Skip to the record
Accept no substitutions.

Council archive · source document

Decision Notice - Approved by Delegation of Authority - MCU25 0054 & OPW25 0077 (As Published) · MCU25/0054

of 21

Text shows just the words. Original shows the document exactly as it was published.

                              DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW25/0077)
                                       (DRAINAGE WORK, STORMWATER & EARTHWORKS)
                      Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.            Rev.   Plan/Document Name                           Date

                        00461-OW3.1         N.A    Earthworks Plan                              April 25
                                                   Prepared by SCG Consulting

                        00461-OW3.2         N.A    Earthworks Sections Sheet 1                  April 25
                                                   Prepared by SCG Consulting

                        00461-OW3.3         N.A    Earthworks Sections Sheet 2                  April 25
                                                   Prepared by SCG Consulting

                        00461-OW4.1         N.A    Driveway & Access Plan                       April 25
                                                   Prepared by SCG Consulting

                        00461-OW4.2         N.A    Driveway Details                             April 25
                                                   Prepared by SCG Consulting

                        00461-SW1.1         N.A    Stormwater Management Plan Basement April 25
                                                   Level
                                                   Prepared by SCG Consulting

                        00461-SW1.2         N.A    Stormwater Management Plan Ground April 25
                                                   Level
                                                   Prepared by SCG Consulting

                        24                  DA05   Landscape Ground                             1.08.2025
                                                   Prepared by Skale Building Design

                        25                  DA05   Landscape First                              1.08.2025
                                                   Prepared by Skale Building Design

                        26                  DA05   Landscape Second                             1.08.2025
                                                   Prepared by Skale Building Design

                        27                  DA05   Landscape species                            1.08.2025
                                                   Prepared by Skale Building Design

                        28                  DA05   Tree Planting Detail                         1.08.2025
                                                   Prepared by Skale Building Design




                                                                                                  Page 8 of 21
Document Set ID: 24087855
Version: 5, Version Date: 03/09/2025

Used in these records

About this file

File size
211 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority - MCU25 0054 & OPW25 0077 (As Published).pdf · 211 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.