Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment B - Endorsed Landscape Plan OPW12-0100 02.pdf

of 9

Page text read automatically using OCR, there may be inaccuracies

                                                                   LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTURE



                                                                          APPROVAL ISSUE




                                                                  D          OP WORKS                                             2021-10-11         HQ HQ         WA
                                                                  C          OP WORKS                                             2018-02-23         ME ME         WA
                                                                  B          DRAFT OP WORKS                                       2018-02-06         ME ME         WA
                                                                  A          PRELIMINARY                                          2018-01-15         ME ME         WA
                                                                  ISSUE: DETAILS:                                                 DATE:               DES: DC: QA:




                                                                                              CONSULTANTS
                                                                  PLANNERS                     BRISBANE - SUNSHINE COAST - CENTRAL QLD
                                                                  URBAN DESIGNERS              BRISBANE - JFP House
                                                                  SURVEYORS                    76 Ernest Street,
                                                                                               South Brisbane Qld 4101
                                                                  ENGINEERS
                                                                                               P 07 3012 0100 W www.jfp.com.au
                                                                  LANDSCAPE ARCHITECTS JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045


                                                                  CLIENT: CLIENT NAME HERE PTY LTD
                                                                   COUNTRY CLUB VILLAGES



                                                                  PROJECT TITLE:

                                                                  NOOSA DOMAIN
                                                                  APARTMENTS
                                                                  WALTER HAY DRIVE,
                                                                  NOOSAVILLE.
                                                                  SCALE:
                                                 -



                                          NOOSA COUNCIL
                                                                  COPYRIGHT © 2017 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
                                                                  FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.

                                                                   PLAN TITLE:
                                     GENERALLY IN ACCORDANCE
                                      OPW12/0110.02 15 NOV 2021
                                                                  COVER SHEET
                                                                  SCHEDULE




NOOSA DOMAIN APARTMENTS - SCHEDULE                                PLAN NUMBER: B3730LA1-DA1 LA VM
                                                                  JOB #:


                                                                  M1717L_A1
                                                                                                     SCOPE:                           SHEET:


                                                                                                                                      CS 02 D
                                                                                                                                                                ISSUE:


[OCR of page images]
SCHEDULE - LANDSCAPE & EXTERNAL WORKS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: QUANTITIES PROVIDED ARE TO ASSIST IN TENDERING AND ESTIMATION. Totals
ALL QUANTITIES ARE TO BE CHECK MEASURED BY TENDERERS WHEN SUBMITTING PRICING.
Item Legend Code Description Specification Unit Qty.
A PRELIMINARIES AND SITE WORKS, MINOR EARTHWORKS, DRAINAGE
F 5 .
1 #0 Site Establishment
1 1 Preliminaries Refer to specification to determine minimum Sum 1
required works.
1 2 Program PROGRAM DATES, MILESTONES AND HOLDPOINTS 0
TO BE ADDED HERE
START DATE:
PC DATE:
ENTRY WALL START DATE:
REHAB AREAS START DATE:
1 3 Initial Site Rubbish Removal Removal of waste items located on site. Items to Item 1
be removed before works commences.
1 4 Set-out by surveyor required Survey by setout required. Design CAD files can Day 0
be supplied as requested.
E 5 "
2 0 Site Works/ Minor Earthworks
2 1 Shaping - adjust civil profiles to desired shape & Civil to provide site at handover minus 100mm m2 2122
trim +/-50mm of finished surface levels shown on
landscape plans
2 {2 Cultivation as perspecification Planting areas -200mm cultivation m 1230
Gypsum: Incorporate at the rate of 0.25 kg/m2. Turfareas - 100mm
REFER TO DETAIL
2 3 HOLD POINT - CULTIVATION- LANDSCAPE
SUPERINTENDENT TO INSPECTION PRIOR TO
TOPSOIL - PROVIDE Min. 72 HRS NOTICE
2 (4 Additional Topsoil due to poor site conditions ‘Vif subgrade is deemed to be a poor, i.e weathered m 1230
IF ORDERED rock, schist or heavy clay INSTALL an additional
200mm of site topsoil prior to garden bed
preparation
2 5 TPF Tree protection as per VMP - Temporary Fencing m 0
E :
3 0 Drainage
3 f1 Subsoil drains - allowance only Type: 150 mm to raingardens and 100mm Lm 0
diameter to other areas. 100mm slotted HDPP Ag
Drain wrapped in geo-textile, drainage gravel to
be 20mm recycled concrete. Queensland
Recycling Pty Ltd Ph 135 135.
CON Subsoil drainage conduits Type: 100mm UPVC Item 275
Podium planter water retention layer- IF ORDERED |Type: 100mm HydroCell foam layer with m2. 0
protective geotextile over. Refer to detail
3 «14 Pits - typically 300 x300 ACO Pits - within planting areas |Type: 300 x300 mm ACO Pits Item 33
Hot dip galv. Grates to AS1428.1
B HARDSCAPE
fa Pavements
1 General for all pavements Sealer: Provide a penetrative sealer to all
pavements except asphalt.
Sample Panels: Provide a 1m square sample
panel ofall pavements ona pallet such that it
can be moved around site as required to
compare to finished work.
Slip resisitance: All pavements to be non-slip as
defined in the BCA
2 P1 Concrete 1 Refer Architect Plans m 0
P2 Concrete 2 Refer Architect Plans m 0
4 P3, Unit paving on concrete subbase Size: 400 x 400mm each 220
Colour: TBC
Supplier: TBC
Sealed: TBC
4 5 GR1 Gravel mulch Type: 20mm washed river gravel over weedmat m 124
Depth: 100mm
E .
5 Fences and Barriers
5 1 Fl Fence type 1 - 1800 high to boundary Refer to Refer Architect specifications m 0
5 2 F2 Fence type 2 - Pool Fence Refer to Refer Architect specifications m 0
5 3 HR Handrail and Balustrades Refer to Refer Architect specifications m 0
5 4 BL1 Feature Bollard Refer to Refer Architect specifications Item 23
C SOFTSCAPE
EF.
6 Edging
6 Concrete edge to planting areas Refer to Detail. 150x150mm. m 113
6 Timber edge to planting areas - If ordered Refer to Detail m 0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OOSA DOMAIN APARTMENTS - SCHEDULE

7 TU Turf- (includes watering costs until PC)
Fd 1 Imported Soil Blend 100mm deep Soil Blend to AS4419 m” 310
Fs 2 Site Topsoil with amendments -1F ORDERED Amendments tobe addedtothe 100mm deep im: 0
site topsoil SPREAD BY CIVIL.
-Soil amendments for Site topsoil should include
the following: Gypsum at (2.5t/ha) following top
soil spread and Dynamic Lifter (2kg/10m2).
Please allow for both Turftopsoil and planting
soil
7 3 TU Turf Agrade ‘Legend’ turf supplied byJimboomba Turf m? 310
8 PA Planting Areas - (includes watering costs until PC)
8 1 Soil Blend - Site Topsoil Minimum depth 300mm deep Site soil amended mit 773
with gypsum. Mound to 450mm to centre of beds
8 2 Soil Blend - |mported - If ordered 300mm deep Soil Blend to AS4419. Mound to im 0
450mm to centre of beds. Submit sample for
apporval prior to install.
8 3 Fertiliser Apply dynamic lifter or approved equivalent as
per specification
8 4 Mulch to planting areas Forest Litter mulch 100mm deep m 773
5 M3 - Site mulch (install only) Site Mulch m2 0
6 DG1 -Decorative Gravel - 100 mm thickness Gravel Type: 20mm washed river gravel m 0
9 Planting Stock
9 1 100 Lt stock Refer to Plant Schedule Item 0
9 2 45 Lt stock Refer to Plant Schedule Item 65
19 3 25 Lt stock Refer to Plant Schedule Item 3
9 4 300mm pots Refer to Plant Schedule Item 483
9 5 200mm pots Refer to Plant Schedule Item 118
9 6 140mm pots Refer to Plant Schedule Item 2026
9 Relocation of existing palm trees. Refer Planting Plan Item a
9 7 Tube stock- Native tube min. 75mm Refer to Plant Schedule Item 0
9 8 Slow release nutrient bags Each 2697
9 9 Water retention additive foreach plant Green Harvest Rainsaver Water crystals or Each 2697
approvedsimilar
* JEP Arborist to inspect plants at nursery to ensure compliance with NATSPEC - Specifying trees
10 PC Post Practical Completion - Plant Establishment Period and Maintenance
Note Practical Completion will be given at the time the Local Authority provides
On Maintenance or Superintendant certifies completion.
10 |1 Plant Establishment Period - 12 week period Fortnightly Mowing and turf edging to all turf Week 12
areas. Fertilising, pruning of street trees as
required and chemical and physical weed
removal toall garden areas. Rubbish removal as
required
10 |2 TU, PA Watering Costs during Plant Establishment Period | Over the 12 week period watering is required to Week 12
(Provisional Sum) maintain healthy plant growth. Allow for min. 15
waters (3-1st week, 2-2nd week, 1 per week for
Note: the cost of watering prior to Practical following 10 weeks).
Completion being given is to be allowed for in Note: Rates per water will be used ifadditional
preliminaries or within softscape rates watering is required oras a credit if there is
adequate rainfall. (30mm per week adequate
. rainfall). Requirement: Advise superintendent if
All water dockets are to be provided to demonstrate = yg 5
an i additional watering is required due to hot
timing and volume of watering weather /dry conditions over and above the
provisional 15 waters.
Should the weather be excessively dry and/or
hot and additional watering is required notify
superintendent at once. Plant deaths due to
watering will be replaced at the constractors
expense.
10 |3 RV Watering Costs during Plant Establishment Period | Over the 12 week period watering is required to Week 12
(Provisional Sum) maintain healthy plant growth. Allow for min. 15
waters (3-1st week, 2-2nd week, 1 per week for
Note: the cost of watering prior to Practical following 10 weeks).
Completion being given is to be allowed for in Note: Rates per water will be used ifadditional
preliminaries or within softscape rates watering is required oras a credit ifthere is
adequate rainfall. (30mm per week adequate
All water dockets are to be provided to demonstrate miners eee en Nae i
. 2 additional watering is required due to hot
timing and volume of watering weather /dry conditions over and above the
provisional 15 waters.
Should the weather be excessively dry and/or
hot and additional watering is required notify
superintendent at once. Plant deaths due to
watering will be replaced at the constractors
expense.
fi1 PC Post Practical Completion - Ongoing Maintenance
Note Practical Completion will be given at the time the Local Authority provides
On Maintenance or Superintendant certifies completion.
11 ji TU&PA |Ongoing Maintenance after Plant Establishment Fortnightly Mowing and turf edging to all turf Month 9
to areas. Fertilising, pruning of street trees as
Turf & Planting Areas including podium if applicable required and chemical and physical weed
removal toall garden areas. Rubbish removal as
required
11 |2 RV Ongoing Maintenance after Plant Establishment Fortnightly maintenance as per Specification Months 9 NOOSA COUNCIL
to such as edging to all adjacent turfareas,
Revegetation Areas fertilising, pruning of vegetation as required, GENERALLY IN ACCORDANCE
maintenance of stakes & tree guards, and
chemical and physical weed removal to all OPW1 2/01 1 0.02 1 5 NOV 2021
rehabilitation areas. Rubbish removal as
required to achieve On & Off Maintenance.
11 43 DLP Defects Liability Period - 52 weeks Weeks

 

FRONTAL NAN NAALANICN

AVI

LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTURE

APPROVAL ISSUE

 

 

D OP WORKS 2021-10-11 HQ HQ WA
Cc OP WORKS 2018-02-23 ME ME WA
B DRAFT OP WORKS 2018-02-06 ME ME WA
A PRELIMINARY 2018-01-15 ME ME WA
ISSUE: DETAILS: DATE: DES: DC: QA:

 

 

TN

JFOP

URBANCONSULTANTS

 

 

PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD

 

URBAN DESIGNERS
SURVEYORS.
ENGINEERS

BRISBANE - JFP House
76 Ernest Street,

South Brisbane Qld 4101

P07 3012 0100 W www.jfp.com.au

LANDSCAPE ARCHITECTS _Jfp URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045

 

LIENT: CLIENT NAME HERE PTY LTD

 

COUNTRY CLUB VILLAGES

PROJECT TITLE:

NOOSA DOMAIN
APARTMENTS

WALTER HAY DRIVE,
NOOSAVILLE.

SCALE:

COPYRIGHT © 2017 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.

eA

COVER SHEET
SCHEDULE

PLAN NUMBER: B3730LA1-DA1 LA VM

M1717L_A1

CS02D

 

Log in to download the original (Attachment B - Endorsed Landscape Plan OPW12-0100 02.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.