Deacons . Page 2

"10.

08/09/2008

On the basis of our discussions with Neil Viney, it is our view that conditions 22 to
25 do not meet the lawful condition test under section 3.5.30 of IPA for the
reasons below.

In Neil Viney's opinion the diversion and intersection design required by the
Council is not necessary for the Bunnings development from a traffic perspective.
This view is also supported by the agreement reached between Colin Beard
(engaged by the Council) and Glen Holdsworth (engaged by Bunnings) in PMM
Group Pty Ltd v Noosa Shire Council [2005] QPEC 079. That agreement was
that the traffic arrangements in the agreed plan were acceptable. The agreed
plan showed an intersection design in the same terms as the plan submitted by
Bunnings with its development application (i.e. without the upgraded diversion
and intersection design). The Bunnings proposal in that appeal was also
considerably larger and likely to generate more traffic than the current approved
proposal.

Therefore the Bunnings development does not generate traffic at a'leve! that
would cause a need for the diversion and intersection upgrade. Instead from a
traffic perspective, the upgrade is required for broader traffic planning reasons,
unrelated to the Bunnings development.

- The requirement for Bunnings to construct the upgrade is in effect a requirement

that Bunnings bear the costs of providing a traffic solution to a problem it did not
create and that is of benefit to the general public.

For the reasons above we advise that in their current form conditions 22 and 25
are uniawful.

However it may be possible to make conditions 22 to 25 acceptable to Bunnings
if the costs of carrying out the works required under the upgrade conditions is
reimbursed to Bunnings. This could be done by way of an offset against
transport infrastructure contributions. .

Yours faithfully

Michael Leong

Partner

Deacons
Contact: Tim Stork
Direct line: +61 (0)7 3309 0226

Email:

[email protected]

2607106/2493345_2

 

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0256 - Representations Received [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.