955 M0444 85 757 GROUND FLOOR PLAN invert SCALE 1:100 ! per ! | Proposed Residential development sess 46 Elizabeth Street, Noosaville, Qkd \ Orawing $ Ground Floor Plan
Page 18
w
«
uw o o[s
w wl 25 sis Mw
a o}u o|> Ris m|S mila g
4 2|s 22 fn | z= oO
S| at] & tla a Sit
alz 5 3/4
MIS a Ww
eee g
= =
eee uo
LIVING
UPPER STOREY
FIRST FLOOR PLAN
SCALE 1:100
+= 100,00,00)
Drawing No.
Sk104
Ronis
‘CONTRACTORS MUST VERIFY ALL DIMLENSIONS OW SITE BEFORE COMMENCING ANY
WORK OR PREPARING SHOP DRAWINGS.
DONOT SCALE DRAWINGS
‘THIS DRAWING 16 TOBE READ IY COKLUNCTION WITH RELATED DRANVGS AND
STRUCTURAL & SERVICE ENGINEERS DRAWINGS,
Drawn cb Date
PB . 200-07
artech | zens
KENT TOWN SA 5057
PROPERTY (oe 1588
(ee 1586
Ud 717
E sacnGamctgroy ona
Projet
Proposed Residential development
Sie address
46 Elizabeth Street, Noosaville, Qld
Orewing
First Floor Plan
Page 19
of the buildin tendered & painted concrete masonry N ORTH E L EV ATI ON rendered & painted cement sheet cladding SCALE 1:100 900 EAVE' top of the building custom orb zincalume roafing sandstone block walls anodised aluminium window frames 8100 aluminium sunshade louvres rendered & painted concrete masonry EAST ELEVATION SCALE 1:100 custom orb zincalume roofing sandstone block walls aluminium sunshade louvres anodised aluminium window frames Rev. Date | Descripfon = |onoo.o0]- Drawing No. Revision $K102 - CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK OR PREPARING SHOP DRAWINGS. DO NOT SCALE DRAWINGS ‘THIS DRAWING 15 10 BE READ (N CORJINCTION WITH RELATED ORAKINGS AND ‘STRUCTURAL & SERVICE ENGINEERS ORAWNGS. Own Job Date PB . HT artech | zscmus PROPERTY ras (08) OR? 155, ‘M04 666 717 E stech@atechyoup comar Project Proposed Residential development Ste address 46 Elizabeth Street, Noosaville, Qld Drawing Elevations
Page 20
of the bu custom orb zincalume roofing painted weatherboard cladding anodised aluminium window frames rendered & painted concrete masonry SOUTH ELEVATION SCALE 1:100 900 a —.lopofthe building Clear coated plywood eaves lining custom orb zincalume roofing TP TT ev] Date | Destin Zincalume half round gutter [9000.00) 2 bk ‘ to timber fascla 3 stone blade wa painted weatherboard cladding =4 sandstone block walls = Humini hade | Drawing No. Revison of ._fMevel____ amin sunshart ves TA Be eRe PPR eed SK103 - VT ge a EN eS eRe CONTRACTORS MUST VERIFY ALL DIZENSIONS ON SITE BEFORE COMMENCING AKY anodised aluminium window frames Deen S timber screen fence rendered & painted concrete masonry ‘THIS DRAWING IS TOBE READ IN CONAUNCTION WITH RELATED ORAWINGS AND a SSTRUCTURA, & SERVICE ENGNEERS ORAWINGS. mn Drawn xb Date PB} 8080 ; a rtech S7KNG LUST painted stee! columns PROPERTY mr THN A ser _------------- F (08) 8362 1955 M0484 BSB 717 Eaten Geechgroup.comay . Project SCALE 1:100 Proposed Residential development Sta address 46 Elizabeth Street, Noosaville, Qld Drawing Elevations
Page 21
cw LAND USE SECTION FEES ‘ow NOS : RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES: Material NgerohUse - Godel mpact onsisten L sO 521 ! iStent 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit 521 Extension of a Currency Period . 521 Operational Works - Landscaping §21 @ Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour 522 ADVERTISING Purchase Advertised Applications 523 JETTIES Jetty Application Fee 524 Jetty Bond 51 (Category 4) BONDS , Performance Bond . 51 (Category 9) SIGNS Registration Fee : 222 SE@MYH FEE Search of Land Use Section file 112 Liquor Licensing Request 113 Toman $ 650 NAME: LO fed | ADDRESS: 37 Kiewg bites n Se Lene Cpowni SA SOb7 FILENO: = ©7/ (224) pate: 7/1/07 ? RECEIPT NO: 34s 567 Signature of TP Officer: AUTHORITY NO: . x = 13/2227 / 271i)
Used in these records
07/2291 - MCU Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.