Attachment 2 - Body Corporate Authorisation Resolution · 51987.2949.6
LEGEND :
Add power points
: EXISTING ITEMS in new mirror cabinet
Under-floor heating, full re-tile & re-fit over new vanity & basins.
Tile - inset strip drains / floor wastes Tapware location TBC Under-floor heating, full re-tile & re-fit
by contractor & INt. designer New bath tub, shower screen, shower hob,
Heated ladder towel rail vanity, toilet, tapware, fixtures, tiling, fittings, lighting
C2 C F B A
Add hi-powered Exhaust
Add lighting A1 Instant hot water service re-located
fan to ducted system
power points
Re-glass existing skylight glass
Clear new toilet suite
with in-wall cistern General Notes :
Add lighting & update power points to interior designers spec.
MRCab Spot lighting in WI Robe and at steps.
Replace existing Awning window sk sk bth tub shwr
BHd 470h
with double hung window shwr
Ens All floor tiling to be removed & replaced to ID Sel.
Robe
Obscure glass lower half
REPLACE
GLASS
ROOF
HTr
Bath Bed Rm 2 Note, use insulating, underlay / glue.
raked BH
Top Half clear HTr
1750h
Trh
sk re-level dip in floor All carpets to be removed & replaced with underlay to ID Sel.
New vanity & basin 11-08DH
dry
Cpd MRCab
with Mirror cab over and tub New plasterboard ceiling on battens with sound inulation through-out.
sk wm
power points hidden inside
IW03 IW03
Relocate HWS All new glazing to be double glazed.
L/dry
Robe
UD 0.66x1.47 Shu UD 0.66x1.47 Shu
& Re-do Laundry shelving & storage
C2 WIR
16-08DH 16-08DH
E Passage Entry E
Entry
Slab infill Foam & Slab infill
Robe to ENGR spec. WF end
step step step
Insulated sound Robe 2x windows :
Apl
reducing pb ceiling remove old shutters, install double glazed
on iso-battens glass
Areas : (Internal Wall, GFA)
E1 E1 double hung windows with shutters to inside
DW
mir drs.
throughout.
new LB col's & beams. to ENGR spec.
Proposed :
Together with
Bed Rm 1 Lounge
rubber stick round FC cover over. Approx. 165mm Ø Living : 92.5 + 20 = 112.5 m²
matting provided
ohc
sk new kitchen joinery, fixtures & appliances
by client. Terrace : 45 m²
wall removal or relocation to be
Sel. new ceiling fans.
WF end
confirmed with Engineer TOTAL : 157.5 m² (same as existing)
confirm pos. on site
F
Water supply to fridge icemaker
Lockable red wine ub fridge with cabinets above
F
ACH
ACH
Retreat Power for desk
Dining Concrete slab topped to match existing floor
ea. side of wall height with foam infill panels to ENGR spec.
Slab infill Col. in wall to ENGR spec.
D1 D1
lightweight concrete As there is no cavity to this wall portion,
2723 to slab over w/proofing treatment to inside of wall
27-33 SGD 27-59 SGD will be required as a minimum
line of slab above 880h Wall over
31° Raking wall
31° Raking wall
D Re-render facia.
D 120h x 180w recess in ceiling for R/blinds
As there is no cavity to this wall portion,
Install new fold-out awning step Contractor to confirm existing awning
w/proofing treatment to inside of wall
to match exstg will work with deck height on-site
will be required as a minimum tiles up Raised
to sides Recess new doors down into slab edge to provide
Sun Deck minimum step down to terrace floor
tiles up step
and over
glz bal.
glz bal.
Re-render side-wall wall Provide blocking / recess in wall for fold-down desk
+320 440h wall
STRUCTURAL ENGINEERS :
+660 Planter box
TOD CONSULTING Re-water-proof planter-box
07 5449 9600
[email protected] Relocate tap in Remove, replace
garden to wall w/proofing & tiles / pavers New Raised Deck (removable) approx. 300mm Above FFL
BUILDER : W/proof under with drain
Remove existing tiles, Re- Replace glass to match joints
Troy Shelley
Quality Assured Building waterproof and Re-tile R11 as above unit low masonry wall under as drain
PROPOSED FLOOR PLAN
PO Box 833 C Re- do glass panels with larger
1:100
Tewantin QLD 4565 B A panels as per above / below units
PH: 0402 200 048 F SCALE 1 : 100
ACN: 606938112 A1
Lic No. 1030629 0 5m
CD-02 For Client / Council Approval 12-08-22
PRELIMINARY
DESIGN / DRAWN : ( NOT FOR CONSTRUCTION )
FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER SCALED MEASUREMENTS, CD-01 For Client / Council Approval 27-07-22
Robert Patterson GEOFF COLLINSON ADDITIONS & RENOVATIONS TO RESIDENCE AT 19/1 MORWONG DR,
QBSA Lic.No. 1095554
VERIFY ALL ON SITE DIMENSIONS AND LEVELS PRIOR TO THE COMMENCEMENT
EXSTG-01 For Site Check & Discussion 27-06-22 A3 202213
m : 0401 394 964 OF ANY CONSTRUCTION. CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY
e : [email protected] OF ANY DISCREPENCIES.
CLIENT JOB DESCRIPTION NOOSA HEADS
ISSUE DESCRIPTION DATE SHT SIZE. DWG NO.
CD.3
COPYRIGHT : No reproduction of all or part of this drawing may be undertaken without the express written permission of the author. NOTE : These drawings to be read in conjuntion with structural engineers drawings
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Body Corporate Authorisation Resolution .pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.