1. INTRODUCTION
As requested, Tectonic has undertaken a slope stability assessment for a proposed redevelopment of the
backpackers at 16 Duke Street, Sunshine Beach. This report presents the results of our slope stability
assessment, together with geotechnical advice for the project. In summary, subject to the
implementation of the recommendations made herein, it is assessed that there would be an acceptably
Very Low Risk of slope instability affecting the proposed development in accordance with the Australian
Geomechanics Society Guidelines for Landslide Risk Management, dated March 2007 (AGS 2007).
1.1 Details of the Site and Development
The site is formally described as Lot 3 on SP228958, covers an area of 842 m2, and has frontage to Duke
Street and Douglas Street along the south-western and south-eastern boundaries, respectively. At the
time of our assessment an existing two-storey dwelling and pool occupied most of the site. A detailed
description of the site is given in Section 2.
Subject site
Text Figure 1: Recent aerial image of the site and surrounds (courtesy of Nearmap)
Tectonic Geotechnical Pty Ltd
A.B.N. 83 165 727 828
PO Box 899, Buderim, QLD 4556 E [email protected]
P (07) 5478 9016
W tectonicgeo.com.au 1 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 17 pages
Page 2
Concept architectural drawings supplied to Tectonic (Ref. Andrew Bock Architecture [ABA], Project No.
2425-004, Dwg Nos. CD-A01 to CD-D02 [exclusive], Rev. A, dated April 2025) indicate that the
development will comprise demolition of the existing residence/pool and construction of a new two-
storey structure, which will accommodate up to 48 persons. Construction is anticipated to comprise a
combination of reinforced concrete slabs and rendered blockwork walls.
Although no earthworks drawings were available, based on the provided sections, cut and fill in the order
of up to 1 m depth/height is anticipated. Deeper excavations may be required for underground footings
and service trenches.
A site layout plan and concept images are shown in Text Figure 2 below.
Text Figure 2: Proposed site layout plan (LHS), and concept images (RHS), courtesy of ABA
1.2 Method and Scope of Investigation
As part of our slope stability assessment, a desk-top study was carried out comprising a review of
published geological maps and Noosa Council (NC) overlays.
A walk-over survey was conducted in order to make an appraisal of the general condition of the site in
regard to topography, drainage, vegetation cover, geology, erosion, and condition of existing structures.
The walk-over survey was carried out by an experienced engineering geologist from Tectonic on
9 October 2025.
The results of our desk-top study and walk-over survey are included in Section 2 below.
1.3 Qualifications of Responsible Engineer
This report has been reviewed by Geoff Hurley, an RPEQ with more than 40 years’ of experience in
geotechnical engineering, including numerous slope stability projects.
21 October 2025
25317-001-Rev0 2 of 13
Page 3
2. DESCRIPTION OF EXISTING CONDITIONS
2.1 Geology
Available geological information 1 indicates that the site is underlain by Pleistocene age blowout sand
dunes comprising “quartz sand” (Ref. Text Figure 3).
Approx. Site Location
Text Figure 3: Extract from Laguna Bay Surface Geology Map
2.2 Topography
During the site walk-over, topographic features specific to the site were noted, and ground slopes were
recorded using a hand-held clinometer. As illustrated in Text Figure 4 below, the site is located on the
gently sloping, south-westerly facing flank of an ancient sand dune.
Locally, the site had been altered by previous cut and fill earthworks during residential construction.
Based on a visual appraisal it appeared that cut and fill earthworks up to about 1 m depth/height had
been undertaken across the site, most of which were supported by timber or blockwork retaining walls.
Inferred natural gradients across the site were <5°.
Subject site
Text Figure 4: Ground surface contours, 1 m spacing (courtesy NC interactive mapping)
1
1:100,000 Laguna Bay Surface Geology, Sheet 9545, Compilation Map, DNRME, 2018
21 October 2025
25317-001-Rev0 3 of 13
Page 4
Site conditions observed at the time of our walk-over are shown in Text Figures 5 and 6.
Text Figure 5: North-easterly view of the site, taken from Duke Street
Text Figure 6: Westerly view of the site
21 October 2025
25317-001-Rev0 4 of 13
Page 5
2.3 Groundwater
No signs of groundwater seepage at the surface (‘springs’) were observed during our walk-over.
2.4 Surface Drainage
Surface drainage would be expected to follow the ground surface gradients to the west. However, run-
off would be minimal due to the expected sandy nature of the soils as rainfall would normally be
anticipated to infiltrate the ground surface. Nevertheless, as the development will occupy a large part of
the block, significant run-off from hard surfaces will occur. Where directed into swales rather than pipes,
such run-off would be expected to infiltrate into the natural sands relatively rapidly.
2.5 Vegetation
The ground coverage around the site generally comprised garden beds, with some small to medium
sized trees near the boundaries. None of the trees showed signs of twisting or leaning, which can
sometimes be attributed to slope stability issues.
2.6 Buildings and Other Structures
The existing residence comprised a two-storey, slab on ground structure. An inground pool was situated
to south-east of the existing residence, which was surrounded by concrete. A concrete driveway was
present off Duke Street. Some hairline cracking was observed in part of the concrete adjacent to the
pool. The observed distress appeared to be related to age and possibly settlement of the upper loose
sands rather than global slope instability.
As mentioned previously, previous earthworks were supported by timber and masonry blockwork
retaining walls <1 m high. The walls appeared in relatively good condition for their age, showing no signs
of distress that could be attributed to slope instability.
Text Figure 7: Cracking in concrete (LHS) and exisintg timber retaining wall (RHS)
21 October 2025
25317-001-Rev0 5 of 13
Page 6
3. ASSESSMENT OF LAND STABILITY
3.1 Existing Conditions
The NC Planning Scheme 2020 includes a landslide hazard overlay map (Ref. extract in Text Figure 8),
which indicates that the site has a Very Low/Low landslide hazard (no shading) to Moderate landslide
hazard.
Subject site
Text Figure 8: Extract from NC landslide hazard overlay mapping
It should be noted that the NC landslide hazard map is a broad-scale indication of the potential landslide
susceptibility and is superseded by this site-specific assessment. No visual signs of global slope
instability were observed across the allotment. No landslide back scarps, groundwater springs, or areas
of naturally ‘hummocky’ ground were observed.
21 October 2025
25317-001-Rev0 6 of 13
Page 7
3.2 Stability Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 1 and the
Qualitative Terminology for Use in Assessing Risk to Property is also attached.
Table 1: Stability Risk Levels
Risk Level Example Implications(1)
VH Very High Unacceptable without treatment. Extensive detailed investigation and research, planning and
Risk implementation of treatment options essential to reduce risk to Low; may be too expensive and not
practical. Work likely to cost more than value of property.
H High Risk Unacceptable without treatment. Detailed investigation, planning and implementation of treatment
options required to reduce risk to Low. Work would cost a substantial sum in relation to the value of
the property.
M Moderate May be tolerated in certain circumstances (subject to regulators’ approval) but requires investigation,
Risk planning and implementation of treatment options to reduce risk to Low. Treatment options to reduce
to Low risk should be implemented as soon as practicable.
L Low Risk Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level,
ongoing maintenance required.
VL Very Low Acceptable. Manage by normal slope maintenance procedures.
Risk
Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend
on the nature of the property at risk; these are only given as a general guide.
Given the geology and topography of this site, it is rare that a landslide could affect the proposed
residence. Sand dune slopes are generally close to the ‘limit of equilibrium’ for slope stability where the
surface gradient is about 30° (58%), although often lower (26˚ to 28˚) for very loose sands. Our
measurements indicate that natural gradients ranged up to about 5°. The limit of equilibrium is the
‘tipping point’ to instability, where the factor of safety (FOS) of the slope is approximately 1.0. The FOS
of a slope is the balance (ratio) between the forces driving instability (e.g. soil weight, groundwater
pressure) and the resisting forces (e.g. soil friction and cohesion).
Sand dune slopes generally remain stable (i.e. FOS greater than 1.0) when they are:
well vegetated (mix of ground cover, shrubs and small trees);
not subjected to concentrated stormwater flows;
not surcharged with additional loads (e.g. fill); and
not undercut by excavation or erosion.
Direct discharge of stormwater onto dune slopes may cause channel erosion, undermining and
disturbance of vegetation, and development of generally localised instability.
Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
recommendations given below, it is assessed that there would be a Very Low (VL) Risk of global slope
instability affecting the proposed development. Regulators (NC) normally require that a Very Low or Low
Risk of landslide affecting the property must be demonstrated to enable development approval.
Summarised in Table 2 overleaf is our qualitative assessment of landslide risk for the development site. A
summary of qualitative terminology for use in assessing risk to property is attached (taken from AGS
2007).
21 October 2025
25317-001-Rev0 7 of 13
Page 8
It should be noted that this risk assessment excludes geotechnical risk that may be associated with
settlement due to consolidation of uncontrolled fill materials or loose sands over time which could affect
non-piled structures (e.g. pavements, landscaping structures).
Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007)
Hazard Likelihood Consequence Assessed Risk Comments
Given the gentle natural gradients
through the site, it is considered Rare
that a landslide would develop in
Failure through very loose
these materials, subject to
to loose natural sands
Rare Minor Very Low implementation of the
above the foundation
recommendations in Section 4. For a
depth
potential Minor impact from such
instability the resultant risk would be
Very Low as per AGS 2007.
The likelihood of a deep failure
through the medium dense (or
denser) natural sand below the
proposed foundation depth is
Deep failure through the assessed as Barely Credible due to
medium dense Barely the lack of precedence of such
Major Very Low
(or denser) sands below Credible movements locally, no signs of
the foundation depth existing deep-seated instability and
gently sloped conditions. Although
the consequence of such a failure
could be Major, the resultant risk is
Very Low as per AGS 2007.
The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.
21 October 2025
25317-001-Rev0 8 of 13
Page 9
4. RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached.
4.1 Site Layout and Development Limitations
Should any revisions be made to the proposed extent of the development, as described in Section 1.1,
Tectonic must review these revisions prior to construction to assess if there are any impacts on slope
stability. To achieve a Low Risk of instability, the following is recommended:
All footings must found below the zone of influence of the existing structures and infrastructure
(including retaining walls).
All retaining walls exceeding 1 m high and/or subject to surcharge loads must be engineer designed
and certified by an RPEQ. The design must include an assessment of global and internal stability.
Design and construction of footings shall be undertaken in accordance with Section 4.3.
Formal drainage should be constructed to ensure all stormwater is directed away from the proposed
structures.
4.2 Earthworks
No earthworks details were available at the time of reporting; however, provided preliminary
architectural plans indicate that bulk excavations are not likely to exceed 1 m depth/height to form
finished levels. Deeper excavations may be required for underground footings and service trenches.
Should proposed cuts/fills exceed these quantities, Tectonic must assess the impacts on slope stability
prior to construction.
4.2.1 Site Preparation and Trafficability
Following removal of the existing structures, any relict construction elements, vegetation, tree stumps
and large roots should be stripped and ‘grubbed out’. Any organic rich topsoil should also be stripped
and removed from site. Organic topsoils and garden soils must not be re-used as structural fill; however,
small volumes may be retained on site for later use across landscaping areas, if required.
The natural subgrade following stripping will likely be in a loose condition. Should slab on ground
construction be proposed (e.g. concrete pathways) the ground surface should be compacted by several
passes of a vibrating plate compactor or small smooth drum roller (or similar) in conjunction with the
surface application of ample water.
Care must be taken with the use of any vibratory equipment to ensure that there are no adverse impacts
on surrounding structures and underground services (e.g. existing NC infrastructure along the site
boundaries). The impacts from ground vibration must be closely monitored and managed during
construction. Where significant vibrations are possible, it would be prudent to conduct a dilapidation
survey of neighbouring structures prior to commencement of construction.
4.2.2 Filling
The inferred sandy soils, where free of deleterious materials (e.g. building waste, organics etc.), may be
reused as structural fill, subject to appropriate moisture adjustment. Due to the possible presence of
deleterious materials in the upper soil profile from future demolition, a ‘skeleton bucket’ (or similar) may
be required to remove these materials prior to reuse.
21 October 2025
25317-001-Rev0 9 of 13
Page 10
It should be noted that compaction of such sands as structural fill requires the addition of substantial volumes of water (‘flooding’) combined with the use of vibratory compaction equipment (typically a minimum 4 tonne vibrating smooth drum roller or vibrating plate) to achieve required compaction. Should importation of fill be required, it is recommended that such fill should comply with the following: Minimum CBR of 10% Maximum plasticity index of 15% Shrink-swell index ≤ 1% Maximum particle size of 100 mm Any fill should be compacted at moisture contents within the range of ±2% of optimum moisture content for Standard Compaction. Select fill should have a maximum particle size of 100 mm for an uncompacted layer thickness of 200 mm and shall be compacted by repeated rolling with a small compactor to achieve a dry density ratio of at least 95% of the Standard Maximum Dry Density for cohesive soils, or 70% Dry Density Index for any imported cohesionless soils. Confirmatory compaction testing should be carried out at regular intervals. A minimum of two tests per vertical lift is recommended where structural fill heights are to exceed 300 mm. Further details for control and testing of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for Commercial and Residential Developments. Fill embankment edges must be over-filled by 0.5 the width of the compaction equipment (horizontally) and then trimmed back to well compacted material. 4.2.3 Excavations Excavations through loose to medium dense sand should be achievable using conventional earthmoving plant (e.g. small or larger excavators with toothed buckets). Temporary, unsurcharged cuts could be formed at 1V:2H in the loose sand, and at 1V:1.5H in medium dense (or denser) sand, for batters up to 3 m in height (where room permits). Flatter batters or temporary retention would be required if groundwater seepage is encountered or if sloughing of dry sand occurs at the batter surface. Deeper unretained cuts, if required, should be specifically assessed by Tectonic, unless supported by temporary retention measures. Unless assessed and approved by a geotechnical RPEQ, all permanent cuts and fills must be retained. If the above temporary batter slopes cannot be achieved due to spatial restraints, temporary shoring will be required (e.g. sheet piles, contiguous piles etc.). Excavations in close proximity to existing structures/infrastructure will need to be specifically designed to prevent undermining. If undermining is a potential issue, the existing structures may need to be underpinned or the excavation may require temporary shoring. The advice of a suitably qualified and experienced structural RPEQ must be sought regarding any potential undermining and design and construction of any underpins/temporary shoring (if required). The above recommendations do not supersede any existing safety regulations or legislation applicable to excavations (e.g. limits on personnel entry into trenches). Due to the highly permeable nature of the sands at this site, stormwater is expected to rapidly infiltrate the ground making un-sealed surface drainage ineffective for the control of flows. Any sealed areas should be graded to ensure free drainage of stormwater away from construction areas to a control point(s). 21 October 2025 25317-001-Rev0 10 of 13
Page 11
4.3 Footings No design loadings were available at the time of reporting. Footings for the proposed buildings and any ancillary structures (e.g. retaining walls etc.) must penetrate through any fill materials and unsuitable natural soils (i.e. very loose to loose sands) to found at least 0.5 m into medium dense (or denser) sands. Based on our experience with similar sites in the area, the depth to medium dense (or denser) sands may be up to about 2 m BGL (existing). A geotechnical investigation is recommended to confirm the preliminary advice provided below. Piled footings may be required unless excavations expose medium dense sands at or near foundation subgrade level (e.g. in deeper excavation areas). Piles so founded may be designed using an allowable end bearing pressure (ABP) of 300 kPa. High-level footings may be possible in areas if medium dense (or denser) sands are exposed at or near the subgrade. This would be subject to an assessment by a suitably qualified and experienced geotechnical RPEQ during construction. High-level footings, so founded, could be designed using an ABP of 100 kPa. Footing design should also account for potential soil reactivity. Given the sandy soil profile and depths of footings required, steel screw piles are an appropriate footing type for the proposed development generally. However, in areas of cut exposing medium dense (or denser) sands at the subgrade level high-level footings may be adopted. It should be noted that excavations for concrete strip footings (or similar) may loosen the base. Therefore, the use of a vibrating plate would be required to densify any high-level footing bases prior to the placement of reinforcing steel. Due to the likely presence of loose sands, together with the close proximity to surrounding infrastructure, open bored piers or driven piles are not considered to be appropriate for this site. Steel reinforced concrete bored piles could be feasible; however, the use of sacrificial liners (e.g. ‘formatube’) would be required to prevent the caving of upper loose sands. The advice of a specialist piling contractor must be sought regarding feasibility, design and installation of the piling system for this site, including an assessment of potential vibration effects on nearby structures, and monitoring requirements. If steel screw piles are adopted, it will be important to ensure close supervision of installation, as piling may not encounter sufficient drilling resistance (from torque measurement) in sands at the suggested founding depth and piles could extend to much greater depth than necessary. It is therefore recommended that site-specific static load testing be conducted from screw piles, if adopted, at a minimum. Where tension or compression capacity developed in the footings is critical for the future structure (e.g. resistance to uplift forces from high winds), then cyclic load tests (including measurement of deflections under tension and compression cycles) should also be undertaken prior to construction. Kentledge for static testing, or simulated cyclic loads, should prove the piles to a minimum of two times the expected working load within tolerable deflections. All footings should found such that they are not adversely affected by (or affect) any adjacent excavations, trenches or retaining walls that are not designed to support building loads. Footings should found at least below a plane extending 1 m horizontally from the base of trenches/excavations/retaining walls, then rising up at 1V:1H, as illustrated in Text Figure 9 overleaf. Where footings are located within a horizontal distance of 1.5H (H being the batter height) of any cut or fill batter crest, these footings must be founded at a depth level with the toe of the batter. 21 October 2025 25317-001-Rev0 11 of 13
Page 12
Text Figure 9: Zone of influence diagrams – footings to be founded below these lines
Site drainage should be designed to readily remove surface water and to prevent ponding of water on
subgrade areas during construction and also adjacent to foundations and perimeter slabs once
construction is completed.
If bored piles are adopted, it is recommended that footings be inspected by an RPEQ prior to placement
of steel reinforcement and pouring of concrete to confirm allowable bearing pressures and cleanliness of
excavations.
If any soil conditions encountered during construction are found to differ from those discussed in this
report, Tectonic should be notified immediately, and an inspection carried out to determine if changes to
footing design are required.
4.4 Retaining Structures
Retaining structures must be founded as per the recommendations in Section 4.3 above. Retaining
structures greater than 1 m high, or those required to support surcharge loads or sloping backfill, will
require engineer design and certification of construction. Retaining wall design should be carried out in
accordance with AS4678-2002 Earth retaining structures.
The parameters outlined in Table 3 may be adopted for retaining wall design. The values in Table 3
assume that the walls are fully drained, and no allowance is included for hydrostatic pressures,
construction loading, up-slope footing loadings, the effects of sloping ground and backfill compaction
stresses. Any temporary shoring required to support excavations during construction may also be
designed using the parameters in Table 3.
Table 3: Retaining Structure Design Parameters
Lateral earth pressure coefficients
Unit weight Friction angle Ø Ka Ko Kp
Retained material
(kN/m3) (°) (Cantilever wall) (Non-yielding
wall)
Loose Sands 17 28 0.36 0.53 2.77
Medium Dense 18 33 0.29 0.46 3.39
(or Denser) Sands
Future Fill * * * * *
Note: * depends on fill material type and level of compaction
21 October 2025
25317-001-Rev0 12 of 13
Page 13
At a minimum, retaining structures must be founded as per the recommendations in Section 4.3 above with the footings also designed to account for lateral loads imposed by the retaining wall. Detailed design must include an assessment of internal and global stability, together with required bearing capacity and founding depth, by the retaining wall design engineer. 4.5 Drainage Adequate site drainage must be installed to ensure that stormwater runoff is directed away from buildings, walls and footings. Although unlikely, if groundwater seepage is encountered during excavations, Tectonic must be notified to assess the impact on stability. All collected stormwater must be directed by pipes or lined channels into the existing stormwater system along Duke Street. Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in filter ‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and site-specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to be accounted for in the design of the retaining structure. Subsurface disposal of stormwater, such as by an infiltration pit, must not be undertaken. 5. CONCLUSION It is assessed that there would be a Very Low Risk to the proposed residence from slope instability subject to implementation of the recommendations given in this report. 6. LIMITATIONS This assessment relates only to the proposed works described within this report. Your attention is drawn to the document Limitations, which is attached to this letter report. Please contact the undersigned should you wish to discuss any of the above matters. Yours faithfully, Tectonic Geotechnical Pty Ltd Oliver De Silva BAppSc PMEG Geoff Hurley BSc (Hons) MSc DIC C.Geol RPEQ 5716 Engineering Geologist Senior Consultant Attachments: A. Qualitative Terminology for Use in Assessing Risk to Property B. Some Guidelines for Hillside Construction C. Limitations 21 October 2025 25317-001-Rev0 13 of 13
Page 14
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: LANDSLIDE RISK ASSESSMENT
QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY
QUALITATIVE MEASURES OF LIKELIHOOD
Approximate Annual Probability
Implied Indicative Landslide
Description Descriptor Level
Indicative Notional Recurrence Interval
Value Boundary
10-1 5x10-2
10 years The event is expected to occur over the design life. ALMOST CERTAIN A
20 years The event will probably occur under adverse conditions over the
-2
10 100 years
design life.
LIKELY B
-3
-3 5x10 200 years
10 1000 years The event could occur under adverse conditions over the design life. POSSIBLE C
5x10-4 2000 years
The event might occur under very adverse circumstances over the
10-4 10,000 years
design life.
UNLIKELY D
-5 5x10-5 20,000 years
10 The event is conceivable but only under exceptional circumstances
100,000 years RARE E
over the design life.
-6 5x10-6 200,000 years
10 1,000,000 years The event is inconceivable or fanciful over the design life. BARELY CREDIBLE F
Note: (1) The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.
QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY
Approximate Cost of Damage
Description Descriptor Level
Indicative Notional
Value Boundary
Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
200% CATASTROPHIC 1
stabilisation. Could cause at least one adjacent property major consequence damage.
100%
Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
60% MAJOR 2
stabilisation works. Could cause at least one adjacent property medium consequence damage.
40%
Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
20% MEDIUM 3
Could cause at least one adjacent property minor consequence damage.
10%
5% 1% Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works. MINOR 4
Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
0.5% INSIGNIFICANT 5
notional boundary of 0.1%. See Risk Matrix.)
Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
unaffected structures.
(3) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
(4) The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa
Australian Geomechanics Vol 42 No 1 March 2007
68039 Landslide Risk Management Issued 10/7/07
Page 15
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)
QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
LIKELIHOOD CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
Indicative Value of 1: CATASTROPHIC 2: MAJOR 3: MEDIUM 4: MINOR 5:
Approximate Annual 200% 60% 20% 5% INSIGNIFICANT
Probability 0.5%
A – ALMOST CERTAIN 10-1 VH VH VH H M or L (5)
-2
B - LIKELY 10 VH VH H M L
C - POSSIBLE 10-3 VH H M M VL
D - UNLIKELY 10-4 H M L L VL
-5
E - RARE 10 M L L VL VL
-6
F - BARELY CREDIBLE 10 L VL VL VL VL
Notes: (5) For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
(6) When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
time.
RISK LEVEL IMPLICATIONS
Risk Level Example Implications (7)
Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
VH VERY HIGH RISK options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
property.
Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
H HIGH RISK
risk to Low. Work would cost a substantial sum in relation to the value of the property.
May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
M MODERATE RISK implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
implemented as soon as practicable.
Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
L LOW RISK
required.
Acceptable. Manage by normal slope maintenance procedures.
VL VERY LOW RISK
Note: (7) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
given as a general guide.
Australian Geomechanics Vol 42 No 1 March 2007
68039 Landslide Risk Management Issued 10/7/07
Page 16
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION
GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL Obtain advice from a qualified, experienced geotechnical practitioner at early Prepare detailed plan and start site works before
ASSESSMENT stage of planning and before site works. geotechnical advice.
PLANNING
SITE PLANNING Having obtained geotechnical advice, plan the development with the risk Plan development without regard for the Risk.
arising from the identified hazards and consequences in mind.
DESIGN AND CONSTRUCTION
Use flexible structures which incorporate properly designed brickwork, timber Floor plans which require extensive cutting and
or steel frames, timber or panel cladding. filling.
HOUSE DESIGN
Consider use of split levels. Movement intolerant structures.
Use decks for recreational areas where appropriate.
SITE CLEARING Retain natural vegetation wherever practicable. Indiscriminately clear the site.
ACCESS & Satisfy requirements below for cuts, fills, retaining walls and drainage. Excavate and fill for site access before
DRIVEWAYS Council specifications for grades may need to be modified. geotechnical advice.
Driveways and parking areas may need to be fully supported on piers.
EARTHWORKS Retain natural contours wherever possible. Indiscriminatory bulk earthworks.
Minimise depth. Large scale cuts and benching.
CUTS Support with engineered retaining walls or batter to appropriate slope. Unsupported cuts.
Provide drainage measures and erosion control. Ignore drainage requirements
Minimise height. Loose or poorly compacted fill, which if it fails,
Strip vegetation and topsoil and key into natural slopes prior to filling. may flow a considerable distance including
Use clean fill materials and compact to engineering standards. onto property below.
FILLS Batter to appropriate slope or support with engineered retaining wall. Block natural drainage lines.
Provide surface drainage and appropriate subsurface drainage. Fill over existing vegetation and topsoil.
Include stumps, trees, vegetation, topsoil,
boulders, building rubble etc in fill.
ROCK OUTCROPS Remove or stabilise boulders which may have unacceptable risk. Disturb or undercut detached blocks or
& BOULDERS Support rock faces where necessary. boulders.
Engineer design to resist applied soil and water forces. Construct a structurally inadequate wall such as
Found on rock where practicable. sandstone flagging, brick or unreinforced
RETAINING
Provide subsurface drainage within wall backfill and surface drainage on slope blockwork.
WALLS
above. Lack of subsurface drains and weepholes.
Construct wall as soon as possible after cut/fill operation.
Found within rock where practicable. Found on topsoil, loose fill, detached boulders
Use rows of piers or strip footings oriented up and down slope. or undercut cliffs.
FOOTINGS
Design for lateral creep pressures if necessary.
Backfill footing excavations to exclude ingress of surface water.
Engineer designed.
Support on piers to rock where practicable.
SWIMMING POOLS Provide with under-drainage and gravity drain outlet where practicable.
Design for high soil pressures which may develop on uphill side whilst there
may be little or no lateral support on downhill side.
DRAINAGE
Provide at tops of cut and fill slopes. Discharge at top of fills and cuts.
Discharge to street drainage or natural water courses. Allow water to pond on bench areas.
SURFACE Provide general falls to prevent blockage by siltation and incorporate silt traps.
Line to minimise infiltration and make flexible where possible.
Special structures to dissipate energy at changes of slope and/or direction.
Provide filter around subsurface drain. Discharge roof runoff into absorption trenches.
Provide drain behind retaining walls.
SUBSURFACE
Use flexible pipelines with access for maintenance.
Prevent inflow of surface water.
Usually requires pump-out or mains sewer systems; absorption trenches may Discharge sullage directly onto and into slopes.
SEPTIC &
be possible in some areas if risk is acceptable. Use absorption trenches without consideration
SULLAGE
Storage tanks should be water-tight and adequately founded. of landslide risk.
EROSION Control erosion as this may lead to instability. Failure to observe earthworks and drainage
CONTROL & Revegetate cleared area. recommendations when landscaping.
LANDSCAPING
DRAWINGS AND SITE VISITS DURING CONSTRUCTION
DRAWINGS Building Application drawings should be viewed by geotechnical consultant
SITE VISITS Site Visits by consultant may be appropriate during construction/
INSPECTION AND MAINTENANCE BY OWNER
OWNER’S Clean drainage systems; repair broken joints in drains and leaks in supply
RESPONSIBILITY pipes.
Where structural distress is evident see advice.
If seepage observed, determine causes or seek advice on consequences.
Australian Geomechanics Vol 42 No 1 March 2007 113
Page 17
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007 114 Australian Geomechanics Vol 42 No 1 March 2007
Page 18
Limitations This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is accepted for the use of this document, in whole or in part, for any other purpose. The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions and limitations. Tectonic did not perform a complete assessment of all possible conditions or circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do not assume it has been provided. If a matter is not addressed, do not assume that any determination has been made by Tectonic in regards to it. Conditions may exist which were undetectable given that economic and time constraints limit the practical extent of geotechnical investigation. Variations in conditions may occur between investigation locations, and there may be special conditions pertaining to the site which have not been revealed by the investigation and which have not therefore been taken into account in the document. Where variations exist on site, additional studies and actions may be required. Tectonic’s opinions are based upon information that existed at the time that the work was performed. The passage of time, man-made or natural events, may alter the site conditions. It is understood that the Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time the site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the site, or its surroundings, or any laws or regulations. Any assessments made in the preparation of this document are based on the conditions indicated from published sources and the findings of the investigation described. Actual subsurface conditions may differ from those indicated in the document (e.g. between boreholes or test pits). No warranty is included, either express or implied, that the actual conditions will conform exactly to the assessments contained in this document. Where data supplied by the client or other external sources, including previous site investigation data, have been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is accepted by Tectonic for incomplete or inaccurate data supplied by others. This document is provided for the sole use by the Client and its professional advisers. No responsibility whatsoever for the contents of this document will be accepted to any person other than the Client. Any use which a third party makes of this document, or any reliance on or decisions to be made based on it, is the responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this document. Limitations August 2024 | Rev2
Used in these records
App C - Slope Stability - 14-16 Duke St.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.