21556-C001_C500 & SWCLC - full set
Attached to the e-mail 25 Pavilion St - Response to information Request - OPW22/0104.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
9
E
8
7
6
E
600
E
PROVISION FOR FUTURE EXTENSION. FH
E
S S S TERMINATE MAIN WITH END OF LINE HYDRANT W
W
AS PER STD DRG SEQ-WAT-1302-1.
CONTINUES BELOW
E
E
S
100 x 100 TEE
E
W
E
S
SC
E
SV FH
S
E E E E E E E E E
SC
E
S
E
E
E
S E
W
S
S E
S E
S
E
S E W
W
SC
E
S E
S S S S S S S S S S S S S S S
E
E E E E E E E E E E E E E E E E E E
S
W W W W
TERMINATE MAIN WITH END OF LINE HYDRANT
AS PER STD DRG SEQ-WAT-1302-1
S
S
#23
S
20SP316902
1
2
S
10 5 4 3
E LEGEND
LEGEND UNITYWATER NETWORK WORKS STANDARD DESIGN DRAWING NOTES
EXISTING WATER
1. ALL DESIGN OF WATER SUPPLY NETWORK WORKS SHALL BE IN ACCORDANCE WITH THE WATER SUPPLY CODE OF AUSTRALIA, SOUTH
EXISTING SEWER
E
EAST QUEENSLAND SERVICE PROVIDERS EDITION VERSION 1.3 (AUGUST 2019), PART 1: PLANNING AND DESIGN AND PART 3: DRAWINGS.
EXISTING DRAINAGE
EXISTING TELCO 2. ALL CONSTRUCTION OF WATER SUPPLY NETWORK WORKS SHALL BE IN ACCORDANCE WITH THE WATER SUPPLY CODE OF AUSTRALIA,
SOUTH EAST QUEENSLAND SERVICE PROVIDERS EDITION VERSION 1.3 (AUGUST 2019), PART 2: CONSTRUCTION AND PART 3: DRAWINGS.
EXISTING ELECTRICITY (OVERHEAD)
E
#27 PROPOSED WATER MAIN Ø100 U.N.O. 3. ALL PRODUCTS AND MATERIALS USED IN CONSTRUCTION OF WATER SUPPLY NETWORK WORKS SHALL BE IN ACCORDANCE WITH THE
1RP189023 FH SV
PROPOSED HYDRANT & VALVE SOUTH EAST QUEENSLAND CODE ACCEPTED CIVIL INFRASTRUCTURE PRODUCTS AND MATERIAL LIST, AND THE MOST RECENT VERSION
W PROPOSED WATER METER OF THE LIST IN EFFECT AT THE DATE OF THE CONSTRUCTION PRE-START MEETING.
E SC SC PROPOSED WATER SERVICE CONDUIT 4. CONSTRUCTION WORKS SHALL BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION. WORKS NOT COMPLYING WITH THIS
TAKE OFF NEW MAIN FROM EXISTING FH. E
S PROPOSED SEWER REQUIREMENT WILL NOT BE PERMITTED TO CONNECT INTO UNITYWATER'S WATER SUPPLY NETWORK.
REFER NOTES 4, 5 & LIVE WORKS SCHEDULE. E PROPOSED ELECTRICAL
E 5. ALL LIVE WORKS ASSOCIATED WITH THE WATER SUPPLY NETWORK SHALL BE CARRIED OUT AT THE DEVELOPER'S COST BY QUOTATION
PROPOSED DRAINAGE REQUEST TO UNITYWATER PRIVATE WORKS ONLY.
E
6. THE CONSTRUCTOR SHALL VERIFY THE LOCATION AND DEPTH OF EXISTING SERVICES WITH RELEVANT ASSET OWNERS AND
AUTHORITIES BEFORE COMMENCING WORKS.
STREET
FH
7. PRIOR TO COMMENCEMENT OF ANY VARIATION WORKS, THE CONSTRUCTOR MUST FIRST OBTAIN APPROVAL FROM THE REGISTERED
E
TOD CONSULTING ON 03.05.2022 CERTIFY THAT: MAJOR CONNECTIONS CERTIFIER.
CONTINUES ABOVE
1. THIS PLAN HAS BEEN ASSESSED IN ACCORDANCE WITH THE SEQ CODE;
2. THE CONSTRUCTION OF THE WORKS MUST ONLY BE UNDERTAKEN IN
E
ACCORDANCE WITH THIS PLAN; AND
3. NO VARIATIONS OR AMENDMENTS ARE PERMITTED EITHER BEFORE OR
DURING CONSTRUCTION WITHOUT THE APPROVAL OF UNITYWATER. GENERAL WATER SUPPLY NOTES
E
SIGNED 1. REFER DRAWING C001 FOR GENERAL PROJECT NOTES.
E E E E E E E E E
2. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING SERVICES BEFORE COMMENCING WORK.
E
E
3. ALL MAINS SHALL BE LOCATED ON A 1.5m ALIGNMENT FROM THE PROPERTY BOUNDARY U.N.O.
4. ALL MAINS, THRUST BLOCKS AND BULKHEAD/TRENCHSTOPS SHALL BE CONSTRUCTED IN ACCORDANCE WITH SEQ CODE STANDARD
\\tod-fs02\dropbox\2021\21556SD2_25 Pavilion St, Pomona - Subdivision\4.CADD\#ACAD\2.OPW\#21556_CI_OPW.dwg
DRAWINGS SEQ-WAT-1200 SERIES.
WARNING
LIVE WATER WORKS SCHEDULE 5. HYDRANTS AND VALVES SHALL BE CONSTRUCTED IN ACCORDANCE WITH SEQ CODE STANDARD DRAWINGS SEQ-WAT-1300 SERIES.
OVERHEAD POWER DEPTH
IN VICINITY OF WORKS NO DESCRIPTION DIA LOT NO SL IL
TO IL 6. SERVICE TAPPING CONNECTIONS, CONDUIT CROSSINGS AND WATER SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH SEQ
LOOK UP & LIVE
PAVILION
CONNECTION TO EXISTING WATER MAIN
CODE STANDARD DRAWINGS SEW-WAT-1100 SERIES.
1(A) CONTRACTOR TO LAY NEW WATER MAIN UP TO EXISTING FH. 100 ROAD - - -
DIAL BEFORE 1(B) FOLLOWING SUCCESSFUL "ON MAINTENANCE" INSPECTION OF THE NEW RESERVE
YOU DIG WATER MAIN, UNITYWATER TO MAKE FINAL CONNECTION TO EXISTING FH.
www.1100.com.au
IT IS THE RESPONSIBILITY OF THE FOREMAN TO CONTACT
THE RELEVANT SERVICE AUTHORITIES TO ASCERTAIN THE
EXACT LOCATION OF SERVICES PRIOR TO CONSTRUCTION.
SERVICES SHOWN ON THESE DRAWINGS ARE APPROX ONLY
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
JF DR
This drawing is subject to
copyright in accordance with
SURVEYORS & PLANNERS JNE DEVELOPMENTS P/L 25 PAVILION ST, POMONA WATER SUPPLY PLAN 1: 250 A1
the agreement between TOD LAND SURVEYING DYNAMICS (LSD) Designed Verified
Consulting Pty Ltd (tc) and tc's
p 0412 666 516 JF DR RESIDENTIAL SUBDIVISION Drawing Number
client. This drawing shall only
be used for this specific project.
C 25.05.22 IR : ELECTRICAL DESIGN ADDED JF
e [email protected] Approved RPEQ No RP DESCRIPTION 21SP316902 21556-C500
This drawing shall not be used w www.landsurveyingdynamics.com Noosa: 07 5449 9600 Sunshine Coast: 07 5329 3190 D. REYNOLDS 9072 LOCAL AUTHORITY NOOSA SHIRE COUNCIL
B 03.05.22 UNITYWATER A&C SUBMISSION JF MCU APPROVAL - HORIZ DATUM MGA 2020 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as PO Box 61, Noosaville, QLD 4566 Signed
A 11.04.22 OPW SUBMISSION JF [email protected] www.todconsulting.com ROL APPROVAL RAL21/0017 VERT DATUM AHD
'Issued For Construction' in the
revision description. Rev Date Revision Description Drawn ABN 39 128 805 336 25.05.22 OPW APPROVAL - RL DATUM (PSM112428) 98.616 MEASUREMENT BAR - INCREMENTS IN mm 13 of 14 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.