Decision Notice - Approved by Delegation of Authority - MCU25 0054 & OPW25 0077 (As Published) · MCU25/0054

of 21

Text shows just the words. Original shows the document exactly as it was published.

                      Sustainability
               6.     Council encourages sustainable and energy efficient building design for all development,
                      including the use of sustainable building materials, energy efficient fittings, solar hot water,
                      photovoltaic systems (including the use of inverter/charges), solar panels, water saving
                      devices and rainwater harvesting.
                      Performance Bond
               7.     Where the works include Council assets (construction of new or modifications to existing) a
                      portion of the performance bond will be retained as a “maintenance bond” as described in
                      Council’s Planning Scheme Policy 6 Engineering Design Standards. Alternatively, the
                      developer may submit a separate “maintenance bond” at the completion of the works.
                      The bond amount will be:
                      a.      5% of the agreed value of the works or
                      b.      $1500, whichever is the greater amount
                      Fires in Urban Areas
               8.     In urban areas fires are prohibited except where in an appliance is used for domestic heating
                      or cooking purposes, which must comply with particular standards. Any area identified as a
                      fire pit area on approved plans is to be in accordance with Local Law & Subordinate Local
                      Law No. 3, Schedule 3. Refer to the following link for details:
                      https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
               DEMOLITION WORKS
               9.     Please be advised that the building work, in accordance with section 71 of the Building Act
                      1975, must substantially start within 2 months and must be completed within 1 year after the
                      issue of the building development approval.
               10.    Where required, a temporary crossing must be provided to protect road reserve infrastructure
                      including kerb and channel.
               11.    Any damage to footpaths. Street plantings, natural vegetation/trees, kerb and channel,
                      bridges or roadways at the removal/demolition site must be repaired or reinstated to at least
                      pre-existing conditions.
               12.    All building materials containing asbestos products are wrapped and disposed of in
                      accordance with the Public Health Regulation 2018 and the Environmental Protection
                      Regulation 2019.
               13.    NOTE: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
                      businesses that transport asbestos waste, and landfills that accept this waste.
               14.    Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
                      requires a licensed asbestos removalist to give notice to Workplace Health and Safety
                      Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
                      commences. Notification must be made using Form 65: Notification of licensed asbestos
                      removal work, demolition work or emergency demolition.
               15.    The ‘Plumbing and Drainage Regulation 2019’ states that at demolition or removal of a
                      building requires the existing sanitary drain upstream from the connection point for a service
                      provider’s sewerage system must be sealed water tight. This work is deemed as Notifiable
                      Work and must be carried out by a suitably licenced plumber who shall submit an As
                      Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
                      Construction Commission) within 10 days of completing the work.




                                                                                                      Page 16 of 21
Document Set ID: 24087855
Version: 5, Version Date: 03/09/2025

Used in these records

About this file

File size
211 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority - MCU25 0054 & OPW25 0077 (As Published).pdf · 211 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.