07/0256 - Representations Received [As Published] · 132007.256
CONICS » Conics (Brisbane) Pty Ltd ACN O10 370 448 Our Ref. 6631 www.conics.com.au Date: 10 September 2008 t +617 3237 8899 f +617 3237 6833 3 @ [email protected] Ate Kerri Coyle " Brisbane Office 743 Ann Street (PO Box 1559) Fortitude Vattey Queensland Australia 4006 Contes the new name for pm Sunshine Coast Regional Council PO Box 141 TEWANTIN QLD 4565 Via: Mail & email (Kerri. [email protected]) Dear Sir, RE: 178 EUMUNDI NOOSA ROAD (Lot 80 on SP211687) COUNCIL REFERENCE: 2007/256 NEGOTIATED DECISION REQUEST We write on behalf of our client, Bunnings Pty Ltd, in relation to the abovementioned development approval (Council Reference 2007/256). In accordance with Section 3.5.17 of the Integrated Planning Act 1997, we request that the following amendments to conditions and the approval be made, and a Negotiated Decision be issued by Council. On 10 July 2008 Council issued a ‘Preliminary Approval for Material Change of Use ~ Bunnings Warehouse’. It is understood that Council issued a ‘Preliminary Approval’ rather than a ‘Development Permit’ due to the need to satisfy further design requirements for the diversion of Gateway Drive (as conditioned) to the Rene Street roundabout. Conditions 24.1 to 24.6 outline the design requirements for external roadworks to be satisfied for a Development Permit to be issued. We attach for Council's assessment the required plans, prepared by BMD Consulting, and request that Council now issue a ‘Development Permit for a Material Change of Use ~ Bunnings Warehouse’ by way of the Negotiated Decision notice. Further, we attach advice from Deacon's Lawyers identifying that the Gateway Drive diversion and upgrade works are not specifically required as a ‘esult of the development proposal. The applicant is prepared to undertake such works to achieve a quality development outcome and assist Council in achieving improvements to the overall road network, however, given the independent review and legal position, we request that these works be offset against any infrastructure charges relating to road infrastructure levied over the subject land. We request this be reflected by an appropriately worded condition. Condition 16 of the preliminary approval requires amendments to. the building design to achieve an alternative roof form. Please find attached revised plans addressing this design issue, achieving: o Removal of the parapet o Provision of 600mm eaves — o Adjustment of the roof pitch to achieve a 5 degree pitch urban growth and infrastructure
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 17 pages
Page 2
In terms of amendments to conditions, we make the following representations: Condition 8 Condition 8 currently reads- / Any advertising sign or device is to comply with Council's policies on advertising. We request that this condition be reworded as below to reflect the signage clearly identified on DA drawings and documented in the original DA documentation. Any advertising sign or device is to be in accordance with the signage shown on the approved development plans. Condition 10 Condition 10 currently reads- All storage areas shall be screened from the street and adjoining properties by landscaping. We request condition 10 be reworded as below to facilitate the use of screening in areas where landscaping is not able to be established. All storage areas shall be screened from the street and adjoining properties by landscaping and / or screening. Condition 14 Condition 11 currently reads- All materials stored outside of the building shall not exceed half the height of the on-site building. We request condition 11 be reworded as below to clarify that the nursery and storage areas of the development are considered part of the building form for material storage. All materials stored outside of the building shall not exceed half the height of the on-site building (the building includes the nursery and receiving canopy areas) Condition 14 Condition 14 currently reads- Secure bicycle racks shall be provided on site to accommodate a minimum of 40 bicycles comprising 5 stainless steel hoops or U rails for customers and 15 U rails or wall parking hooks in a secured area for employees. The proposed bicycle racks shall be identified on the landscaping plans and shall be located to the reasonable satisfaction of Council. We request that condition 14 be reworded as below to achieve an appropriate level of bicycle storage for the proposed development rather than the excessive requirements conditioned. Secure bicycle racks shall be provided on site to accommodate a minimum of 20 bicycles comprising 4 stainless steel hoops or U rails for customers and 10 U rails or wall parking hooks in a secured area for employees. The proposed bicycle racks shall be identified on the landscaping plans and shall be located to the reasonable satisfaction of Council. Page - 2 - a ee 4 a 4 : i
Page 3
Condition 15 Condition 15 currently reads - End of trip facilities shall be provided within the approved building at a minimum of 30 lockers; and 4 showers, with change rooms. We request condition 15 be reworded to provide for 2 shower units, which given staffing numbers and demand is the appropriate number for the development. Further, the arrangements for the amenities for staff incorporate integrated changing areas within the amenities. This has proved to be an acceptable and workable solution for staff in all other operations and is therefore considered reasonable in the circumstances. We request the condition be reworded to — End of trip facilities shall be provided within the approved building at a minimum of 30 lockers; and 2 showers, with appropriate change areas as identified on the approved plans of development. Condition 16 We request that condition 16 be deleted as these design elements have been addressed in the plans attached for Council's approval. Condition 18 Condition 18 is not relevant and is not reasonably required in respect of the development or use of premises as a consequence of the development. Condition 18 is irrelevant as the bond is only required if the use is going to commence before all of the works are completed which is not contemplated in this case. In any event condition 19 necessitates that all requirements of this development approval be effected, prior to the use of the premises. Therefore condition 19 allows the Council to ensure all conditions are satisfied before the use commences because a certificate of classification will not be issued until condition 19 is satisfied. Further, it is not reasonable for condition 18 to impose a cash bond for all conditions when the Integrated Planning Act 1997 (IPA) makes it an offence to contravene a development approval including any condition in the approval under section 4.3.3 of IPA. Consequently there is no need for condition 18 and we request it be deleted. Condition 19 Condition 19 currently reads - The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. We request condition 19 be revised as below as the bond / guarantee requirement set out in condition 18 is » not considered reasonable. The requirements of this development approval are to be effected, prior to the use of the premises Page -3- ee
Page 4
> Conditions 22-24 Conditions 22-24 have been superseded by the attached detailed plans. We request these be replaced with the following condition - The applicant shall upgrade the Rene Street - Eumundi Noosa Road roundabout and modify Gateway Drive in accordance with the approved plans of development. Any works undertaken in this regard shall be offset against the infrastructure charge (Advisory Note 2) for Coastal Major Road Network. Condition 35 We request that condition 35 be deleted as there is no requirement to allocate car parking spaces to staff. Condition 37 Condition 37 currently reads — A new 3.0m wide concrete path shall be constructed along the Eumundi Noosa Road Street frontage of the site and a new 2.0m wide concrete path shall be constructed along the new road and Gateway Drive frontage of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. Given that the 3.0m wide concrete path along Eumundi Noosa Road is identified in Council's infrastructure policies as a trunk pathway, we request that this condition reflect that the construction of such infrastructure be offset against PSP20 - Pathway Trunk Network Contributions. Our suggested wording for the condition is A new 3.0m wide concrete path shall be constructed along the Eumundi Noosa Road Street frontage of the site and a new 2.0m wide concrete path shall be constructed along the new road and Gateway Drive frontage of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. The construction works along Eumundi Noosa Road street frontage is to be offset against contributions made under PSP20 - Pathway Trunk Network Contributions. Condition 41 Condition 41 currently reads - The developer shall provide a safe connection (minimum width 2.5 metres) for pedestrians and cyclists from Eumundi Noosa Road and Gateway Drive into the development site and include any necessary pedestrian refuges or crossings required. The alignment shall ensure that appropriate path design standards can be met and pedestrians and cyclists have safe passage through the car park area to the customer and staff entrances. The intent of this condition is clearly understood, however, given the topography of the site it is not possible to achieve the requirements of the condition in its current form. We have considered the functional requirements and advise the following - ® — Bicycle access to the site is available from the Gateway Drive frontage along the proposed footpath and also by way of the road network. = Pedestrian access to the site is now provided from both street accesses as identified on the attached revised plans. This access has been provided to achieve the best possible access to the front door of the store, working in conjunction with the ‘shared zone’ concepts for car parks Page-4- employed by all Bunnings Warehouse developments.
Page 5
» Given the above, we request that condition 41 be revised to read — The developer shall provide a safe connection for pedestrians and cyclists from Eumundi Noosa Road and Gateway Drive into the development site as shown on the approved plans of development. Condition 46 Condition 46 currently reads — All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no net increase in stormwater runoff from the site. We request that condition 46 be reworded as below — All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no increase in the peak flow discharged from the site. Condition 52 Condition 52 currently reads - To ensure that polluted run-off does not enter Council's stormwater drainage system or the downstream ecosystem, stormwater run-off from the carparking areas and the driveways shall be treated in accordance with an approved Surface Water Management Plan. The Cardno Surface Water Management Plan dated 8 February 2008 shall be amended to reflect the conditions of this approval and the modified layout approved herein. It shall also ensure that there is a requirement for monitoring to be undertaken for a period of three years after the commencement of the use and the results submitted for Council for their records in digital form. The amended plan shall also include a method to effectively remove trash from the stormwater system. Rectification measures for non-compliance with water quality objectives shall be included in the Environmental Management Plan. Condition 52 requires that monitoring be undertaken for a period of three years. While it is possible to complete monitoring with respect to treatment measures with permanent water such as lakes, it is difficult to capture samples and obtain meaningful data when bio-retention systems are used. Firstly, the monitoring regime would necessarily be event based rather than being at intervals. Water quality samples for the pre-treatment case would need to be collected from water ponded in the bioretention systems. As the storage components of the system will provide for the capture of sediment and uptake of nutrients, some level of treatment will have occurred prior to the sample being collected. The water that is filtered through the bio-retention filter will take many hours to drain and then be conveyed via the drainage system to a point where sample collection could occur. Even then, the flow rate is likely to be low, making the collection of post treatment samples a time consuming exercise. It is considered that bio-retention systems are now relatively standard stormwater treatment devices with defined performance levels. It is therefore suggested that a bio-retention system designed in accordance with recognised guidelines such as the Healthy Waterways Water Sensitive Urban Design Technical Design Guidelines for South East Queensland will ensure that an appropriate level of treatment is achieved, The condition also requires that the stormwater plan submitted in support of the application be revised to include a suitable method to remove trash. It can be noted that each bioretention device allows for the storage and infiltration of low flows. The inverts of the field inlets to the drainage system will be set above the bed of each bio-retention system to allow for the drainage of higher flows. Therefore, all litter pgptained in runoff for the small events of interest in a water quality sense will be captured within the bio-
Page 6
» retention systems. This approach is considered optimal as litter that builds up in the bio-retention systems will be obvious and unattractive, prompting cleanup by centre staff. Given the above, we request that condition 52 be reworded to - To ensure that polluted run-off does not enter Council's stormwater drainage system or the downstream ecosystem, stormwater run-off from the carparking areas and the driveways shall be treated in accordance with an approved Surface Water Management Plan. The Cardno Surface Water Management Plan dated 8 February 2008 shall be amended to reflect the conditions of this approval and the modified layout approved herein. The design of treatment measures shall be in accordance with the Healthy Waterways publication Water Sensitive Urban Design Technical Design Guidelines for South East Queensland (2006 or later edition) or other document approved for use by Council. Condition 53 Condition 53 requires that the stormwater management plan be amended to demonstrate that the ecosystem downstream of the site will not be adversely affected by water harvesting and detention. The proposed water harvesting will involve the collection of runoff from roof areas only to reduce the demand for potable water. Runoff from the remainder of the site (car park and open space areas) will be drained to the downstream ecosystem. Overall, it is considered that the development and its proposed water harvesting system will not adversely impact on the downstream ecosystem. Accordingly, it is considered that the condition is not required and we request it be deleted. Condition 62 Condition 62 requires ‘the payment of $10,000 towards bus shelter infrastructure along Eumundi Noosa Road. This contribution is not required by a policy of Council and is therefore not applicable. Accordingly, we request deletion of this contribution amount as set out in condition 62. We trust this information is sufficient for your purposes, however should you require any further details or clarification, please do not hesitate to contact the writer by telephone. Yours faithfully Conics (Brisbane) Pty Ltd SIMON FORSYTH Senior Partner - Planning enc cc M. Toohey ~ Bunnings Page - 6 -
Page 7
ner: MOHOLAS PRNS Fae Nose: BABresnane ~ Lessettng\ JORS\LE-O2UA\CE-249 - Burntngs Warchousg Noosavita\? Dravings - Unt \Operatienal Werks\C8 £24 FUME
PROPOSED IPWEAGQ TYPE ‘B1' BARRIER KERB & CHANNEL
PROPOSED IPWEAQ TYPE “SM3° SEMI-MOUNTABLE KERB
PROPOSED IPWEAQ TYPE ‘SMS' SEMI-MOUNTABLE KERB
PROPOSED IPWEAQ TYPE ‘M6" MOUNTABLE KERS
LINEMARKING NOTES:
1, ALL LINEMARKING & RAISEO RETROREFLECTIVE PAVEMENT MARKING
SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES.
2, ALL SURPLUS PAVEMENT MARKING SHALL BE REMOVED BY
GRINDING OR OTHER APPROVED METHOQ.
3. REFER SCRC STANDARD & MUTCD FOR ACTUAt POSITION OF SIGNS
4%, ALL SETOUT FOR LINEMARKING FROM LIP OF KERB & CHANNEL.
26
SP151406
SPIS1d0E
ws
—_ Se
|
/ at
PROPOSED DEVELOPMENT
LLLLILILILLLT LA
a —__}. SELLE ET LL is
SG
LUA
HLL
HAE EL
NTT
—Ttnnin
:
HALAL
PTT
SP170296
SCALE 1:500 (A1}
1:1000 (A3}
RP150347
910
RPI50347
504
SP108677
EXISTING
OFFICEWORKS
DRIVEWAY.
NOT FO
19
RPISO347
RPISO345
R CONSTRUCTION
7 E ¢ Desir cr Che
BMD Stuctoa! Ensen (@ ome — [am BUNNINGS GROUP LIMITED
fanegers
=| = | eon oma a mae seer atanese® Nembaa| Gretes _/ PS _/ ae BUNNINGS WAREHOUSE NOOSAVILLE
=| nro apemoval. Ta [Pa fopaes NS axsuimns Aperoved By: ii FOR APPROVAL
S|_A | craaaeaL aus un | 2 posnes RPEQNo | eee FUNCTIONAL LAYOUT PLAN Drawing No. Rev
nc ‘Amecdinente by | Area | One | to. ‘Amenchnerts By | Ased | Date | peed cence Sane ean want cess orice [OE mnse { CB-0849-FO1 | C
3 TS DRANG CAXMOT 6 COPED OR REPROOUCED Wy ANY FONDS OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT GRGHALLY AVTEXGED WITHOUT THE WIETTEN PERKS CF BAD CONSULTA PY LTD. ee She Psemteccer es Tian 6750 7060 _ Pa DTIACHS ie] Dumas AAD
Page 8
User: MCHOLAS PRS. §ie Hans: BPrinbane ~ Lorsulting\KOS\CB-OFD0S1CB-1SE9 — Prenings Warehovte Nosszrtte\? Drwviogs - Uirk\Operatienal Werks\EB-C349-FAC
SCALE £1000 {A1) :2000 (A:
ma so 2» 4060
1015 10 a5 ? 4 6
SCALE 4:300 1A1}— 1:200 (A3)
3)
80
1008
cy
<—f ROUNDABOUT HOLD LINE
RL.17.573
EXISTING OFFICEWORKS DRIVEWAY
TP.B4.215
RL13.67
TP.133.006
P.153.004 RL.12.07
Yo
/
{
]
RLA764
TP.173.006
% GRADE -3 8% 1.531%
GRADE DISTANCE 16.224 D 78.789 $98
PARABOLA RADUS abr “th
DATUM RLL.0.000
EXISTING alent elel [cls mall zlelal |<
SURFACE fe} gS] SS) Ba} S| g} S| alsa Sisis] S|?
CUT/FILL { mls
DEPTH | 2s] 8 2 Be] Sig| a] al SIRS] SISIS/ S15
FINISHED ® ad acl | el atl al lelale
CENTRELINERL fj Slel af] Sel Sel 3) 3] Slele] Sjalalel?
PEGGED ; al lel le ala| | al lalg
CHAINAGE | alel al si esl sisi i 8} lls] Sisisjele
HORIZ. CURVE RADIUS = =30R SOR R
ROAD GATEWAY NORTH LONGITUDINAL SECTION
SCALE 1: 1000 [HORIZ)
‘SCALE 1: 100 (VERT)
1
‘ NOT FOR CONSTRUCTION
Piet Date: D/9r7908 #4 TSTAM
Ei 8 Dep us i.
BM Stet! Enaowe om [a BUNNINGS GROUP LIMITED
Project lenagers T
a rife ee ant =A BUNNINGS WAREHOUSE NOOSAVILLE
S| FORAPEROVAL Pa _|weces CONSULTING cay. ie FOR FORMATION
we cre er oar [ie = ns seo ans | GATEWAY DRIVE Sfening Ne Rar
Sy _| Aees | Deve ee eee, Fes ai 89 oes Pe (0 - mee
HES DRAW CADIIT BE COPED OR REPRODINED wy ANY FORH OR USED FO@ ANY OTHER PUGPOSE OTHER THAN THAT OGHALLY TEADED WITHONT THE WaYTTEX PEKXSSON OF BHO CONSULTING PTY t10. re cm pS ae cent 1000 cor ge ABD LONGITUDINAL SECTION CB-0849-SK02 | D
Page 9
= PLOTTED pd DEPT 2388
QURB cre cee curcrestetine » peorases sunsives wanenouse, woose aco sen
( |
AREA ANALYSIS - Bunnings Noosa )
Main Store 4530m2 i
Main Entry 75m2
Warehouse Arca 4605m2
Timber Trade Sales (EXCL. Goods Pick-Up) 411352
Timber Storage Yard na
Trade Area 1135 m2
Outdoor Nursery 1425m2
Bagged Goods Canopy (Nuisery) 390 m2
Nursery Area 1845 m2
Total Retall Aroa 7556 m2 oO)
Goods Pick-Up 3419 m2 %)
Car Parking Provided 282 \ S
1 _
CAR PARKING RATIO 1127 m2 D
\
co)
o.
EXT LEVEL o
Aenean te cn ee ecnee us won peut fegen “9
Land Size « APPROX. FIGURES TBC + ¥
HEAVY VEHICLE ACCESS —— oat - 2.
Faaco ona poaccananapfecanitangscsscetty
Bunnings (m2) 24 700 m2 "e “ Ws IES ANTRY ,
Balance (m2) 49 700 m2 & \
Total Land (Ha) 744 CANOPY \\ ‘
| PEDESTRIAN ACCESSS:
i SQ: Ss
‘ ee ES
y a a
i ee
5 o
5
EXTG LEV
RL 14,0 r oe \ ' |_
4 ‘0 A OUT FUTURE ROUNDABOUT SHOWN
& q 2 “4 i TO BE ACCOMODATED
=. 1 TO FUTURE hehe ate
DA CONDITION! DI
REY “
( & a
CUSTOMER CARPARKING 4, \
226 SPACES AT 1:36
PROPOSED LINK ROAD
PEDESTRIAN PATH
ADJACENT TO
ACCESS DRIVEWAY
Feb dhl Leki
iG TEVEL
exto neve Yo —- en
AL 10.65m \ my
b Ree
OO een . i EXISTING ROAD t
noffen BHOWN DOTTED 4
CO LELZ: D | LED e . @
WAY za os . 4
GATEWAY Rive S
oe 2 REVISED AS PER +
CUSTOMER ENTRYEXTT Em TRAFFIC ENGINEER'S
OELIVERIES EXIT PEDESTRIAN ACCESS Ze DETAIL 4
\ 4
prance ee nectar eee eee tense cane eee rere een mneansen mentees sere aetna mae teeeet nf areca eee a)
APPROXIMATE LOCATION OF A i>
xf GHISYING SITE ENTRY
OF eB egpencs 7
XY ORIVEWAY. Oo
LD
Wide | vende SCALE PROJ. NO. ‘)
a DATE AI : J. NO,
( Hebe a ee — . Aen “ JOHN R. BROGAN & ASSOCIATES Paorgern aun 5 too or
Ba REYEsTON PTY. LIWHTED AVILLE QLD DRG. NO.
pe aiee ARCHITECTS, PLANNERS b COMMERCIAL INTERIOR DESIGNERS [five a | } NOOS. pare + te
E oe oy = EST» 927 37 PITT ST. SYDNEY NSW 2000 <j MAR 06 ‘AMD NO,
Se is LON : (02) 9 224 2BSS FAX! (02) 9 251 A7E
ee eet [email protected]. 93 003 284 759 foe ' jbanyd0bigp20d.com.ou sive PLAN J
\
j Vi _
Page 10
+ peotrgp ga see raed
PROPOSED BUNMINGS MAREHDUSE, NODS GLO teDe
1
UGG cea eee caeeeen
© © © ®
T
§
sega VeNSLE at088 oe Sy
— 7 oe
sere BAA AM A_DLA_LALAL A ABABA ALAA AAAS KE
RECENWING
oe | _ bi
CANOPY
m7
(oe
Qa
1 2 4 : :
H a BULKY GOODS
yeayyencts aoe puss goe
4 SALES RRS Sa?
AMENITIES.
PLAYGROUND-
ede ~
a AZT eS |: jae > kyo] f pot de / KT |: Pe
iF rh } PEPYS ORE Bo ee lvbed lin, 3
PA PV Ss
‘= . Hi
~\
PROPOSED BUNNINGS WAREHOUSE SCALE! PROJ. NO.
4 JOHN R. BROGAN & ASSOCIATES EUMUNDI NOOSA ROAD 45260 1096
AUBIN GS 6 ARCHITECTS, PLANNE! NOOSAVILLE QLD pate « DRG, NO.
EST S27 400
( AMD NO.
1 A.B.K. 93 003 284 753 2 ‘au GROUND FLOOR PLAN c J
|
4
Page 11
~ PkorreD ca ae? reed
slotline ¢ *ROPOSEC BUMMINGS RARENOUSE, NODSA GLO 1008
TIMBER TRADE {Sinem ned
SALES VOID WAREHOUSE VOID ‘sins
we a to 1 mye a ue
Lib ley Soo kod wood Keno ool a 8 vo OT oath O98
. 8%
~\
NO. NO. AMENDMENT DATE E SCAE: PROJ. HO,
x er) fo JOHN R. BROGAN & ASSOCIATES aerate eral seo Tope
PTY. LIMITED .
- |UNINIINGS 6 ARCHITECTS, PLANNERS & ERCIAL INTERIOR DESIGNERS i NOOSAVILLE QLO ate : ORG. NO.
a :
ay ise eponci 5 4 .
1 diate eponcies aaa. 98 003 284 758 Br (020 @ 220-2033, mat MEZZANINE FLOOR PLAN 2
| —_
Page 12
_
+ PLOTTED 0) Ser rene
CURD cro cer sntesesteties s oneraves sumarnos wanenouse, wooss axa a4
“«
f
oo ee a nae SRO DR RD ~
RY SIP RN OR OETA 2 APY a
eR Awe &
ACCES WA)
oa issue
NOT FOR CONSTRUCTIO
1
(TNo. ‘AMENOMENT DATE] NO. AMENDMENT DATE SCALE + PROW. wo.)
i a venser Tae — sia CS) JOHN R, BROGAN & ASSOCIATES PROPOSED BUNNINGS WAREHOUSE ent os He
TMS uonniok pies aa An Pty, LuMITED EUMUNDI 1:260
er C7) i. IS GS ARCHITECTS, PLANNERS & COMMERCIAL WTERIGR DESIGHERS f NOOSAVILLE QLD oat « ORG. RO.
EST - 1927 37 PITT ST. SYOWEY NSW 2000 MAR 06 ie
o : : 14 .
\ ove AB.K.93 003 264 759 SOR) § 221 2808 av attigoona como ROOF PLAN c
1
. i
i ; se
Page 13
EV@UHO! Koes Raed eouce snurter OUTDONE WURsERY, LANDGCAPE ‘snane SAIL EHSTING GROUND Riou torren | | WOOeA ROAD LANDACAPE AVY VEHICLE ZN To VASE SERVICE ROAD ee ee ALA SAS FE TT == ——— GR SECTION A R anuey uct: Seecee inn eaves METsL CoUVEE (WPL Werke Yaece wale eoun ak auteR. metswing WAL saute wouter paitte NOT FOR CONSTRUCTION ¢ ~ NO. AMENDMENT. DATE NO. NOMENT A Ds ISSUE. TB, TRADE. ae - BATE SEES a aoe Ee BUR * ir ©§ ake EST - 1927 ABM, 93 003 286 759 PROPOSED BUNNINGS WAREHOUSE JOHN R. BROGAN & ASSOCIATES EUMUNDI NOOSA ROAD Pry. LIMITED ARCHITECTS, PLANNERS & COMMERCIAL INTERIOR OLSIGWERS NOOSAVILLE QLD 37 PITT ST. SYONEY NSW 2000 PH: (02) § 221 2833 FAX: (02) @ 251 474) Ewa: Jrbasyetbigpond.com.au SECTIONS 1 o¢ ——e
Page 14
Cc
.
POYONOIOIIYIIIIY®TIY® IIOP
a
>
au
Wuesear
cuaTowes PARKING
tawosdare Gateway DRIVE
eau
OATEWAY DRIVE jauaatare
Ger a2
@ SECTION O
| PLOTTED cH SEP DEE
ENON
ROOF RIDGE
v
=
=
__
BF NN
It} bxe > s25 ere
@ > SECTION C
(Tro. AMERDUENT pate Two. AMENOWENT. DATE f
= = — > JOHN R. BROGAN & ASSOCIATES PROPOSED SUNNINGS WAREHOUSE SCALE: prov. NO.)
= 2) NININGS pry. uisiteD Los EUMUNDI NOOSA ROAD 1:250 1096
KS ARCHITECTS, PLANNERS & COMMERCIAL INTERIOR DESICHERS [fant sects | NOOSAVILLE QLD RG. NO.
Buc Vaal DATE =
EST - 27 424
}
T ST, SYDNEY RSW 20
en) SECTIONS MAR 06 AD NO.
: e J
AB.K. 93 003 264 759
Page 15
+ PLOTTED ca SEP zeGH
NOY WAREMOUSE, KOUSA GLO 1098
J enarcsED SuRNT
CUSTOMER ENTRYIEXI
® SOUTH ELEVATION
c
ANDECAPE
& SOUTH ELEVATION
LYNN OOOO OOOO YOON
EUMUNDI NDOBA [oe
EAST ELEVATION
Eaves uttth—=——
+ 3a HOH
Babe Wate
ale
A.B.N, 93 003 286
JOHN R. BROGAN & ASSOCIATES
789
PROPOSED BUNNINGS WAREHOUSE
EUMUNDI NOOSA ROAD
NOOSAVILLE QLD
ELEVATIONS MAR 06 NID NO.
|
Page 16
= PLOTTED pa SEP rete
‘i
@ SOUTH ELEVATION
e howvar
NORTH ELEVATION
& 1 =
a EAST ELEVATION
WEST ELEVATION
Sen et.
unnines
nivce careme
FINISHES LEGEND
@) eunanas oREEN
& WHITE
(3) stucco
wOsCare
NOT FOR CONSTRUCTION
Pee
'
i
i
NO. AMENDMENT AMENDMENT. DATE PROJ. No.
eee eevreran | ee) JOHN R. BROGAN & ASSOCIATES PROPOSED BUNNINGS WAREHOUSE vege
cos consiniows 6) PTY. LiMiTED EUMUNDI NOOSA ROAD
4 2) ARCHITECTS, PLAXNERS & COMMERCIAL INTERIOR DESIGNERS NOOSAVILLE QLD DRG. NO.
4 EST - 927 37 PITT ST. SyONEY Nsw 2000 wt
ny diacrepencies , : 1 .
\ = any Gases ABN. 93 003 284 759 Eun 2247833 ey gebigoend.com.ou COLOURED ELEVATIONS c J
—____-4
Page 17
4
{ » Deacons is Baste Street
BRISBANE QLD 4000
AUSTRALIA
GPO Box 407
Brisbane Qld 4001
DX114 Brisbane
Tel +61 (0)? 3309 0888
Fax + 61 (0)7 3309 0999
www.deacons.com.au
_ Other Offices
Canberra
8 September 2008 Melbourne
Perth
Sydne
Email: [email protected] yaney
[email protected] ; . Independent
Affiliated Firms
Hong Kong
, : . . ‘Indonesia
Matt Toohey / Malaysia .
Bunnings : . People's Republic of
11 Shirley Street Sirocpore
ROSEHILL NSW 2142 Taiwan
. Thalland .
Vietnam
Our Ref: ~~ 2607106
‘Dear Matt
Development Approval for Bunnings Development - Noosaville — Gateway Drive
Diversion Requirement
1. We refer to your request for advice on whether the requirement to provide the
Gateway Drive diversion is a lawful requirement.
2. We have reviewed the decision notice dated 14 July 2008 for Bunnings’ ;
development at 178 Eumundi Noosa Road and we have.discussed the Council's
conditions with Neil Viney of Viney Traffic Engineering.
3. The Council's decision notice includes the following conditions:
(1) conditions 22 to 25 which require an upgrade of Gateway Drive so as to
divert it through Bunnings’ site to interséct with Eumundi-Noosa Road at
the Rene Street roundabout. This requirement differs from the road
design proposed in Bunnings’ development application. .
(2) point 2 of the Advisory Notes which advises that an infrastructure charges
notice will be issued for $1,087,848 (subject to variances in CPI)-in
accordance with the Coastal Major Road Network Infrastructure Charges
Plan. no :
4, Section 3.5.30 of the integrated Planning Act 1997 (IPA) requires that a condition
must be relevant to, but not an unreasonable imposition on, a development or it
must be reasonably required in respect of the development.
2607106/2493345_2
Page 18
Deacons . Page 2 "10. 08/09/2008 On the basis of our discussions with Neil Viney, it is our view that conditions 22 to 25 do not meet the lawful condition test under section 3.5.30 of IPA for the reasons below. In Neil Viney's opinion the diversion and intersection design required by the Council is not necessary for the Bunnings development from a traffic perspective. This view is also supported by the agreement reached between Colin Beard (engaged by the Council) and Glen Holdsworth (engaged by Bunnings) in PMM Group Pty Ltd v Noosa Shire Council [2005] QPEC 079. That agreement was that the traffic arrangements in the agreed plan were acceptable. The agreed plan showed an intersection design in the same terms as the plan submitted by Bunnings with its development application (i.e. without the upgraded diversion and intersection design). The Bunnings proposal in that appeal was also considerably larger and likely to generate more traffic than the current approved proposal. Therefore the Bunnings development does not generate traffic at a'leve! that would cause a need for the diversion and intersection upgrade. Instead from a traffic perspective, the upgrade is required for broader traffic planning reasons, unrelated to the Bunnings development. - The requirement for Bunnings to construct the upgrade is in effect a requirement that Bunnings bear the costs of providing a traffic solution to a problem it did not create and that is of benefit to the general public. For the reasons above we advise that in their current form conditions 22 and 25 are uniawful. However it may be possible to make conditions 22 to 25 acceptable to Bunnings if the costs of carrying out the works required under the upgrade conditions is reimbursed to Bunnings. This could be done by way of an offset against transport infrastructure contributions. . Yours faithfully Michael Leong Partner Deacons Contact: Tim Stork Direct line: +61 (0)7 3309 0226 Email: [email protected] 2607106/2493345_2
Used in these records
07/0256 - Representations Received [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.