Original source · versioned page text
JOHN COCHRANE · Report
ORDINARY MEETING 19 DECEMBER 2024 8.2 JOHN COCHRANE QUESTION 1 What is the definition of a "Structure" used in determining Site Cover under the Noosa Plan 2020? How is this definition derived and what guidelines are used to ensure consistency in the application of term? QUESTION 2. Can you describe how waste management will be carried out in the Noosa Springs Hotel MCU21- 0110? Specifically: 1. Where are bins to be located and what size are they? 2. How is waste transported to the bins? 3. How is noise associated with waste transfer mitigated? 4. Is a glass crusher proposed? 5. Where do garbage trucks access the bins?
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original